THE ROOT CAUSE ANALYSIS METHOD FOR SCHEDULE DELAY IN CONSTRUCTION

건설공사의 작업지연 원인분석방법

  • Published : 2006.11.11

Abstract

In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity. and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay. Moreover, the analysis method did not consider the trait, which cause the schedule delay, in constructing projects. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

작업의 지연을 줄이거나 예방하기 위해서는 작업지연상황을 지속적으로 확인하여 작업지연을 야기하는 원인을 찾아내고 대책을 세워야 한다. 건설 프로젝트는 동일한 조건하에서도 주변 환경에 따라 결과 값이 다르게 나타나는 일회성이 강한 분야 중에 하나이다. 그래서 지금까지 이루어진 선행연구들은 작업지연기간 산정방법 또는 작업지연의 클레임 사례에 관한 연구와 프로젝트 종료 후 결과에 의한 원인을 제시한 것이 대부분이다. 따라서 공사 진행 중에 발생하는 작업지연에 대해 체계적으로 활용할 수 있는 분석방법과 절차가 필요하다. 본 연구는 작업지연 원인분석 범위를 프로젝트내의 현장관리 분야로 국한하고 작업의 투입요소에 의한 분석과 VSM을 활용한 분석으로 나눴다. 건설업에 적합한 원인분석 방법을 제안하기 위해 기존에 활용되고 있는 분석방법의 특징을 분석하고 건설업의 특징을 분석하여 건설업에 활용이 적합한 방법을 도출하고 절차를 제안하였다.

Keywords