Comparative Analysis of Construction Management Index for Apartment Remodeling Project (공동주택 리모델링을 위한 공사관리 지표 비교분석)

  • Lee, Dong-Heon;Baek, Nak-Ku;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.191-192
    • /
    • 2017
  • After 1980's, as economy was rapidly grown and real estate market was active, greatly increased in population has been supplied to the city. Accordingly, national apartment house market is located in the form of Urban Housing Culture. However, as time goes by the apartment houses where the supply of mass became superannuated and residential environment became poor. So, the environment of old apartment houses has been changed to improve with reconstruction. It has been changed in response to the demands of the times. It is one of essential part in a remodeling field for the future although it has some problems in the way that uses existing buildings.

  • PDF

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

A Study on The Conflict Management for Apartment Reconstruction Project (공동주택 재건축사업의 갈등관리에 관한 연구)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.467-470
    • /
    • 2008
  • Apartment Reconstruction project causes lots of conflicts among stakeholders who don't have professional knowledge on a complicated work-flow In case these conflicts occur, the project might not be well by the damage passed to parties, and so the project cost might be increased, the project might be delayed and hazy as well if the conflicts are not resolved quickly. However, the damage would be indirectly and directly brought to the main parties in apartment reconstruction project because the conflicts aren't managed. Thus, an effective conflict assessment should be preceded, and a process and a system for managing the conflicts should be developed to prevent and settle the conflicts. The purpose of this study classifies the conflicts which are occurred on each phase of the project based on principal facts, and presents the process to develop conflict management system through conflict assessment to each stakeholder.

  • PDF

A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing (공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구)

  • Lee, Young-Jae;Cho, Dong-Hyun;Lee, Mi-Young;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

The Analysis of Waste Factors for Business Phases on Customized Apartment Project (맞춤형 공동주택 프로젝트의 업무단계별 낭비요인 분석)

  • Choi, Jung-Im;Lee, Ki-Suk;Jung, Sung-Ho;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.146-156
    • /
    • 2013
  • Recently, to reflect the various needs of customers in the apartment field, the customized apartment has emerged. From the point of the customer, customized apartments have the definite advantage of being able to guarantee more customer options. On the other hand, from the point of the project manager, there are significant risk factors, with increase of management factors, construction delays, etc. The reasons for this are, to date, the insufficient systematic analysis of the project, and the lack of experience of similar projects. This study provides the waste factors of each phase in a customized apartment project. A survey and interview are conducted to achieve the waste factors using MUDA methodology; a process of the project was analyzed; and a factor of each process was identified. Also, AHP(Analytic Hierarchy Process) are used, to evaluate the waste factors in project stages. The AHP results show that "Design change" and "Inappropriate intervention in construction process" ranked highly in the waste factors. The results of our research will provide a countermeasure that addresses waste factors in similar projects, and contributes to reducing the extra cost and time in new projects.

Effectiveness Analysis of the Construction Schedule for PC Apartment Buildings using a Tower Crane (타워크레인을 적용한 대단지 PC공동주택의 공정계획 효용성 분석)

  • Kim, Ki-Ho;Lee, Bum-Sik;Lee, Dong-Gun;Kim, Min-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.105-106
    • /
    • 2023
  • In project projects where various factors arise, the construction company's initial establishment of a reasonable process plan reduces various variables and potential risks. In order to create a densely written initial process plan, it is necessary to compare the economic feasibility of time and money by reflecting Slack time. Through this, site managers can lead a successful project based on reasonable and stable construction.

  • PDF

Causes of Construction Delays of Apartment Construction Projects: Comparative Analysis between Vietnam and Korea

  • Kim, Young-Mok;Kim, Soo-Yong;Luu, Truong-Van
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.214-226
    • /
    • 2008
  • Construction delay caused considerable losses to project parties. Avoiding construction delays is important to save costs for project stakeholders. The main objective of this paper is to identify major causes of construction delays of apartment construction projects in Vietnam. Sixteen causes of delay were identified through a questionnaire survey of 166 professionals. Factor analysis was employed to categorize these causes. The results of the survey revealed the main causes of delay of apartment projects in Vietnam are: (1) owner's and contractor'S financial difficulties; (2) lack of experienced contractors; (3) late delivery of materials; (4) late construction site handover; (5) owner's late payments for completed works; (6) low bid prices; (7) inappropriate construction method; and (8) defective works and unnecessary reworks. Factor analysis uncovered that causes of delay can be grouped under five categories labeled the five INs: incompetence, ineffectiveness, inadequateness, inapplicableness and inconceivableness. Comparative analysis between the Vietnam construction industry (VCI) and the Korea construction industry (KCI) has been performed to infer valuable lessons for researchers and practitioners in the VCI and the KCI. Comparative analysis indicated that main causes of delay in the VCI somewhat differ from main causes of delay in the KCI. However, "contractor'S financial difficulties", "late construction site handover", "unnecessary rework", "incapable designers", "site clearance difficulties" are common causes of delay in the VCI as well as the KCI. The findings of this research can be used as a guideline to overcome problems in the VCI as well as in other construction industries. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in Korea.

STUDY ON THE CONTINUED MAINTENANCE FACTOR FOR THE DESIGN OF USER MANUAL IN APARTMENT HOUSING ACCORDING TO THE RESIDENTS' NEEDS

  • Jung-Hee Jung;Hee-Chang Seo;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.235-242
    • /
    • 2013
  • With the recent global trends in environmental preservation, the importance of sustainable construction is being highlighted in Korea. In particular, the trend is being discussed about life cycle of the apartment houses in various aspects. However the Korean construction market and housing policy have been increasingly focusing on supplier. Structures become progressively obsolete after a certain period, but their durability can be extended with proper maintenance management. Accordingly, if maintenance management on the structures is made efficiently, waste of construction energy and damage to the environment and economic loss due to early demolition and reconstruction can be effectively prevented. Therefore, this study aims to suggest the user manual design for the efficient maintenance in apartment housing

  • PDF

A Study on Prediction of Earth Retaining Work Cost in the Project Planning Stage -Focusing on Apartment Construction Projects in Seoul- (사업기획단계에서 흙막이 공사비 예측에 관한 연구 -서울시내 아파트 건설사업을 중심으로-)

  • Lee, Jin-Kyu;Yang, Kyung-Jin;Park, Ki-Hyeon;Kim, Chan-kee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.385-392
    • /
    • 2021
  • In general, earth retaining work in construction works enables the construction of structures, prevents the displacement of the surrounding ground to the maximum extent, and plays an important role in ensuring the safety of the surrounding structures and field workers. The earth retaining work and the construction method differ according to the various ground characteristics, surrounding topographical characteristics, repair environment, and design conditions. In particular, in the case of Seoul city, the environments and ground conditions differ according to the area. This study analyzed the earth retaining work cost mainly for the apartment construction project in Seoul and calculated the approximate earth retaining work cost at the project planning stage. A model was developed to predict the cost of earth retaining work that matches the characteristics of Seoul City and predict the construction cost for earth retaining work. This paper presents the predicted earth retaining work cost using a multiple regression model that applies 10 project outlines as independent variables. The error rate of the prediction result of the earth retaining work cost of the apartment construction project in Seoul using multiple regression models was 10.75%.

A RESEARCH ON ECONOMIC AWARENESS AND REQUIREMENT OF DWELLERS TOWARD REMODELING OF APARTMENTS

  • Jea-Sauk Lee;Byung-Hyun Shin;Won Kwon;Chang-Hyun Shin;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.469-479
    • /
    • 2007
  • This paper introduces the result of performing research analysis on awareness and demand on economic aspect of dwellers toward remodeling by aiming at the fact that there are existing dwellers which is the biggest feature of remodeling. Providing services that are suitable for economic conditions and demands of owners or dwellers of Apartment House could be seen as something that must be considered first above all things in remodeling in which consumers have to pay for expenses are specified.

  • PDF