Journal of Korean Society of Industrial and Systems Engineering
/
v.25
no.3
/
pp.64-77
/
2002
In every sectors of industry, the Business Process Reengineering(BPR) has been applied for taking competitive advantage under rapidly changing environment. A company adopting the BPR has begun to consider the introduction of Enterprise Resource Planning ERP systems. ERP systems can integrates many core activities of business, such as manufacturing management, human resource management, financial management, supply chain management by applying the best practices to facilitate a rapid decision-making, cost reductions, and organizational control. Unfortunately, however, many tentative risk factors are existed through each phase of the introduction of ERP systems. As a result, it can bring an enormous benefits to a company or it can be a disastrous for organization. Therefore, two critical questions regarding the introduction of ERP systems should be analyzed before actual introduction has happened. They are "how can ERP systems be introduced successfully\ulcorner" and "what are the critical success factors for each phase of introduction of ERP systems\ulcorner". Through this research, We studied and analyzed the characteristics of critical success factors requiring at each phase of the introduction of ERP systems by applying the questionnaire survey method. Finally, we suggest the list of barriers and critical success factors for each phase of introduction of ERP systems.tion of ERP systems.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.4
/
pp.2093-2103
/
2014
The purpose of this study is to investigate how the vendor suitability factor affects ERP introduction factors of domestic small and middle businesses and internal performance. When domestic firms introduce an ERP package, they mostly use the package already developed by ERP firms. Therefore, this study tried to analyze that the suitability factor of an ERP package supplier serves as a moderating role for ERP internal performance. The study result showed that the vendor suitability factor played a moderating role for ERP introduction factors and internal performance. In other words, the vendor suitability factor served a moderating role for four factors -CEO support, education/training, users' IT capability, and business standardization /formulation- and internal performance. But, it was analyzed that the vendor suitability factor didn't serve as a moderating role for IT infrastructure and internal performance.
Researches on the introduction of ERP system kept on examining the critical successful factors (CSFs) that focus on factors to achieve effectively successful projects, and trying to measuring the actual effectiveness of the introduction of ERP system. However, most of the preceding researches on the effectiveness of the introduction of ERP system that was searching devoted effects has been ceased, and actually even researches on the economical results have just done the basic cognitive evaluation of result indicators by many questionnaires instead of objective measuring values, because of the difficulty of measuring the evaluation of the result. Moreover, researches on positive effects of the introduction of ERP on enterprise results and researches that failed to give advantageous effects showed different results each other. And a part of researches reported that only a part of result indicators were partially affected. In this research, we investigated Korean large enterprises or middle-sized enterprises in manufacture industry that introduces SAP R/3 and Oracle package to compare their quantitative financial results after the introduction of ERP system, in order to measure the effects of the ERP system. First, we evaluated the difference of the quantitative financial results before and after the introduction of the ERP system. Second, we evaluated the opportunities shown by the effects after the introduction of the ERP system. Third, we removed the sample of the exchange crisis (IMF) and executed the additional analysis to reflect the average increasing and decreasing rate in the industry, so that pure evaluation can be achieved. Inherent limits of precedent researches are removed and practical effects of the pure introduction of the ERP system are evaluated, so the research of this research is significant. The result of this research is as follows. Because of the introduction of ERP, the rate of turnover of inventory property has increased and sales of preparation inventory property have decreased so that more effective inventory property management has been achieved. Moreover, preparation sales of labor costs and preparation sales of the number of employees have decreased to show the effect of the reduction of labor costs. However, it could no be concluded that we could increase the profit due to the introduction of ERP system. Due to the introduction of ERP, although we concluded that the return on assets (ROA) and the additional value of one-person employee statistically showed obvious differences and increased, the return on equity failed to show obvious differences after the process of introduction of ERP.
This study analyzed the moderating role of the suitability factors of corporate strategies and information system strategies targeting small and medium sized transportation companies in Korea. The analytical result has found that the suitable factors of corporate strategies and information system strategies play the moderating role in the ERP introduction factors and internal performance. In other words, the suitability factors of corporate strategies and information system strategies were analyzed to play the moderating role in support of CEOs, education/training, users' IT capabilities, standardization/formulation of business, infrastructure of information technologies, and internal performance. The result of this study based on the above analytical results has found that introduction performance will be maximized when ERP packages are introduced in the small and medium-sized transportation companies and corporate strategies properly harmonize with the introduction strategies of ERP packages in the companies.
Journal of Korea Society of Industrial Information Systems
/
v.12
no.5
/
pp.133-145
/
2007
This study investigated the relationship between introduction characteristics of ERP system, innovation diffusion and business performance in public enterprise. This study tried to suggest plans that can adapt and use critical impact factors on public enterprise performance though diffusion of ERP systems. This study suggests that introduction characteristics affect on vertical innovation diffusion and organizational performance, directly and indirectly.
In this study, for the introduction factors of ERP system suggested in the prior study, I analyzed the importance of each introduction factor by using Delphi methodology and AHP. As a result of analysing the importance of the introduction factors of the 1st layer, the supplier factor was analyzed to be the most important factor among innovation factor, information technology factor, the user factor, the supplier factor, and in the weight analysis on the 2nd layer considering the importance of 1st layer, the standard work model of the supplier factor was a suitable factor, and the CEO participation factor(.086) was analyzed as the second most important introduction factor. These analysis results enable to determine that domestic Small & Medium enterprises' position hope to introduce by selecting a system in which the company characteristics and management strategies are applied well, because they should operate an ERP system that has already been developed, and in this course, the participation of CEO was also found to be a very important factor.
This article identifies factors affecting successful ERP systems by focusing on the stages after stabilizing ERP systems and overcoming temporary performance dip by introduction of ERP systems, and suggests change management tactics to control those identified factors. We can not expect that every users are familiar with the usage of an ERP system even after they are informed about the expected advantage of the newly implemented ERP system and trained intensively for changed business process and system usage while implementing a new ERP system. Moreover, even after more than six months usage of the system, the users may still have some trouble due to the reason why they have insufficient information about the expected advantage of the system (recognition gap) and insufficient knowledge about the changed usage of the system (knowledge gap). Hence, this article diagnoses by conducting a case study that those recognition and knowledge gap would have a severe bad influence upon the users' trust and satisfaction on ERP systems. This article suggests an appropriate change management tactics to overcome those recognition and knowledge gap by considering the relationship with the efforts for change management before, during, and after the introduction of ERP systems and performing an in-depth analysis on the users' dissatisfaction and request for update during the stages after the stabilization of the ERP systems. This article also shows a corroborative evidence that these efforts of change management consequently contributes to the solution of users' distrust and dissatisfaction. In sum, this article identifies the factors influencing badly on the magnitude and seriousness of knowledge and recognition gap, and suggests a conceptual research model which says that the satisfaction of ERP users could be uplifted by the solution of their knowledge and recognition gap if we keep making efforts on appropriate change management considering those identified factors during the stages after the stabilization of an ERP system.
ERP is a new concept which attempts to combine the applications of BRP and information technology in order to enhance the competitive positions of the firms in a rapidly changing environment. It is expected that a paradigm transition will take place which transforms the current practice of in-house development into the introduction of ERP packages. In response to this trend. ERP introduction strategies need to be investigated. This paper reports the case study of Standard Telecom Co. in successfully implementing Oracle ERP applications package. It describes the background, implementation strategy, project management, benefits, and the critical success factors of the Vanguard Project.
The purpose of this thesis is to analyze the success factors of ERP system in corporations and to know what is different in the factors depending on organizational culture and size. Considering there are various results from introduction of the same information technology(IT), it is implied that organizational characteristics make a difference. In this thesis we did factor analysis and multiple regression about the factors based on the previous studies and analyzed the priorities depending on organizational culture and size. The results show that mechanistic organization has key success factors of work process change, project team abilities, and determination of CEO while organic organization has those of work process change and project team abilities. Plus bigger sized organization has success factors of work process change, project team abilities, and determination of CEO while small sized organization has those of work process change and project team abilities.
This study derives the critical success factors through discussion of expert group in operation stage of ERP system that is suggested by the prior study. Relative importance of the derived critical success factors are analyzed using Analytic Hierarchy Process(AHP). In the first layer of the hierarchy, organizational/ human resource factors are appeared to be the most important factors. In the second layer of the hierarchy, CEO support is evaluated as the most important success factor considering the weight of the 1st layer of the hierarchy followed by process optimization, change management, support of the operation department, and maintenance of process innovation organization. This study suggests that, in order to maximize the introducing effect, continuous support and attention of management is not the only requirement. Proper change management to handle the internal environment change caused by the introduction of the ERP system, support of operation department dedicated to ERP system, and separate department for continuous innovation of process are also required.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.