References
- 건설교통부 건설 산업 선진화 기획단, '건설 산업의 선진화전략', 2004. 12, pp.2-6
- 고성관 외, '건설산업 지식경영의 전략적 성과측정 방법 연구', 한국건설관리학회 논문집, 제2권, 제3호(2001), pp.45-57
- 백종건, 김재준, '건설기업의 지식경영과 기 업성과와의 상관관계 분석', 대한건설관리학회논문집 구조계, 제19권, 제2호(2003), pp. 167-176
- 신규철, '균형성과지표(BSC) 개념의 건설기 업 성과평가모델 개발에 관한 연구', 한국건 설관리학회 학술발표대회논문집, Vol.3(2002), pp.24-34
- 유일한 외, '비교 가능한 건설 산업의 성과측 정 Framework', 한국건설관리학회논문집, Vol.5, No.5(2004), pp.172-182
- Bassioni H. A. et al., 'Performance Management in Construction', Journal of Management in Engineering, ASCE, Vol.20, No.2(2004), pp.42-50 https://doi.org/10.1061/(ASCE)0742-597X(2004)20:2(42)
- Egan, J. Sir, Rethinking Construction:The Report of the Construction Task Force to the Deputy Prime Minister, Department of the Environment, Transport and the Regions, Norwich, 1998
- Latham, M. Sir, Constructing the Team: Final Report of the Government/Industry Review of Procurement and Contractual Arrangementss in the UK Construction Industry, HMSO, Landon, 1994
- Luis F. Alarcon, David B. Ashley, 'Modeling Project Performance for Decision Making', Journal of Construction Engineering and Management, ASCE, Vol.122, No.3, pp. 265-273 https://doi.org/10.1061/(ASCE)0733-9364(1996)122:3(265)
- Michail Kagioglou, Rachel Cooper, Ghassan Aouad, 'Performance Management in Construction: A Conceptual Framework', Construction Management and Economics, London, Vol.19, No.1(2001), pp.85-95 https://doi.org/10.1080/01446190010003425
- Nicolson, R., 'Egan - Rethinking construction', paper presented at the Construction Productivity Network Seminar, Royal Institution of British Architects, Birmingham, November, 1999
- Robert S. Kaplan and David P. Norton, 'Having trouble with Your Strategy? Then Map It', HBR, Vol.78, No.5(2000), pp.167-176
- Robert S. Kaplan and David P. Norton, 'Linking the Balanced Scorecard to Strategy', California Management Review, Vol. 39, No.1(1996), pp.53-79 https://doi.org/10.2307/41165876
- Robert S. Kaplan and David P. Norton, 'Measuring the Strategic Readiness of Intangible Assets', HBR, Vol.82, No.2(2004), pp.52-63
- Robert S. Kaplan and David P. Norton, 'Putting the Balanced Scorecard to Work ', HBR, Vol.71, No.5(1993), pp.134-142
- Robert S. Kaplan and David P. Norton, 'The Balanced Scorecard - Measures That Drive Performance', HBR, Vol.70, No.1 (1992), pp.71-79
- Robert S. Kaplan and David P. Norton, 'The Office of Strategy Management', HBR, Vol.83, No.10(2005), pp.72-80
- Robert S. Kaplan and David P. Norton, 'Using the Balanced Scorecard as a Strategic Management System', HBR, Vol.74, No.1(1996), pp.75-85
- Robert S. Kaplan and David P. Norton, Strategy Maps - Converting Intangible Assets into Tangible Outcomes, HBSP, Boston, 2003
- Simon Beatham et al., 'KPIs:A Critical Appraisal of Their use in Construction', Benchmarking:International Journal, Vol. 11, No.1(2004), pp.93-117 https://doi.org/10.1108/14635770410520320
- Stephen R. Thoms, Candace L. Macken, and Sang-Hoon Lee, Impacts of Design/ Information Technology on Buil - ding and Industrial Projects, CII BM&B, 2001
- U.K. DTI:Department of Trade and Industry, 'Construction Products Industry Key Performance Indicators Handbook', CPI KPI 2002
- Watson P. and L. T. Seng, 'Implementing the European Foundation for Quality Management model in construction', Construction Information Quarterly, Construction Paper 130, 2001