• 제목/요약/키워드: Catenary-Current Collection

검색결과 89건 처리시간 0.027초

350km/h 전차선로 집전성능 시험 및 결과 분석 (Analysis of Current Collection Performance Testing and Result of 350[km/h] Catenary System)

  • 허용석;이인희
    • 전기학회논문지
    • /
    • 제65권2호
    • /
    • pp.365-369
    • /
    • 2016
  • The 350[km/h] catenary system was successfully opened in Honam high speed line. This 350[km/h] catenary system is firstly constructed in South Korea. Therefore the current collection performance of this system should be tested and evaluated by the authority. This paper describes the testings by running of HEMU-430X train and the evaluation criteria and result analysis to determine whether the performance of the catenary is good or not as a verification of catenary-pantograph interface. In detail, the contact force by pantograph, arcs by loss of contact and uplift amount of the catenary support were measured and discussed as a category of the current collection performance.

빔 모델을 이용한 전차선 불균일율에 관한 연구 (A Study on the Elasticity Disuniformity for Catenary using by Beam Model)

  • 권삼영;이기원;조용현;정흥채
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 추계학술대회 논문집
    • /
    • pp.209-217
    • /
    • 1999
  • A catenary system should be designed to be an uniform elasticity over a span in order to maintain the lowest possible loss of contact between a pantograph and a contact wire. A elasticity disuniformity of a catenary can be regarded as a important design factor used for predicting the current collection performance for a catenary. There are a couple of formulas to calculate elasticity disuniformity of a catenary according to the literature survey, The effectiveness of these formulas is reviewed by performing catenary elasticity and loss of contact analysis for 5 different configurations of catenary systems using a beam element based FEM program, KRRI developed program, and the loss of contact by GASENDO, RTRI developed program, respective]y. The results reveals that these formulas are not suitable to predict the current collection performance for a catenary. Therefore, a new formula based on the standard deviation of the elasticity over a span is proposed in this study. The analysis results show that the new formula for an elasticity disuniformity of a catenary is very effective in predicting the current collection performance for a catenary.

  • PDF

시뮬레이션에 의한 고속전철용 집전시스템 매개변수 연구 (Simulation-based Parametric Study of the Current Collection System of High Speed Trains)

  • 한형석
    • 한국철도학회논문집
    • /
    • 제6권4호
    • /
    • pp.279-285
    • /
    • 2003
  • In an electric traction system in which power is supplied from a catenary via a pantograph, the mechanical design of the catenary and pantograph is clearly of importance in relation to the problem of current collection at high speed. A computer-simulation technique is used to study the effects of changing parameters of pantograph and catenary on the quality of current collection at high speed. The current collection system is evaluated on the basis of the contact-force variations and displacement responses of the pantograph and contact wire. This study shows that current-collection quality is determined primarily by the overhead line parameters rather than by the pantograph. The results can be applied to optimize the design of current-collection systems.

전차선로 동적특성에 따른 설치상태 분석 (Analysis on Installation Condition According to Dynamic Characteristics for Overhead Catenary System)

  • 박영;이기원
    • 전기학회논문지
    • /
    • 제65권9호
    • /
    • pp.1605-1609
    • /
    • 2016
  • The measurement of current collection performance between pantograph and contact wire of overhead catenary system is intended to prove the safety of operation and the quality of the current collection system. The results of interaction performance of current collection system are required for approving with commercial operation on railway lines. The methods of interaction performance of current collection system are defined on interactional standards such as IEC 62486 and EN 50317. In this paper, the interaction performance is evaluated by the percentage of arcing on Honam high-speed line and the results are used for adjustment of the overhead catenary line structure. The experimental results in Honam high-speed line confirm that the duration of an arc lasting longer 25 ms between pantograph and contact wire was depended on the conditions of overhead contact line after installation.

전차선 드로퍼 간격에 따른 집전성능 분석 (Study of Current Collection Performance according to Dropper Spacing for Catenary)

  • 권삼영;이기원;창상훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 추계학술대회 논문집
    • /
    • pp.310-317
    • /
    • 1999
  • This paper presents study of collection performance according to dropper spacing for catenary Static characteristics analysis, dynamic simulation, stress and wear analysis for different 5 catenary configurations according to dropper spacing are performed. And collection performance for TGV-Nord catenary system is also analyzed in order to compare and evaluate.

  • PDF

고속전차선로의 시공 허용오차가 집전성능에 미치는 영향에 관한 연구 (A Study on the Effects of Construction Tolerances on the Current Collection Performance for High Speed Catenary System)

  • 김태훈;서기범;박재영
    • 전기학회논문지
    • /
    • 제64권12호
    • /
    • pp.1782-1788
    • /
    • 2015
  • In this paper, analysis of the effects for construction tolerances on the current collection performance of high speed catenary system. The height of the contact wire is the geometrical position of the cantilever directly affects the current collection performance. Contact force when the height of the contact wire exceeds the construction tolerance were analyzed. As a result, the maximum contact force was analyzed to more than 350[N] that are recommended by EN50119. And when the geometrical position of the cantilever to exceeds the construction tolerance, the analysis results of uplift at the mast support points, it becomes 127[mm] that are recommended by UIC 799. If the construction tolerances exceeds the reference value, the current collection performance is deteriorated. Therefore, catenary system require high precision construction. In the future, there is a need for continuing research on the tolerance of catenary system in the actual operating state.

Measurement and Analysis of Current Collection Signals in Korean High-speed Railway

  • Kim, Jung-Soo
    • International Journal of Safety
    • /
    • 제5권2호
    • /
    • pp.1-5
    • /
    • 2006
  • A data acquisition and processing system for measuring the current collection signals of the Korean High-speed Railway is developed. The current collection system is composed of a pantograph and the overhead catenary that supplies electrical power to the train through the pantograph. The system simultaneously measures the signals generated at the interface between the catenary and the pantograph through the accelerometers, load cells and strain gauges placed at various locations. The on-track test data are processed to evaluate the current collection reliability. The fiequency analysis of the signals reveals the presence of several structural vibration modes in the pantograph, as well as the components arising from the periodicity in the structure of the catenary and pantograph at the interface. The feasibility of predicting the contact performance from the measured signals is also demonstrated.

주행 집전계 시험기의 주행 대차용 선형 유도전동기 설계에 관한 연구 (A Study on Design of Linear Induction Motor in Dynamic Tester for Catenary-current Collection)

  • 함상환;조수연;이주
    • 전기학회논문지
    • /
    • 제60권4호
    • /
    • pp.771-775
    • /
    • 2011
  • This paper presents design process of linear induction motor in dynamic tester for catenary-current collection. To minimize length of rail for dynamic tester for catenary-current collection, accelerating performance of the linear induction motor is very important. So the design process of linear induction motor considered in this paper is different with general design process of linear induction motor, because dynamic tester has three type driving region, as accelerating region, constant speed region, and braking region. Considering accelerating performance of motor, distance and time from starting point to constant speed region were concerned for load condition of motor. Designed linear induction motor was analyzed by 2-dimensional finite element method. Using mechanical dynamics simulation with analysis result of 2-dimensional finite element method and accelerating performance of designed motor was proved.

전차선로 속도향상에 따른 오버랩 구간(Overlap section) 경간 구성 기법 (Research on Configuration Optimization of Overlap Section in Overhead Catenary System for High-speed Railway)

  • 최태수;최규형
    • 전기학회논문지
    • /
    • 제66권6호
    • /
    • pp.975-980
    • /
    • 2017
  • Overhead catenary system of electric railway has overlap sections which devide and tighten trolley wire supplying electric power to train, where current collection performances may become worse according to railway speed-up. Current collection tests conducted at 400 km/h test-bed section of Honam high-speed railway show that balanced line arrangement at overlap section is needed to secure current collection without arc generation between trolley wire and train current collection device. This paper proposes a design procedure of the overlap section to allow for tension increase and uplift of the trolley wires according to railway speed-up. By applying the proposed procedure to the overhead catenary system of Honam high-speed railway, it is suggested that the minimum span length should be 33.2 m for railway speed-up to 350 km/h and 43.7 m for speed-up to 400 km/h.

도시철도 simple catenary 가선구조에서의 집전성능 향상방안에 관한 연구 (Study on the Current Collection Characteristics and Improvement Methods of Simple Catenary Systems)

  • 박용철;창상훈;송중호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1360-1365
    • /
    • 2004
  • The decisive criteria to determine collection performance is the contact force between pantograph and catenary. The contact force consists of a static force and dynamic force related to vibration characteristics, train speed and etc. The low contact force leads to the loss of contact, and most countries regulate it below $3\∼5\%$ at operation speed. This study presents a technical overview of criteria for collection performance and modelling and simulation methods to analyze dynamic characteristics of catenary.

  • PDF