• Title/Summary/Keyword: Bim

Search Result 1,467, Processing Time 0.021 seconds

A Study on Efficient Workflow Improvement for Underground Facilities BIM Design Education (지하시설물 BIM 설계 교육을 위한 효율적인 업무프로세스 개선 방안에 관한 연구)

  • Jongseo Lee;Il-young Moon
    • Journal of Practical Engineering Education
    • /
    • v.15 no.3
    • /
    • pp.635-640
    • /
    • 2023
  • Creating New Value Through Digital Transformation Across Industries Worldwide: A Focus on Transitioning from CAD to BIM Design in the Construction Sector with the Implementation of Mandatory BIM Design by 2025 by the Ministry of Land, Infrastructure, and Transport in South Korea. Challenges and Proposed Methodology for Enhancing Efficiency in BIM Design in the Civil Engineering Field of Underground Infrastructure, and Nurturing BIM Design Experts.

Georeferencing for BIM and GIS Integration Using Building Boundary Polygon (BIM과 GIS 통합을 위한 건물 외곽 폴리곤 기반 Georeferencing)

  • Jwa, Yoon-Seok;Lee, Hyun-Ah;Kim, Min-Su;Choi, Jung-Sik
    • Journal of KIBIM
    • /
    • v.13 no.3
    • /
    • pp.30-38
    • /
    • 2023
  • Building Information Models(BIM) provides rich geometric and attribute information throughout the entire life cycle of a building and infrastructure object, while Geographic Information System(GIS) enables the detail analysis of urban issues based on the geo-spatial information in support of decision-making. The Integration of BIM and GIS data makes it possible to create a digital twin of the land in order to effectively manage smart cities. In the perspective of integrating BIM data into GIS systems, this study performs literature reviews on georeferencing techniques and identifies limitations in carrying out the georeferencing process using attribute information associated with absolute coordinates probided by Industry Foundation Classes(IFC) as a BIM standard. To address these limitations, an automated georeferencing process is proposed as a pilot study to position a IFC model with the Local Coordinate System(LCS) in GIS environments with the Reference Coordinate System(RCS). An evaluation of the proposed approach over a BIM model demonstrates that the proposed method is expected to be a great help for automatically georeferencing complex BIM models in a GIS environment, and thus provides benefits for efficient and reliable BIM and GIS integration in practice.

A Framework Integrating Cost and Schedule based on BIM using IFC (IFC활용 BIM기반 공정/원가 통합관리 프레임워크)

  • Lee, Jin-Gang;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.53-64
    • /
    • 2013
  • In building construction project, there are numerous information or data parts across many different software applications and professional specialists. BIM (Building Information Modeling), as a medium for managing information generated during construction project, it is intended to enhance the effectiveness of construction management and reap a lot of advantages such as, automatic quantity takeoff, error-free estimation, 4D(3D+Time), 5D(4D+Cost) simulation. Nevertheless, the overall and practical effectiveness of BIM utilization is difficult to justify at this stage. While helpful, there are some limitation when BIM applied to construction management due to the differences of data processing process between BIM and work in the field, limitations of information generated from BIM object and interoperability problem among BIM application. Therefore, this paper propose a framework integrating BIM with cost-schedule information using IFC. And we construct the system prototype based on the framework and performed case study to examine the framework. The proposed framework provides the information basis for BIM based cost-schedule integration. ultimately, the framework increase the utilization of BIM and work efficiency of construction industry by supporting an understanding of information.

Analysis of Curriculum Management and Proposal of BIM Educational Strategy in Architecture Design (건축설계 과정에서 융합적 사고능력 향상을 위한 국내 대학의 BIM 교육과정 운영실태 분석과 교육전략 제안)

  • Choi, Yeo-Jin
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.12
    • /
    • pp.263-270
    • /
    • 2019
  • In order to meet the needs of integrated design process in architect industry, BIM(Building Information Modeling) education in university is urgently needed. However, the investigation of the current status of BIM education at 60 universities shows that most universities do not offer BIM education at all, or opened only one regular course for BIM education. The survey on BIM education for students shows that non-curricular activities brought bigger educational achievements than regular courses. Considering these findings and the practical restrictions of the universities, and through evaluation and feedback from professors as educational providers and working architects as professional users, the desirable strategy for BIM education in architect design was able to be suggested, which is consisted of regular curriculum of two courses and 40 hours non-curricular activities.

A Study on the Development of an Indoor Level of Detail(LOD) Model for the Linkage between BIM and GIS: Focusing on the Indoor Facility Management (BIM과 GIS 연계를 위한 실내 세밀도 모형 개발에 관한 연구: 실내 시설물 관리 중심으로)

  • Kang, Hye Young;Hwang, Jung Rae;Hong, Chang Hee
    • Spatial Information Research
    • /
    • v.21 no.5
    • /
    • pp.73-82
    • /
    • 2013
  • In recent years, according to the increase of interests in indoor space, various researches are being carried out for the construction and services of indoor spatial information. BIM data is very useful to build indoor spatial information. Accordingly, many studies for the use of BIM data on GIS part are in progress. In order to take advantage of BIM data on GIS part, the conversion technology for building indoor data and visualization techniques are required. However, most of the previous researches are focused on the conversion technology to construct indoor spatial information by importing BIM data into GIS applications while there is few research on visualization. In this study, an indoor LOD(Level of Detail) model is proposed to apply to on indoor facility management system when indoor data was constructed based on BIM data for the linkage between BIM and GIS.

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

A Study on the Construction Management Method based on BIM for Civil Engineering Project (토목시설물에 대한 BIM기반 공사관리 기법 연구)

  • Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.

An Study on the Element Technologies of BIM and Importance Analysis of Them through Technology Development Status Analysis (BIM 기술개발 현황분석을 통한 기술개발요소 도출 및 중요도 평가에 관한 연구)

  • Kim, Ji-Yun;Lee, Da-Un;Song, A-Reum;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.497-503
    • /
    • 2014
  • In order to facilitate the application of BIM technologies in construction projects, a lot of developed countries such as Singapore and the United States are developing a technology development road-map of BIM. In order to develop it, current status of BIM technology in domestic projects must be analyzed in advance. In this study, the element technologies of BIM was identified and the current status and the importance priorities of them were analyzed and evaluated. The result shows that the level of technology developments is behind that of other advanced countries in most of the elements. In technology importance analysis, the BIM based preliminary planning technology and the standards for BIM service contracts are ranked in the high position and their developments are also delayed in Korea. The results of this analysis could show the direction of BIM technology development and also be used for developing the technology roadmap of BIM.

Guideline of Building Information Modeling(BIM) Service Application Level using Service Level Agreement(SLA) in the Procurement Phase (발주단계에서 SLA를 활용한 BIM 서비스 적용 수준에 관한 연구)

  • Kim, Ji-Yun;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.1
    • /
    • pp.83-90
    • /
    • 2017
  • Recently, BIM has been actively adopted in construction projects and industries, and also integrated with Information and Communications Technology(ICT) such as cloud computing technology, sensor technology, 3D scanning and printing technology etc. However, it is very difficult to efficiently utilize BIM services, technologies and collaborate with each other because of differences of usage and requirements of technologies. Every participant in the same construction project has their own needs, requirements and details of the model in each phase. In order to enhance utilization BIM model, BIM services and technologies required in their project have to be clearly defined in the initial stage of the project. In order to support the owner to define the BIM level, BIM service level and application technologies are identified and guidelines how to define the level and technologies for their project purpose are suggested in this study.

Identification of Major BIM-applicable Tasks with Contribution to Achieving Objectives and Expected Benefit in Construction Stage: Focused on the Case of Public Apartment Housing Projects (목표달성기여도와 예상적용효과에 의한 시공단계 BIM 주요 업무 도출 - 공공부문 공동주택 건설사업 사례를 중심으로 -)

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.41-53
    • /
    • 2019
  • As a central part in smart construction, BIM has been rapidly spread in construction industry at large. However, the level of applying BIM in construction stage is still relatively lower than that in design stage due to unclear application method, inadequate design BIM model, technical faults of BIM itself, etc. Under these circumstances, public owners inevitably need to adjust the scope and pace in BIM application considering their internal support and capabilities of contractors. This study aims to suggest major BIM-applicable tasks during construction stage in the process of establishing gradual long-term and short-term introduction strategy for public apartment housing projects. Those major tasks were identified with the combination of the importance of tasks and the future benefits of BIM using IPA method. To do so, the degrees of contribution to achieving objectives in construction, current task execution, and communication requirement were investigated by internal site managers. On the other hand, the expected benefits and current level of using BIM were assessed by BIM experts. Among operational tasks by phases, design review, construction plan review, making as-built drawing, etc. were categorized as major tasks. In addition, progress control, regular meeting, master schedule development, work inspection, on-site quality check, etc. were also drawn as major tasks by management areas. The results of this study will provide the useful reference for owners concerned about the introduction of new technologies.