A Preliminary Research for Developing System Prototype Generating Linear Schedule  

Ryu, Han-Guk (Department of Architectural Engineering, Changwon National University)
Publication Information
Journal of the Korea Institute of Building Construction / v.11, no.1, 2011 , pp. 1-8 More about this Journal
Abstract
Linear scheduling method limits to present works of work breakdown structure as a form of lines and was often developed manually. In other words, linear schedule could not utilize activity, work breakdown structure, and etc. information of network schedule such as CPM(Critical Path Method) and has been used only for reporting or confirming construction master plan. Therefore, it is necessary to develop system which can automatically generating the linear schedule based on the network schedule having many accumulated and useful construction schedule information. Thus, this research has an effort to establish data process model, data flow diagram, and data model in order to make linear schedule. In addition, this research addresses the system solution structure, user interface class diagram and logic diagram, and data type schema. The results of this paper can be used as a preliminary research for developing linear schedule generating system prototype by utilizing the network schedule information.
Keywords
Linear Schedule; Data Process Model; Data Flow Diagram; Data Model; System Solution Structure; Class Diagram;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Moselhi O, Nicholas MJ. Hybrid expert system for construction planning and scheduling, Journal of Construction Engineering and Management 1990;116(2):221-238.   DOI
2 Shaked O, Warszawski A. CONSCHED: Expert System for scheduling of modular construction projects, Journal of Construction Engineering and Management 1992;118(3):488-506.   DOI
3 Mulholland B. Christian J. Risk assessment in construction schedules, Journal of Construction Engineering and Management 1999;125(1):8-15.   DOI   ScienceOn
4 Wang W, Demsetz LA. Model for evaluating networks under correlated uncertainty-NETCOR, Journal of Construction Engineering and Management 2000;126(6):458-466.
5 El-Rayes K. Object-oriented model for repetitive construction scheduling, Journal of Construction Engineering and Management 2001;127(3):199-205.   DOI   ScienceOn