• Title/Summary/Keyword: Progress Measurement Model

Search Result 81, Processing Time 0.033 seconds

Standardized Progress Measurement Package (건설진도율 산정을 위한 진도관리단위에 관한 연구)

  • Jung Youngsoo;Kang Seunghee;Chin Sangyoon;Kim Yeasang;Chung Moonhun;Park Soonchan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.565-570
    • /
    • 2004
  • The construction Progress is widely used 3s a critical index for effective project management. However, the methods, structure, data, and accuracy of progress measurement may vary depending on specific characteristics of the project, organization, or location. Even in an organization, different projects may utilize different measurement methods to effectively achieve their own management purpose. The excessive effort required to manipulate very detailed progress data is also an issue Therefore the purpose of this study is to dove]op an automated progress measurement model utilizing standard progress measurement package (SPMP).

  • PDF

A Study on Measurement of SERVQUAL and SERVPERF Measurement - A Sightsee- ing quality of Service to the centers - (SERVQUAL 측정과 SERVPERF 측정 이론 연구 -관광 서비스 품질을 중심으로-)

  • Kim, Chul-Jung
    • The Journal of Information Technology
    • /
    • v.9 no.3
    • /
    • pp.33-47
    • /
    • 2006
  • We will can do quality of measurement of service that thing is quite abstract concept. Generally, we speak Service of quality that property of a product, usability of use, social quality requirement to a quality of service by wide meaning. A purpose of this study was comparison regarding a way to measure of service quality, and in the insufficient section there was anything, and progress of model study of service left no matter how much focus to it. There is comparative study a few progress of literature of a PZB, SERVQUAL, SERVPERF, model. Desarbo, Huff, Rolandelli, & Choi, (1994: 125-131) proposed that to solve the above model contradiction point, and Presentation called a plan based on to Conjoint analysis. There is Critical point to decide on priority order of proposed model of service measurement. This study has a lot of the pieces which are short by absence of empirical study, but will make a supplementation in next term study.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

The Development of Coating Weight Model and Control Logics in Continuous Galvanizing Line

  • Kook, Chae-Hong;Tae, Shin-Ki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.121.5-121
    • /
    • 2001
  • For the last decade, remarkable progress in the coating weight uniformity of hot dip galvanized product has been made to overcome the tightening quality constraints and produce cost-effective galvanized products. This progress results from research and development works for more efficient air knife, more accurate model of coating process, more precise measurement of coating weight and more efficient control logics. The activities for an efficient mathematical model to predict coating weight and several control logics which has been implemented on the No.1 CGL, No. 2 CGL, and PGL at KwangYang Steel Works are reviewed in this article.

  • PDF

Magnetocardiogram Measurement of Laboratory Rat (백서를 이용한 심자도 신호 측정)

  • Kim, I.S.;Ahn, San;Kwon, H.C.;Song, J.H.
    • Progress in Superconductivity
    • /
    • v.11 no.2
    • /
    • pp.147-151
    • /
    • 2010
  • We have developed a high-$T_c$ SQUID magnetocardiogram (MCG) system for small laboratory animals. White noise of the measurement system was about 30 fT/$Hz^{1/2}$ when measured in a magnetically shielded room. We optimized the measurement position to obtain clear MCG wave from rat's small heart by using grid measurements. With the optimization, the MCG signal was successfully detected with the peak amplitude of about 30 pT. We could observe well defined P-, QRS-, and T-waves from the rat MCG. The results suggest that the developed system has a strong potential to monitor the progress of the heart disease model by using a laboratory rat.

A Measuring Model of Risk Impact on The App Development Project in The Social App Manufacturing Environment (Social App Manufacturing 환경의 앱 개발 프로젝트에서 위험영향도 측정 모델)

  • Baek, Jung Hee;Lim, Young Hwan
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.9
    • /
    • pp.335-340
    • /
    • 2014
  • Crowd Sourcing-based Social App Manufacturing environment, a small app development project by a team of anonymous virtual performed without the constraints of time and space, and manage it for the app development process need to be automated method. Virtual teams with anonymity is a feature of the Social App Manufacturing, is an important factor that increases the uncertainty of whether the completion of the project or reduction in visibility of the progress of the project. In this study, as one of how to manage the project of Social App Manufacturing environment, the impact of risk that can be used to quantitatively measure the impact of the risk of delay in development has on the project also proposes a measurement model. Effects of risk and type of the impact of risks associated with delays in the work schedule also define the characteristic function, measurement model that has been proposed, suggest the degree of influence measurement equation of risk of the project in accordance with the progressive. The advantage of this model, the project manager is able to ensure the visibility of the progress of the project. In addition, identify the project risk of work delays, and to take precautions.

Characteristics of Radiated Electromagnetic Waves with discharge propagation in Model GIS being Insulation Particle (모의 GIS 내부에 유전체 파티클 존재시 방전진전에 따른 방사전자파 특성)

  • Park, K.S.;Yoon, D.H.;Lee, H.C.;Kim, L.K.;Lee, D.H.;Kim, K.C.;Lee, K.S.
    • Proceedings of the KIEE Conference
    • /
    • 2004.07c
    • /
    • pp.2006-2008
    • /
    • 2004
  • In this paper the imitated electric defect was simulated by insulation particle in the model GIS. This paper studied the distribution of frequency spectrum of the radiated electromagnetic waves using antenna (30-2,000[MHz]) and spectrum analyzer. From results of this study, a new method was introduced for measurement and analysis of the radiated electromagnetic waves in accordance with discharge progress of each defect in the model GIS. It was confirmed that detecting partial discharge and estimating discharge progress can be possible in the model GIS.

  • PDF

Rat Magnetocardiograms Measured by YBCO SQUID Magnetometer (YBCO SQUID를 이용한 실험쥐의 심자도 측정)

  • Ahn, San;Kim, I.S.;Song, J.H.
    • Progress in Superconductivity
    • /
    • v.12 no.2
    • /
    • pp.124-128
    • /
    • 2011
  • We have developed a high-$T_C$ SQUID magnetometer system to measure magnetocardiograms of laboratory rats. White noise of the measurement system was about 50 fT/$Hz^{1/2}$ when measured in a magnetically shielded box. We optimized the measurement position to obtain clear MCG wave from rat's small heart by using grid measurements. With the optimization, the MCG signal was successfully detected with the peak amplitude of about 50 pT. We could observe well defined P-, QRS-, and T-wave from the rat MCG. The results suggest that the developed system has a strong potential to monitor the progress of heart disease model using laboratory rat.

Construction Of The Measurement Model Of User Satisfaction In Internet Shopping Environment -Based On The End-Use Computng Satisfaction Instrument -

  • Kim, Tae-Hwan
    • International Commerce and Information Review
    • /
    • v.8 no.1
    • /
    • pp.3-13
    • /
    • 2006
  • To develop and validate an instrument to measure user satisfaction in Internet shopping environment, the EUCS instrument by Doll and Torkzadeh (1988) was used for this research. The results of the study shows how the main constructs of the model that will eventually interact for the user satisfaction in internet commerce environment. This research will present significant progress towards keeping the End-User Computing Satisfaction instrument relevant and applicable under the Internet shopping environment.

  • PDF

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF