Browse > Article
http://dx.doi.org/10.5762/KAIS.2013.14.11.5890

A Basic Study for Accumulation of IFC-based Schedule Information  

Song, Jong-Kwan (ICT Convergence and Integration Research Division, SOC Research Institute, Korea Institute of Construction Technology)
Choi, Won-Sik (ICT Convergence and Integration Research Division, SOC Research Institute, Korea Institute of Construction Technology)
Won, Ji-Sun (ICT Convergence and Integration Research Division, SOC Research Institute, Korea Institute of Construction Technology)
Kim, Nam-Gon (ICT Convergence and Integration Research Division, SOC Research Institute, Korea Institute of Construction Technology)
Publication Information
Journal of the Korea Academia-Industrial cooperation Society / v.14, no.11, 2013 , pp. 5890-5896 More about this Journal
Abstract
This Study aimed at suggesting the plan for accumulating and utilizing schedule information of IFC file in BIM-based delivery system. For this Propose, First, literature review is conducted for analyzing utilization plan of schedule information and the IFC standard. Second, Schedule Planning process is analyzed to draw Schedule elements, and schedule information items is derived by analyzing schedule process and commercial software. Also, schedule elements in the IFC schema is derived by analyzing IFC schema through drawn schedule information. Finally, this study suggests a concept model accumulating and utilizing Schedule information included in IFC schema, and a conceptual delivery process of BIM model by analyzing BIM Application Guideline for Facility Project by PPS (Public Procurement Service) for accumulating IFC delivery files This study will expects to contribute to accumulate information of BIM model at the point of nationally introducing BIM.
Keywords
Schedule Information; IFC Schema; BIM; Information Accumulation;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 S. J. Ahn, H. S. Lee, M. S. Park and W. Y. Kim, "Object-Oriented Modeling of Construction Operations for Schedule-Cost Integration, Based on BIM", Journal of the Architectural Institute of Korea Structure & Construction, V.25, N.12, pp. 165-174, 2009.   과학기술학회마을
2 S. H. Lee, "History of BIM and the Future", LAND & HOUSING INSTITUTE, LHI Archives, v4, pp. 29-39, 2011.
3 B. S. Koo and M. Fischer, "Feasibility Study of 4D CAD in Commercial Construction", Journal of Construction Engineering and Management, pp. 251-260, 2000. DOI: http://dx.doi.org/10.1061/(ASCE)0733-9364(2000)126:4(251)   DOI   ScienceOn
4 Y. H. Lee, "Development of an initial schedule generation model(isGem) using standardized template and historical data for plant construction project", PhD thesis, Inha University. 2008.
5 J. H. Ahn and M. H. Jang, " A Method of Integration of Schedule and Cost Using Quantity Take-offs", Journal of the Architectural Institute of Korea Structure & Construction, V.25, N.2, pp. 133-140. 2009.   과학기술학회마을
6 H. D. Lee, S. H. Lee, Y. C. Seo and S. B. Lee, "Development of CBR-based DEPOT(Duration Estimator for Project) System for Construction Project", Journal of the Regional Association of Architectural Institute of Korea. V.12, N.2, pp. 201-208. 2010.
7 H. Kim, "Development of 3D BIM Based Object Breakdown Structure for Integrated Cost/Time Information", MS Thesis, Kyung Hee University, 2012.
8 J. S. Won and K. B. Ju, "Analysis of IFC Schema for BIM-based Scheduling Management, Conference of the Society of CAD/CAM Engineers. pp.708-709, 2012.
9 HanmiParsons, "Construction Management A to Z" Bomoondang, 2006.
10 Public Procurement Service, "BIM Application Guideline for Facility Project" 2010.