A Study on the Method of Preliminary Works Management for a Schedule Performance Management (공정이행관리를 위한 선행작업관리 시안)

  • Park, Hong-Tae;Song, Young-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.3
    • /
    • pp.757-764
    • /
    • 2008
  • It is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the qualify and schedule management of the construction, We can make systematically preliminary works in accordance with construction schedule by the architecture construction items of the apartment house construction. We suggested important preliminary control item by the workers through experiential method of construction engineers in accordance with network schedule. should not use "we" in technical sentence.

Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects

  • Okmen, Onder
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.21-34
    • /
    • 2013
  • Various risk factors affect construction projects. Due to the uncertainties created by risk factors, actual activity durations frequently deviate from the estimated durations in either favorable or adverse direction. For this reason, evaluation of schedule uncertainty is required to make decisions accurately when managing construction projects. In this regard, this paper presents a new computer simulation model - the Repetitive Schedule Risk Analysis Model (RSRAM) - to evaluate unit-based repetitive building project schedules under uncertainty when activity durations and risk factors are correlated. The proposed model utilizes Monte Carlo Simulation and a Critical Path Method based repetitive scheduling procedure. This new procedure concurrently provides the utilization of resources without interruption and the maintenance of network logic through successive units. Furthermore, it enables assigning variable production rates to the activities from one unit to another and any kind of relationship type with or without lag time. Details of the model are described and an example application is presented. The findings show that the model produces realistic results regarding the extent of uncertainty inherent in the schedule.

Measuring the Impact of Change Orders on Project Performances by Building Type

  • Juarez, Marcus;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.179-187
    • /
    • 2022
  • The project performances can be measured in terms of meeting the project schedule, budget, and conformance to functional and technical specifications. Numerous studies have been conducted to examine the causes and effects of change orders for both vertical and horizontal construction, respectively. However, these studies mainly focus on a single project type, so this paper examines the impact of change order for cost growth and schedule overruns using four different building types to close the gap in the change order research area. A total of 211 building projects are collected from four building types: healthcare, residential, office, and education. Statistical analyses using ANOVA tests and linear regression models are used to examine the created metric $CO/day on the cost and schedule impacts. The results found that mean $CO/day values were not statistically different among building types, and that the sum of change orders is a statistically significant predictor of $CO/day. The results will help project stakeholders mitigate the negative change orders effects can be a challenge for project managers and researchers alike.

  • PDF

A Basic Study for Accumulation of IFC-based Schedule Information (IFC 기반의 공정정보 축적을 위한 기초연구)

  • Song, Jong-Kwan;Choi, Won-Sik;Won, Ji-Sun;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5890-5896
    • /
    • 2013
  • This Study aimed at suggesting the plan for accumulating and utilizing schedule information of IFC file in BIM-based delivery system. For this Propose, First, literature review is conducted for analyzing utilization plan of schedule information and the IFC standard. Second, Schedule Planning process is analyzed to draw Schedule elements, and schedule information items is derived by analyzing schedule process and commercial software. Also, schedule elements in the IFC schema is derived by analyzing IFC schema through drawn schedule information. Finally, this study suggests a concept model accumulating and utilizing Schedule information included in IFC schema, and a conceptual delivery process of BIM model by analyzing BIM Application Guideline for Facility Project by PPS (Public Procurement Service) for accumulating IFC delivery files This study will expects to contribute to accumulate information of BIM model at the point of nationally introducing BIM.

Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis (물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델)

  • Ji, Soung-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

THE ROOT CAUSE ANALYSIS METHOD FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석방법)

  • Ji, Kun-Chang;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.131-136
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity. and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay. Moreover, the analysis method did not consider the trait, which cause the schedule delay, in constructing projects. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

  • PDF

A Case Study on Reason Analysis for Schedule Delay of Apartment House (공동주택의 공기지연 원인분석 사레 연구)

  • Park, Chang-Wook;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.89-94
    • /
    • 2009
  • A study was performed the analysis for the schedule delay of the public housing. To perform this study, the first study existing research literature on the cause of the schedule delay was considered. The based on existing study, this study selected the cause of schedule delay. For check of the schedule delay, this study was compared the monthly schedule and the work diary. Survey was conducted for using the selected cause of schedule delay. And the importance was calculated for using the AHP method. In a case site, the cause of the schedule delay was analyzed. The last, the delay cause was presented the map of cause of effect the based on the delay cause of a case site.

PRODUCTIVITY PREDICTION MODEL BASED ON PRODUCTIVION INFLUENCING FACTORS: FOCUSED ON FORMWORK OF RESIDENTIAL BUILDING

  • Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.58-65
    • /
    • 2011
  • Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.

  • PDF

Development of a Web-based Schedule Tool Using Flash (플래시를 이용한 웹기반 일정관리 도구 개발)

  • Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.51-57
    • /
    • 2010
  • Schedule management of construction work is important in order to complete construction projects within a given period of time. As activities increase and relations become more complex, schedule management software becomes increasingly necessary. To address this, attempts are being made to incorporate web-based ICT (information and communications technology) in construction project management. This research proposed a method to manage construction schedules via web pages using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A prototype was implemented using Flash and Action Script, and it was applied to a sample network in a web page.

A Preliminary Research for Developing System Prototype Generating Linear Schedule (선형 공정표를 생성하는 시스템 프로토타입 개발을 위한 기초 연구)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • Linear scheduling method limits to present works of work breakdown structure as a form of lines and was often developed manually. In other words, linear schedule could not utilize activity, work breakdown structure, and etc. information of network schedule such as CPM(Critical Path Method) and has been used only for reporting or confirming construction master plan. Therefore, it is necessary to develop system which can automatically generating the linear schedule based on the network schedule having many accumulated and useful construction schedule information. Thus, this research has an effort to establish data process model, data flow diagram, and data model in order to make linear schedule. In addition, this research addresses the system solution structure, user interface class diagram and logic diagram, and data type schema. The results of this paper can be used as a preliminary research for developing linear schedule generating system prototype by utilizing the network schedule information.