• Title/Summary/Keyword: BSC-IT

Search Result 218, Processing Time 0.025 seconds

Construction Project Performance Management Using BSC and Data Warehouse (BSC를 활용한 Data Warehouse 기반의 건설 프로젝트 성과관리)

  • Park, Moon-Seo;Kim, Nam-Ho;Lee, Hyun-Soo;Ahn, Chang-Bum;Lee, Kyu-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.14-25
    • /
    • 2009
  • Many companies have managed their business performance in order to achieve their enterprise purpose. Performance management which applied concept of BSC (Balanced Scorecard) is widely used all over the world. In the construction industry, BSC-based performance management is currently introduced with needs of balanced performance evaluation. However, most companies actually have intermediate level of adapting BSC. It is important to understand its process or and structure. Therefore, this paper is focused on making performance management process and defining each phase of it. In addition, the model and system are established with putting them together. With developing performance process in construction, the construction companies are supposed to detect the deficiencies of the current performance management systems and take some opportunity to be helped for supporting their decision-making. In conclusion, this paper will provide the construction industry with the opportunities to enhance the values of performance management system and construction application.

Development of Performance Evaluation System for Plant Management Appling BSC Concept (BSC를 이용한 설비관리 업무의 성과평가시스템 개발)

  • Kim, Kwang-Man
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.2
    • /
    • pp.231-239
    • /
    • 2012
  • A company's reliance on plants is growing in the area of production and service. Therefore, the importance of the work on plants in order to manage them efficiently is growing. Effective plant management increases the durability and efficiency of the plant. An organized BSC also increases the workers' will to work harder which is to bring the higher quality of plant management. In this way, however, it has studied with variety ways to assess plant management task for performance evaluation, there is a little deficiency that the study of methodical performance evaluation that based on the some strategies. The BSC, the very way, and it has been utilized in balanced and methodical performance evaluation means in widespread fields with strategy as the center to get visions. In this study, I have developed the performance evaluation system for plant management, appling BSC concept.

The Case Study of BSC Implementation of KITECH (한국생산기술연구원의 BSC 도입사례 연구)

  • Chung, Yang-Hon;Jeong, Gyu-Chae;Bang, Sung-Sig
    • Information Systems Review
    • /
    • v.9 no.1
    • /
    • pp.283-309
    • /
    • 2007
  • This case study reviews procedures of the implementation of a strategic performance management system for the KITECH(Korea Institute of Industrial Technology). The purpose of the study is to provide government funding research institutions with cautious considerations when the institutions want to setup performance systems.. KITHCH's strategic performance management system is based on BSC and has following characteristics: 1. KITHCH has spent more than a year in order to obtain the personnel's agreements on mission, strategies and goals. 2. They have focused a mission and strategy focused performance system so that KPIs are as much aligned as possible with strategies. 3. They have developed the system using both top-down and bottom-up frames. The weights for KPIs were formulated with the bottom-up procedure. This study results possible effective factors for successful implementation of a strategic performance management system for research institutions.

Development of High Strength Blast Furnace Slag Cement at Early Ages. (초기 고강도 고로슬래그 시멘트의 개발)

  • 황인태;김태식;박응모;소승영;소양섭
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.823-828
    • /
    • 1999
  • Blast furnace slag cement(BSC) has many merits in relation to its prodution cost or environmental problem of these days, but it has still some limitation in broad use mainly because it has the lower early hydration strength than the normal portland cement(PC) has. In the present study, several different experimental concepts to improve its low strength in the early hydration stage were tried out which addition of the effective alkali activators such as Ca(OH)2 and limestone powder, fly ash in existing BSC. It was found that the addition of suitable quantity the effective alkali activators such as Ca(OH)2 and limestone powder, fly ash in BSC can be a possible way to get enough early strength compared with the PC and existing BSC.

  • PDF

A Study on the Development and Application of the Integrated Quality Models of BSC, EVA, ABC (BSC, EVA, ABC의 통합 품질모델 개발과 적응에 관한 연구)

  • Lee Jae-Sil;Suh Yung-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.3
    • /
    • pp.81-93
    • /
    • 2004
  • There is no doubt that BSC(Balanced Scorecard), ABC(Activity-Based Costing System), EVA(Economic Value Added System) draw sensation in the world as the tools of Performance Evaluation System and Quality Control. They are useful tools that can help succeed in the dynamic and competitive business environment. These three tools are discussed respectably. However, it also brings doubt whether it is possible to integrate the three tools made in the similar time and which way is appropriate among the three tools according to the type and the circumstance of business. In fact, these tools are not the opposing relations but the complementary relations. Consequently, this paper explains the relations of the three methods and suggests the process of the integrated models. Besides, it provides an idea about when Performance Evaluation System and Quality Control are needed for companies under different aspects considering the circumstance used the respective methods individually.

Linking Measuring Factors for Service Quality to Balanced Scorecard (서비스 품질평가 요인과 Balanced Scorecard의 연계에 관한 연구)

  • Cha, Jung-Hyun;Kim, Soo-Wook
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.667-672
    • /
    • 2007
  • 본 연구는 말콤 볼드리지 요소와 BSC의 각 관점의 KPI 지수간의 연계들 통하여 기업 경영품질향상을 위한 평가모형 구축과 전략 설정을 그 목표로 하고 있다. 기업경영과 관련된 제 영역에 대한 고찰이 가능한 말콤 볼드리지 평가 항목을 살펴보고, 기업경영 성과 측정을 위한 구체적 평가항목을 제시함으로써 부서간 연계 및 인과관계 설정, 전략과의 연계가 가능하여 경영자의 전략 설정과 리더십에 도움을 줄 수 있는 BSC 항목을 살펴 본 후, 기업 경영혁신과 프로세스 개선을 위한 두 평가 항목의 연계를 통하여 평가항목 관리요소의 중복을 제거하고 동일화를 달성, '기업성과 향상' 이라는 공동 목표달성을 위해 MB 및 BSC 두 개선 노선이 시너지를 달성할 수 있는 체계를 마련하고자 한다. 이는 MB와 BSC의 연계방안을 살펴봄으로써 기업의 '경영품질'을 향상시키고, 향상된 경영품질을 구체적 항목에 의거하여 체계적으로 평가할 수 있는 방안을 찾음과 동시에 기업 전략 설정에 이바지할 수 있는 모형구축을 그 목표로 하고 있다.

  • PDF

Performance Measurement in College Information System through BSC (균형성과표(BSC)를 이용한 대학 정보화의 성과 평가)

  • Kim, Sang-Won;Kwon, Ho-Yeol
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.552-561
    • /
    • 2005
  • 균형성과표는 기존의 재무적인 성과를 포함하는 다양한 영역의 측정이 가능할 뿐 만 아니라 각 지표 사이의 인과관계를 관리할 수 있으므로 정보화 성과의 원인을 파악할 수 있고 이에 따르는 개선방안과 목표치를 설정하여 성과 개선 방안을 마련할 수 있다는 장점이 있다. 본 연구에서는 대학의 종합정보 시스템을 도입하면서 얻어진 정보화 성과에 대하여 균형성과표(BSC)에서 제공하는 4 가지 균형 잡힌 관점을 통해 평가하였다. 이를 위하여 먼저 BSC 이론을 바탕으로 최근 대학주변의 경쟁 환경에 대응 할 수 있는 전략적 목표 및 비전의 평가 지표를 선정한 후, 대학의 공공성과 효율성을 조화시켜 정보시스템의 성과 평가에 적용하는 방법을 제안하였으며, 현장에서 구현된 실무사례를 대상으로 제안된 방법을 적용 및 평가하였다.

  • PDF

BSC Perspective of an Exploratory study of Developing CSF/KPI Pool in Korean Construction Industry (균형성과표(BSC)에 의한 건설산업의 주요성공요인과 성과지표개발에 관한 연구)

  • Oh, Ic-Jin;Lee, Jung-Hoon;Lee, Choong-C.
    • Journal of Information Technology Services
    • /
    • v.5 no.1
    • /
    • pp.35-46
    • /
    • 2006
  • In recent years, academic scholars and practitioners have given increasing attention to the importance of strategic performance measurement systems including both financial and non-financial performance metrics. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps an enterprise to translate strategic objectives into relevant performance within an organization. While the current literatures and management articles offer BSC design and implementation. there are few reports of detailed validation of using the rationalized sets of CSF (Critical Success Factors) and KPI (Key Performance Indicators) for the Korean construction industry. This paper first propose the perceived sets of CSF/KPI using current literatures and validate with a major construction company's executives and senior managers in Korea. The paper then examines whether the perceived sets of CSF/KPI have co-relationships with the firm performances. The results of the research contribute in heightening of competitiveness of the Korean construction companies in strategic and performance management.

Deductions of KPIs for BSC and Process KPIs for BPM in Railway Construction (철도건설에서 BSC의 KPI도출과 BPM을 위한 프로세스 KPI도출)

  • Ryu Si-Wook;Ahn Byung-Jun;Ryu Myung-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.388-393
    • /
    • 2006
  • Recently, Korean government demands that public sectors like railway construction should improve their management efficiency. It is necessary for railway construction supported by government budget to aim at the companywide management efficiency. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps a company to translate strategic objective info relevant performance within an organization. This paper focuses on relationship between KPIs (Key Performance Indicators) used to measure the performance of railway construction industry and process KPT for BPM (Business Process Management). Also, the vision and strategies of the railway construction is introduced, and the CSFs (Critical Success Factors) and the KPI based on BSC is developed. Finally, this paper explores that there is a possibility to fulfill the strategic objectives of railway construction industry through the connectivity between KPI based on BSC and process KPI based on BPM. We explain the detailed procedures with an example of railway construction industry.

A Study on the Improvement of BSC as a Performance Management System : Case Study of the Railroad-related Organizations (BSC 성과관리시스템의 개선방안 - 철도조직의 사례연구)

  • Shin, Tack-Hyun;Yoo, Myoung-Kwan;Kim, Byung-Sam
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2387-2392
    • /
    • 2008
  • Nowadays, BSC system has been adopted all over the world as an important tool for organizational performance management. However, despite its merits and contribution for/to the organizational performance management, it is often reported that this system has some problems and limitations in several aspects. The purpose of this article is to depict the usefulness of BSC as well as its limitations, and suggest some direction for enhancing its effectiveness. To attain this purpose, several aspects of current BSC system are analyzed through case study, and through questionnaire when necessary, focusing on the Railroad-related Organizations.

  • PDF