1 |
T. H. Kim, A Study on the Economic Feasibility of Sheeting Methods, Master's thesis, The Graduate School of Construction Engineering Chung-Ang University, pp.42-43, 2007.
|
2 |
Y. C. Ro, C. S. Lee, "Selection of Retaining Wall System for Underground Parking Lots Expansion of Apartments", Korean Journal of Construction Engineering and Management, vol.9, no.2, pp.97-105, 2008.
|
3 |
D. U. Kim, B. G. Kim, D. H. Yeo, S. H. Han, "Quantity-based Early Cost Estimation Model for Road Construction Projects", Korean Society of Civil Engineers, vol.29, no.3, pp.373-379, 2009.
|
4 |
D. W. Shin, G. H. Kim, "Analysis of construction process and cost of self-supported retaining wall method using two row H-pile", The Korean Society of Science & Art, vol.19, pp.425-434, 2015. DOI: http://doi.org/10.17548/ksaf.2015.03.19.425
DOI
|
5 |
Seoul Cleanup System, Available From: http://cleanup.seoul.go.kr/ (accessed July. 21, 2020)
|
6 |
S. S. Jung, M. S. Park, H. S. Lee, I. S. Yoon, "Cost Estimation of Case-Based Reasoning Using Hybrid Genetic Algorithm", Korean Journal of Construction Engineering and Management, vol.21, no.1, pp.50-60, 2020. DOI: http://dx.doi.org/10.6106/KJCEM.2020.21.1.050
DOI
|
7 |
J. H. Oh, B. R. Ahn, "A Study on the Improvement of Construction Cost Standards for Pipe Laying and Joining Work", Journal of the Korea AcademiaIndustrial cooperation Society, vol.21, no.7, pp.675-684, 2020. DOI: https://doi.org/10.5762/KAIS.2020.21.7.675
DOI
|
8 |
Korea ON-line e-Procurement System, Available From: http://www.g2b.go.kr (accessed July. 21, 2020)
|
9 |
K. S. Ha, J. K. Lee, "A Study on the Prediction of Civil Construction Cost on Apartment Housing Projects at the Early Stage", Journal of the Korea Academia-Industrial cooperation Society, vol.13, no.9, pp.4286, 2012. DOI: http://doi.org/10.5762/KAIS.2012.13.9.4284
DOI
|
10 |
G. C. Park, Case Studies on the Economic Analysis to Temporary Earth Retaining Methods, Master's thesis, The Graduate School of Construction Engineering Chung-Ang University, pp.78-79, 2012.
|