• Title/Summary/Keyword: Calculation criteria

Search Result 421, Processing Time 0.025 seconds

Equivalent Friction Angle and Cohesion of the Generalized Hoek-Brown Failure Criterion in terms of Stress Invariants (응력불변량으로 표현한 일반화된 Hoek-Brown 파괴조건식의 등가 마찰각 및 점착력)

  • Lee, Youn-Kyou;Choi, Byung-Hee
    • Tunnel and Underground Space
    • /
    • v.22 no.6
    • /
    • pp.462-470
    • /
    • 2012
  • Implementing the generalized Hoek-Brown failure criterion in the framework of the Mohr-Coulomb criterion requires the calculation of the equivalent friction angle and cohesion. In the conventional method based on the Balmer (1952)'s theory, the tangential instantaneous friction angle and cohesion are expressed in terms of the minimum principal stress ${\sigma}_3$, which does not provide the information about the dependency of the equivalent parameters on the hydrostatic pressure and the stress path. In this study, this defect of the conventional method has been overcome by representing the equivalent parameters in terms of stress invariants. Through the example implementation of the new method, the influence of the magnitude of the hydrostatic pressure and the Lode angle on the tangential instantaneous friction angle and cohesion is investigated. It turns out that the tangential instantaneous friction angle is maximum when the stress condition is triaxial extension, while the tangential cohesion is maximum when the stress condition is triaxial compression. The dependency of the equivalent Mohr-Coulomb strength parameters on the hydrostatic pressure and the Lode angle tends to be more substantial for the favorable rockmass of larger GSI value.

A Study on CDM Possibility Assessment of Transport Sector (교통부문 청정개발체제(CDM) 사업화 가능성 평가)

  • Park, Jin Young;Kim, DongJun;Oh, Seung Hwoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.175-184
    • /
    • 2011
  • Transport sector takes charge of about 20 percent of energy consumption and GHG(Green House Gas) emission in Korea. One of the efficient strategy of reducing GHG is introducing CDM(Clean Development Mechanism), which is one of GHG reduction systems in Kyoto Protocol. Nowadays many tries have done to regist transport policies as CDM in transport sector, however, a lot of things should be investigated to regist CDM in advance. The aim of this paper is assessment of CDM possibility in transport sector. First of all, we review steps and criteria to CDM registration, and select 4 CDM possibility assessment index in transport sector: as follows additionality, methodology, emission calculation, and monitoring. Also, we analyze registed projects and methodologies in transport sector. To assess CDM possibility in transport sector, quantitative and qualitative assessments are carried out in this study. 18 transport policies are categorized as 4 groups and possibility of 18 transport policies are examined. Several policies can reduce GHG, however, they are not fit to regist as a CDM. On the contrary many transport policies have possibility to regist. In addition, we have done questionnaire survey, 'fuel change' policies have high possibility to CDM. However transport policies related to haman activity, like as TOD, have lower possibility. As a result, we can find that enough CDM possibility assessment should be carried out before CDM registration in transport sector.

Development and Evaluation of Quality Assurance Worksheet for the Radiation Treatment Planning System (방사선치료계획 시스템의 정도관리 절차서 개발 및 유용성 평가)

  • Cho Kwang Hwan;Choi Jinho;Shin Dong Oh;Kwon Soo Il;Choi Doo Ho;Kim Yong Ho;Lee Sang Hoon
    • Progress in Medical Physics
    • /
    • v.15 no.4
    • /
    • pp.186-191
    • /
    • 2004
  • The periodic Quality Assurance (QA) of each radiation treatment related equipments is important one, but quality assurance of the radiation treatment planning system (RTPS) is still not sufficient rather than other related equipments in clinics. Therefore, this study will present and test the periodic QA program to compare, evaluation the efficiency of the treatment planning systems. This QA program is divided to terms for the input, output devices and dosimetric data and categorized to the weekly, monthly, yearly and non-periodically with respect to the job time, frequency of error, priority of importance. CT images of the water equivalent solid phantom with a heterogeneity condition are input into the RTPS to proceed the test. The actual measurement data are obtained by using the ion chamber for the 6 MV, 10 MV photon beam, then compared a calculation data with a measurement data to evaluate the accuracy of the RTPS. Most of results for the accuracy of geometry and beam data are agreed within the error criteria which is recommended from the various advanced country and related societies. This result can be applied to the periodic QA program to improve the treatment outcome as a proper model in Korea and used to evaluate the accuracy of the RTPS.

  • PDF

Integrated Approach for Watershed Management in an Urban Area (도시 유역 관리를 위한 통합적인 접근방법)

  • Lee, Kil-Seong;Chung, Eun-Sung;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.2 s.163
    • /
    • pp.161-178
    • /
    • 2006
  • Heathcote (1998) identified a systematic, seven-step approach to general watershed planning and management. It consists of 1) understanding watershed components and processes, 2) identifying and ranking problems to be solved, 3) setting clear and specific goals, 4) developing a list of management options, 5) eliminating infeasible options 6) testing the effectiveness of remaining feasible options, and 7) developing the final options. In this study the first five steps of that process were applied to the Anyangcheon watershed in Korea, which experiences streamflow depletion, frequent flood damages, and poor water quality typical of highly urbanized watersheds. This study employed four indices: Potential Flood Damage(PFD), Potential Streamflow Depletion(PSD), Potential Water Quality Deterioration(PWQD) and Watershed Evaluation Index(WEI) to identify and quantify problems within the watershed. WEI is the integration index of the others. Composite programming which is a method of multi-criteria decision making is applied for the calculation of PSD, PWQD and WEI (Step 2). The primary goal of the study is to secure instreamflow in the Anyangcheon during dry seasons. The second management goals of flood damage mitigation and water quality enhancement are also set (Step 3). Management options include not only structural measures that can alter the existing conditions, but also nonstructural measures that rely on changes in human behavior or management practices (Step 4). Certain management options which are not technically, economically, and environmentally feasible, are eliminated (Step S). Therefore, this study addresses a Pre-feasibility study, which established a master plan using Steps 1 through 5.

A Break-Even Analysis that Helps with Decision Making involving the Introduction of Ultrasonography (초음파기기 도입 시 의사결정 지원을 위한 손익 분석)

  • Yeo, Seong-Hee;Lee, Hae-Jong;Seo, Young-Joon;Kim, Young-Hoon
    • Korea Journal of Hospital Management
    • /
    • v.14 no.3
    • /
    • pp.23-48
    • /
    • 2009
  • The purpose of this study was to provide criteria which help executives to make decisions through the analysis of profitability of ultrasonography conducted in each medical department. In order to achieve such purpose, the study conducted break-even analyses on three medical departments of a university hospital in which has used ultrasonography was largely conducted in diagnosing diseases and performing surgeries. The research was carried out from January to June 2008. The data necessary for calculating cost, were collected using by computerized data. The results of the study were summarized as follows. 1. The Cost structure of each medical department: The Cost of ultrasonography was divided into direct cost and indirect cost through the categorization by cost object. Labor cost accounted for the largest portion of the direct cost with 69.3% in the department of obstetrics and gynecology, 67.4% in the department of radiology and 58.2% in the cardiac ultrasonography center, which followed by the depreciation cost of ultrasonography equipment. The calculation of the average material cost of each ultrasonographic test by medical test found that the cardiac ultrasonography center took first place with 2,355 won, followed by the department of obstetrics and gynecology with 266 won and the department of radiology with 233 won. As for the power cost of ultrasonography equipment, the department of radiology took fist place with 442,000 won. The power cost, however, did not affect much the cost price, because it accounted for only a small portion of the cost. As for indirect cost, the cardiac ultrasonography center ranked first with 7,156,000 won. Building depreciation cost accounted for the largest portion of the indirect cost. 2. Break-even analysis: Under the supposition that cost price can be divided into fixed cost and variable cost, a break-even analysis was conducted using the cost price confirmed through the cost structure of each medical department. As for the average customary charge of ultrasonography test conducted in each medical department, the department of obstetrics and gynecology charged 24,627 won, the department of radiology 53,179 won and the cardiac ultrasonography center 65,174 won. According to these results, the charges of ultrasonography test imposed by the department of radiology and the cardiac ultrasonography center wre enough to surpass break-even levels, but the charge imposed by the department of obstetrics and gynecology was not enough to offset the cost price. In conclusion, labor cost accounted for the largest proportion of cost price of ultrasonography test conducted in diagnosing diseases and performing surgeries in medical departments, followed by the fixed cost of ultrasonographic equipment depreciation cost. In medical department where the current charge of ultrasonography test turned out not to offset cost price through the break-even analysis of ultrasonographic equipment, ways to reduce fixed cost which accounts for the largest proportion of the cost price should be sought. Even medical departments whose current charge of ultrasonography test is enough to surpass break-even level are required to work for efficient management and cost reduction to continuously generate profits.

  • PDF

Study on Improvement of Cost Calculation Method in Construction less than One Day Workload (1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구)

  • Shin, Dae-Woong;Lee, Young-Do;Shin, Yoonseok;Kim, Gwang-Hee;Yoo, Sangrok;Park, Wonjun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.477-485
    • /
    • 2014
  • Standard production unit system and historical cost data are the most typical data base for calculating budget price in construction. However, these construction cost estimation methods are difficult to calculate proper construction cost because definition, additional allowance or modification criteria is not clear in construction within one day. Therefore, this study identifies problems for standard production unit system and historical cost data and suggests the improvements for them. For the objectives, this study analyzes frequency after implementing survey for 44 specialty contractors in placing at kyeonggi-province. As the results of the study, labor costs in standard production unit system and equipment costs in historical cost data and in construction of pavement and maintenance by project type was exceeded at most high rate against construction cost estimation methods. Based on this result, standard production unit system and historical cost data need to be modified by three improvements such as classification by project scale. These will be baseline data for improvement of construction cost estimation methods for less than one day workload.

Selection of Early and Late Flowering Robinia pseudoacacia from Domesticated and Introduced Cultivars in Korea and Prediction of Flowering Period by Accumulated Temperature

  • Lee, Kyung Joon;Sohn, Jae Hyung;Redei, K.;Yun, Hye Young
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.2
    • /
    • pp.170-177
    • /
    • 2007
  • The objectives of this study were to select early, late, and abundant flowering trees of black locust from domesticated and introduced cultivars, and prediction of flowering period by calculation of accumulated temperature in spring. Four cultivars (Debreceni-2, Pusztavacs, Jaszkiseri, and Rozsaszin AC) from Hungary and a cultivar from Beijing, China, were introduced, propagated by seed and planted in a seed orchard. For domesticated black locust, 63 cultivars from 10 locations throughout the country were selected and propagated by root cutting. Criteria for selection of domesticated cultivars were abundant flowering, long flowering period, or abundant nectar production with, if possible, straight stems. Accumulated temperature was calculated from data of a nearby weather station by accumulating daily maximum temperature minus 5 degree Celsius from January 1 up to the date reaching 880 degrees. Daily mean temperature was also used to calculate accumulated temperature up to the date reaching 450 degrees. The percentages of two-year and three-year-old flowering trees propagated by root cutting were higher than that of trees propagated by seeds, while four-year-old trees all flowered regardless of propagation methods. Among the domesticated cultivars, all the cultivars from Ganghwa showed abundant flowering with highest nectar production of 6.5 ul per flower, which was 100% more than other domesticated cultivars and 50% more than Debreceni-2 cultivar with highest nectar production among the introduced cultivars from Hungary. At the end of the eight years of observations, two trees of Debreceni-2 cultivars and a tree from Beijing, China were selected for early flowering trees which flowered 2 to 3 days earlier than average trees, while a tree of Debeceni-2 and three trees from Bejing were selected for late flowering trees which flowered 2 to 3 days later than average trees. It is possible to extend the flowering period of black locust by 4 to 6 days by planting early and late flowering cultivars together. Abundant flowering trees were unable to be selected due to severe damages by leaf gall midges which killed many trees and reduced the crown size of the remaining trees in the seed orchard, and which were first found in Korea in 2001 and now damaging most of the black locust forests in Korea. The prediction of flowering period by accumulated temperature indicated that black locust flowered to a peak when accumulated daily maximum temperature reached 880 degrees Celsius, and when daily mean temperature reached 450 degrees.

Shoulder Surfing Attack Modeling and Security Analysis on Commercial Keypad Schemes (어깨너머공격 모델링 및 보안 키패드 취약점 분석)

  • Kim, Sung-Hwan;Park, Min-Su;Kim, Seung-Joo
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.24 no.6
    • /
    • pp.1159-1174
    • /
    • 2014
  • As the use of smartphones and tablet PCs has exploded in recent years, there are many occasions where such devices are used for treating sensitive data such as financial transactions. Naturally, many types of attacks have evolved that target these devices. An attacker can capture a password by direct observation without using any skills in cracking. This is referred to as shoulder surfing and is one of the most effective methods. There has been only a crude definition of shoulder surfing. For example, the Common Evaluation Methodology(CEM) attack potential of Common Criteria (CC), an international standard, does not quantitatively express the strength of an authentication method against shoulder surfing. In this paper, we introduce a shoulder surfing risk calculation method supplements CC. Risk is calculated first by checking vulnerability conditions one by one and the method of the CC attack potential is applied for quantitative expression. We present a case study for security-enhanced QWERTY keyboard and numeric keypad input methods, and the commercially used mobile banking applications are analyzed for shoulder surfing risks.

Analysis of Berth Operation Ratio in terms of Wave Response at Busan New Port Site (부산신항역 파랑반응에 따른 부두 가동율 해석)

  • Jeong, Jae-Hyun;Lee, Hak-Seung;Lee, Joong-Woo;Yang, Sang-Yong;Jeong, Young-Hwan
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.57-62
    • /
    • 2006
  • Busan New Port, under construction aiming for the hub of Northeast Asia and Partly in operation, had damaged up to 48 billion Won due to Typhoon 'maemi' in 2003. The present criteria of domestic harbor design only describes about the critical wave height with respect to the size of vessel for harbor tranquility. The berth operation ratio which represents the annual available berthing days is depending on the efficiency of cargo handling work and this depends on the motion of the moored vessel due to the wave action and the characteristics of cargo gears. The motion of moored vessel might be related not only to the wave height but also to wave period. Furthermore, the berth operation ratio relies on external forces such as currents and winds, including the characteristics of mooring system and the specification of the moored vessel. In this study we only deal with berth operation ratio in normal sea state, considering wave and current by measured data and numerical calculation. Especially we tried to evaluate the berth operation ratio for each berth adopting the variation of dredging and reclamation plan and the change of wave environment during the process of the new port construction. For better understanding and analysis of wave transformation process, we applied the steady state spectral wave model and extended mild-slope wave model to the related site. This study summarizes comparisons of harbor responses predicted by two numerical predictions obtained at Busan New port site. Field and numerical model analysis was conducted for the original port plan and the final corrected plan.

  • PDF

Evaluation of Separation Distance from the Temporary Storage Facility for Decontamination Waste to Ensure Public Radiological Safety after Fukushima Nuclear Power Plant Accident (후쿠시마 원전 사고 이후 일반인의 방사선학적 안전성 확보를 위한 제염폐기물 임시저장시설 이격거리 평가)

  • Kim, Min Jun;Go, A Ra;Kim, Kwang Pyo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.14 no.3
    • /
    • pp.201-209
    • /
    • 2016
  • The object of this study was to evaluate the separation distance from a temporary storage facility satisfying the dose criteria. The calculation of ambient dose rates took into account cover soil thickness, facility size, and facility type by using MCNPX code. Shielding effects of cover soil were 68.9%, 96.9% and 99.7% at 10 cm, 30 cm and 50 cm respectively. The on-ground type of storage facility had the highest ambient dose rate, followed by the semi-ground type and the underground type. The ambient dose rate did not vary with facility size (except $5{\times}5{\times}2m\;size$) due to the self-shielding of decontamination waste in temporary storage. The separation distances without cover soil for a $50{\times}50{\times}2m\;size$ facility were evaluated as 14 m (minimum radioactivity concentration), 33 m (most probably radioactivity concentration), and 57 m (maximum radioactivity concentration) for on-ground storage type, 9 m, 24 m, and 45 m for semi-underground storage type, and 6 m, 16 m, and 31 m for underground storage type.