The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.
Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
국제학술발표논문집
/
The 5th International Conference on Construction Engineering and Project Management
/
pp.145-150
/
2013
As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.
Salim, Shelly;Kim, Jin Il;Yeom, Choong Sub;Park, Jong Sun
시스템엔지니어링학술지
/
제14권1호
/
pp.52-62
/
2018
A software support system, called procurement engineering management support system (PeMSS), is currently under development through a joint research project. The procurement-related scenarios considered in this research is as follow: an EPC (Engineering, Procurement and Construction) company receives an EPC project contract and starts the project to deliver the agreed system to the acquirer. In order to acquire the required equipments that the EPC company does not produce by itself, it eventually interacts with subcontractors, also called vendors. The EPC company responsibilities during the procurement activities are twofold. First, the EPC company has to guarantee that it has ordered the equipment, through issuing Purchase Order (PO), based on the requirements stated in the contract. Second, the EPC company has to verify that the received equipment designs, called Vendor Print (VP), meet the specifications in the PO, before finally acquiring the equipments. During our survey study, we discovered that EPC company takes a lot of time and effort to create PO and verify VP, mainly because these activities are performed manually by the responsible engineers. Therefore, we intent to support the above activities by developing a support system to the legacy procurement system that can trace the requirements from the contract to the PO and VP, among other functionalities. At the time of the writing of this paper, PeMMS is still under-development, thus, in this paper we focus on presenting the development steps of PeMMS using systems engineering theory and introducing the PO creation function. Wholly, PeMSS attempts to reduce the time and effort of engineers on the procurements activities while also increasing the quality of the procurement outcomes.
This paper is based on the interim result of ongoing research and development project to develop a software system which support procurement activities, namely PeMSS (Procurement Engineering Management Support System). PeMSS is a system that enables development requirements for each equipment and help designing equipment meeting the purchase requirements. Procurement at EPC (Engineering Procurement and Construction) and operational stage of a plant is an important area that determines the integrity and profitability of the plant. Procurement of unsuitable equipment due to selection of suppliers that do not meet or omit critical requirements in purchase specification can result in enormous cost increase due to such as delay in EPC project, unsatisfactory performance and reduced plant operation time. In spite of the importance of the procurement engineering, there is a lack of support system for systematic preparation of purchase specification, so development of the procurement specification is basically relying on the experience of the engineers in charge. Accordingly, it is needed to develop the PeMSS to help procurement engineers develop procurement specification based on systems engineering approach. This paper introduces the design of the PeMSS.
Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.375-380
/
2009
Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.
국제 고유가에 힘입어 최근 중동의 산유국 중심으로 신규 사업 잘주가 이어지고 있다. 플랜트 산업은 엔지니어링(Engineering)과 조달(Procurement), 시공(Construction)이 융합된 복합산업(EPC)으로 고부가가치 산업이다. 또한 조달부문이 전체 사업비 규모의 70% 이상을 차지하므로 구매조달의 성패가 사업의 성패로까지 이어진다. 그러나 해외에서 다양한 사업참여 주체에 의해 수행되는 사업특성 상 구매조달 업무흐름 전체를 파악하고 원활히 사업을 수행하기란 어려운 실정이다. 따라서 최근 구매 및 조달 업무의 합리화를 통한 이윤창출 노력이 이어지고 있다. 본 연구에서는 해외 프로젝트를 수행하는 국내 주요 건설회사의 기존 구매조달 업무프로세스를 조사${\cdot}$분석하여 적정프로세스를 도출하였다. 또한 업무 프로세스상의 정보 및 문서의 입출력 정보를 분석하였다. 본 연구의 결과는 향후 해외 사업에 참여하게 되는 신규 업체의 인력 교육과 실무 활용에 이해를 도울 수 있는 자료로 활용될 수 있을 것으로 기대하며, 구매조달 업무 시스템 개발을 위한 자료로 활용될 수 있을 것이다.
The 9th International Conference on Construction Engineering and Project Management
/
pp.823-830
/
2022
The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.
In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.
최근 세계 건설시장은 2025년까지 연 평균 4.8%씩 성장할 것으로 예상하고 있으며, 이에 따른 해외건설 리스크도 증가할 것으로 전망하고 있다. 특히, 국내 건설업체들은 EPC(Engineering, Procurement, Construction)/Turnkey 사업에 집중적으로 참여하였지만, 계약적 리스크에 대응하지 못한 결과, 2013년부터 수조원대의 해외사업 손실을 입은 경험이 있다. 그럼에도 불구하고, 지금까지 EPC/Turnkey의 계약적 핵심 리스크 세부조항 도출에 대한 연구는 많지 않았다. 따라서 본 연구에서는 국제컨설팅엔지니어링연맹(FIDIC)에서 발행한 2017년 Silver Book 계약조건을 대상으로 핵심 리스크 세부조항을 연구하였다. 이를 위해서 국제건설계약 경험이 10년 이상인 30인의 전문가를 패널로 구성하여 FIDIC Silver Book 21개 조항 170개 세부조항을 델파이 설문조사를 실시하여 62개의 주요 리스크 세부조항을 도출하였다. 또한, 최종적으로 FMEA(Failure Mode and Effect Analysis)기법을 활용하여 RPN(Risk Priority Number)을 산정하였으며, Critical Risk 범위에 속하는 25개의 핵심 리스크 세부조항을 도출하였다. 본 연구 결과를 통하여 실무관점에서는 해외건설사업에서 입찰 및 계약체결 단계에서 주의 깊게 검토해야 할 계약조항들에 대해 참조할 수 있게 해주고, 학문관점에서는 해외건설 EPC/Turnkey 사업에서 사용되는 계약분야에 대해 어떤 방식으로 연구해야 할지의 방향성과 기초적 지식을 제공하고 있다.
최근 해외 건설시장 플랜트 분야의 수주 증대에 따라 오일 가스 분야의 프로젝트가 증가하고 있다. 따라서 국내 건설 산업 업체들의 해외 플랜트 사업의 경쟁력을 확보하기 위해서는 생산성 향상 기술 경쟁력 확보 전략적 경영 추진 등 적극적인 대처 방안 수립이 요구되고 있다. 그 중에서도 해외 플랜트 사업의 오일 가스 분야는 산업 경쟁력 향상을 위하여 프로젝트 수행과 관련한 EPC(Engineering Procurement Construction) 유통 정보의 활용이 더욱 요구되지만, EPC 단계별 다양한 업무에서 발생하는 유통정보 콘텐츠를 효율적으로 관리하기 위한 콘텐츠 분류체계가 제시되고 있지 못하고 있다. 그로 인하여 설계도면의 변경, 중복업무의 발생, 업무주제간의 정보 누락 등의 문제점이 발생하고 있다. 이런 문제점으로 인하여 시장점유율이 감소하고 있으며 경쟁력이 약해지고 있다. 따라서 본 연구는 오일 가스분야의 콘텐츠 관리체계의 실무적 활용의 증대와 건설산업 정보관리의 효용성을 향상시키기 위하여 콘텐츠 관리 체계를 확립하기 위한 BPM(Business Process Management) 기반의 콘텐츠 분류 체계를 제시하고, 국내기업의 경쟁력이 가장 낮은 설계단계의 Business Process를 정의하고 요구되는 지식의 유형을 체계화하고, 콘텐츠 정보를 분석하여 설계단계 산업설비 유통정보의 체계화를 지원하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.