1 |
J.C. Woolery, K.C. Crandall, "Stochastic network model for planning scheduling", Journal of Construction Engineering and Management, vol. 109, no. 3, pp. 342-354, 1983.
DOI
ScienceOn
|
2 |
H.N. Ahuja, V. Nandakumar, "Simulation model to forecast project completion time", Journal of Construction Engineering and Management, vol. 111, no. 4, pp. 325-342, 1985.
DOI
ScienceOn
|
3 |
R.E. Levitt, J.C. Kunz, "Using knowledge of construction and project management for automated schedule updating", Project Management Journal, vol. 16, no. 5, pp. 57-76, 1985.
|
4 |
L.S. Riggs, "Risk Management in CPM Networks", Computer-Aided Civil and Infrastructure Engineering, vol. 4, no. 3, pp. 229-235, 1989.
|
5 |
M.J. Mawdesley, "Time change charts for scheduling linear projects", Proceedings of the 6th ASCE Conference on Computing in Civil Engineering, pp. 613-620, 1989.
|
6 |
M.A. Ammar, E. Elbeltagi, "Algorithm for determining controlling path considering resource continuity", Journal of Computing in Civil Engineering, vol. 15, no. 4, pp. 292-298, 2001.
DOI
ScienceOn
|
7 |
D.J. Harmelink, J.E. Rowings, "Linear scheduling model: Development of controlling activity path", Journal of Construction Engineering and Management, vol. 124, no. 4, pp. 263-268, 1998.
DOI
ScienceOn
|
8 |
K.G. Mattila, D.M. Abraham, "Resource leveling of linear schedules using integer linear programming", Journal of Construction Engineering and Management, vol. 124, no. 3, pp. 232-244, 1998.
DOI
ScienceOn
|
9 |
A. Oztas, O. Okmen, "Judgmental risk analysis process development in construction projects", Building and Environment, vol. 40, no.9, pp. 1244-1254, 2005.
DOI
ScienceOn
|
10 |
A. Touran, E.P. Wiser, "Monte Carlo technique with correlated random variables", Journal of Construction Engineering and Management, vol. 118, no. 2, pp. 258-272, 1992.
DOI
|
11 |
I.T. Yang, "Risk Modeling of Dependence among Project Task Durations", Computer-Aided Civil and Infrastructure Engineering, vol. 22, no. 6, pp. 419-429, 2007.
DOI
ScienceOn
|
12 |
O. Okmen, A. Oztas, "Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model (CSRAM)", Journal of Construction Engineering and Management, vol. 134, no. 1, pp. 49-63, 2008.
DOI
ScienceOn
|
13 |
R.B. Harris, P.G. Ioannou, "Scheduling projects with repeating activities", Journal of Construction Engineering and Management, vol. 124, no. 4, pp. 269-273, 1998.
DOI
ScienceOn
|
14 |
G.A. Duffy, G.D. Oberlender, D.H.S. Jeong, "Linear scheduling model with varying production rates", Journal of Construction Engineering and Management, vol. 137, no. 8, pp. 574-582, 2011.
DOI
ScienceOn
|
15 |
K. Cho, T. Hong, C. Hyun, "Scheduling model for repetitive construction processes for high-rise buildings", Canadian Journal of Civil Engineering, vol. 38, no. 1, pp. 36-48, 2011.
DOI
ScienceOn
|
16 |
A. Oztas, O. Okmen, "Risk analysis in fixed-price design-build construction projects", Building and Environment, vol. 39, pp. 229-237, 2004.
DOI
ScienceOn
|
17 |
A. Jaafari, "Criticism of CPM for project planning analysis", Journal of Construction Engineering and Management, vol. 110, no. 2, pp. 222-223, 1984.
DOI
ScienceOn
|
18 |
R. Flanagan, G. Norman, "Risk management and construction", Cambridge: Backwell Scientific, 1993.
|
19 |
L. Edwards, "Practical risk management in the construction industry", London: Thomas Telford, 1995.
|
20 |
M. Ranasinghe, A.D. Russell, "Treatment of correlation for risk analysis of engineering projects", Civil Engineering Systems, vol. 9, pp.17-39, 1992.
DOI
|
21 |
S. Selinger, "Construction planning for linear projects", ASCE Journal of Construction Division, vol. 106, no. 2, pp. 195-205, 1980.
|
22 |
O. Moselhi, A. Hassanein, "Optimized Scheduling of Linear Projects", Journal of Construction Engineering and Management, vol. 129, no. 6, pp. 664-673, 2003.
DOI
ScienceOn
|
23 |
K. El-Rayes, O. Moselhi, "Resource-driven scheduling of repetitive projects", Journal of Construction Management and Economics, vol. 16, pp. 433-446, 1998.
DOI
|
24 |
D.B. Ashley, "Simulation of repetitive-unit construction", ASCE Journal of Construction Division, vol. 106, no. 2, pp. 185-194, 1980.
|
25 |
RM. Reda, "RPM: Repetitive project modeling", Journal of Construction Engineering and Management, vol. 116, no. 2, pp. 316-330, 1990.
DOI
|
26 |
A.D. Russell, W.C.M. Wong, "New generation of planning structures", Journal of Construction Engineering and Management, vol. 119, no. 2, pp. 196-214, 1993.
DOI
ScienceOn
|
27 |
T. Hegazy, O. Moselhi, P.Fazio, "BAL: An algorithm for scheduling and control of linear projects", AACE Trans, C8-1-C8-14, 1993.
|
28 |
D. Arditi, M.Z. Albulak, "Line-of-balance scheduling in pavement construction", Journal of Construction Engineering and Management, vol. 112, no. 3, pp. 411-424, 1986.
DOI
ScienceOn
|
29 |
J.J. O'Brien, "VPM scheduling for high-rise buildings", Journal of Construction Division, ASCE, vol. 101, no. 4, pp. 895-905, 1975.
|
30 |
P. Lumsden, "The line of balance method", London: Pergamon Press Ltd, 1968.
|
31 |
D.W. Johnston, "Linear scheduling method for highway construction", Journal of Construction Engineering and Management, vol. 107, no. 2, pp. 247-261, 1981.
|
32 |
O. Stradal, J. Cacha, "Time space scheduling method", Journal of Construction Division, ASCE, vol. 108, no. 3, pp. 445-457, 1982.
|
33 |
N. Sadeghi, A.R. Fayek, W. Pedrycz, "Fuzzy Monte Carlo Simulation and Risk Assessment in Construction", Computer-Aided Civil and Infrastructure Engineering, vol.25, no. 4, pp. 238-252.
|
34 |
Dept of the Navy. "PERT, program evaluation research task", Washington: Phase I Summary Rep., Special Projects Office, Bureau of Ordnance,1958.
|
35 |
A.H.S. Ang, A.A. Chaher, J. Abdelnour, "Analysis of activity networks under uncertainty", Journal of the Engineering Mechanics Devision, vol. 101, no. 4, pp. 373-387, 1975.
|
36 |
C.F. Diaz, F.C. Hadipriono, "Nondeterministic networking methods", Journal of Construction Engineering and Management, vol. 119, no. 1, pp. 40-57, 1993.
DOI
|
37 |
W.C. Wang, L.A. Demsetz, "Application example for evaluating networks considering correlation", Journal of Construction Engineering and Management, vol. 126, no. 6, pp. 467-474, 2000.
DOI
ScienceOn
|
38 |
W.C. Wang, L.A. Demsetz, "Model for evaluating networks under correlated uncertainty-NETCOR", Journal of Construction Engineering and Management, vol. 126, no. 6, pp. 458-466, 2000.
DOI
ScienceOn
|
39 |
R.I. Carr, "Simulation of construction project duration", Journal of Construction Division, ASCE, vol. 105, no. 2, pp. 117-128, 1979.
|