Construction Project Performance Management Using BSC and Data Warehouse |
Park, Moon-Seo
(서울대학교 건축학과)
Kim, Nam-Ho (서울대학교 건축학과) Lee, Hyun-Soo (서울대학교 건축학과) Ahn, Chang-Bum (서울대학교 건축학과) Lee, Kyu-Sung (울산대학교 건축대학) |
1 | Bititci, U. S., Carrie, A. S., and McDevitt, L. (1997) Integrated performance measurement systems: A development guide, International Journal of Operations and Production Management Vol.17, No.5, 522-534 DOI ScienceOn |
2 | H. A. Bassioni, A. D. F. Price, and T. M. Hassan. (2004) Performance measurement in construction, Journal of Management in Engineering, ASCE, Vol.20, No.2, 42-50 DOI ScienceOn |
3 | Kagioglou, M., Cooper, R., and Aouad, G. (2001) Performance management in construction: a conceptual framework, Construction Manage-ment & Economics, Vol. 19, No.1, 85-95 DOI ScienceOn |
4 | W. H. Inmon (1996) Building the data warehouse, John Wiley & Sons |
5 | Yu, J. (2005) Development of Performance Analysis System for Construction Projects Using Data Warehousing Technology, Korea Journal of Construction Engineering and Management, Vol.6, No.1, 89-98 과학기술학회마을 ScienceOn |
6 | Evalgelidisz. K. (1992) Performance measured performance gained, The Treasurer, No.February, 45-47 |
7 | N.G.Olve, J.Roy, and M. Wetter. (1999) Performance drivers, John Wiley & Sons |
8 | A. Neely and C. Adams. (2001) The performance prism perspective, Journal of Cost Management Vol.15, No.1, 7-15 ScienceOn |
9 | Ahn, C. (2007) Project-based knowledge management system using blog, ISARC 2007, Vol.24, 313-318 |
10 | U.S. NIST. (2001) Impacts of Design/Information Technology on Building and Industrial Projects |
11 | Procurement Executives' Association. (1999) Guide to a balanced scorecard performance management |
12 | U.K. DTI: Department of trade and industry. (2005) Construction products industry key performance indicators handbook |
13 | T. Mills. (2007) Wiki-based Construction Knowledge Sharing, The ASC Annual Conference |
14 | D. Amaratunga, D. Baldry. (2002) Moving from performance measurement to performance management, Facilities Vol.20, No.5-6, 217-223 DOI ScienceOn |
15 | Kaplan, R. S., and Norton, D.P. (1992) The balanced scorecard - Measures that drive performance, Harvard Business Review, Vol.70, No.1, 71-79 PUBMED |
16 | M. Lebas. (1995) Performance measurement and performance management, International Journal of Production Economics, Vol.41, 23-25 DOI ScienceOn |
17 | P. Smith, and M. Goddard. (2002) Performance management and operational research: a marriage made in heaven?, Journal of the Operational Research Society, Vol.53, No.3, 247-255 DOI ScienceOn |
18 | Performance-Based Management Special Interest Group(PBM SIG). (2001) The performance-based management handbook |
19 | U.K. DETR: Department of environment, transport and the regions. (2000) KPI report for the minister for construction |
20 | Yu, I. (2004) A Framework of the Comparable Performance Measurement in the Construction Industry, Korea Journal of Construction Engineering and Management, Vol.5, No.5, 172-182 과학기술학회마을 ScienceOn |
21 | Kimball, R. et al. (1996) The data warehouse toolkit, John Wiley & Sons |
22 | Armstrong. M, and Baron. A. (2004) Managing performance: performance management in action, London: Chartered Institute of Personnel and Development |