• Title/Summary/Keyword: Apartment Construction Project

Search Result 269, Processing Time 0.027 seconds

A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Work Using Productivity Analysis (생산성 분석에 기초한 친환경 리모델링 철거공사 기간 산출 방안)

  • Woo, Joong-Pyung;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.124-132
    • /
    • 2013
  • An influx of the population to the city has soared due to industrialization. As times go by, cities become densely populated so Korean government started to construct a number of buildings including apartment housings. Because they have become functionally, structurally, esthetically deteriorated over the past two decades. some improvements are needed. There are mainly two ways to improve old buildings: remodeling and reconstruction. Between the two, the first one is more popular as it is less time-consuming and more eco-friendly. Demolition work comes first for both of them and it should not give negative effects since it is regarded as a CP(Critical path) in the overall process. For this reason, a thorough construction management must be done. The reality, however, demolition is managed by the construction manager's experiences and decisions. If the key factor of demolition which is the planning of manpower and machine equipment, is determined by unscientific and subjective judgments, its period and risk also will increase. In particular, eco-friendly demolition can be more risky because it's been rarely conducted. Therefore, scientific and objective ways of demolition management are needed. In this context, this paper aims at analyzing productivity in each process of demolition focusing on manpower and machinery equipment which are the main parts of demolition assuming that the demands of eco-friendly remodeling demolition projects will be increasing. At the same time, by estimating working period through the output, this paper would be helpful to set up the plans for overall project in earlier stage.

Productivity Analysis of Reinforced Concrete Works and Tower Crane Working Ratio for High-rise Apartment Buildings (초고층 공동주택 RC 공사의 생산성 및 타워크레인 가동율 분석)

  • Kwon, Jihun;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.55-62
    • /
    • 2021
  • The productivity of rebar-work and form-work was analyzed with data collected from an actual high-rise construction project, and the actual utilization rates of three tower cranes were also investigated. It was found that the average productivity of the form-work increased from 12.00~8.71(㎡/man·day) in the underground and above-ground/lower-floor to 11.94~20.73(㎡/man·day) in the standard floor. Comparing the productivity of core area to outer, the former was found to be about 11% higher. Moreover, the rebar-work productivity of the outer area(1.12 ton/man·day) was approximately 9.6% higher than that of the core area for the standard floor. The average utilization rates of three TC were surveyed to be about 63.49%, and it was revealed that rainy weather(6.1%), strong winds(6.1%), holidays(17.8%), TC lifting work(5.8%), and other failures and repairs(0.07%) were the causes of non-operation. These research results are expected to be beneficial data in planning and managing the process of high-rise RC construction works in the future.

Development of a Feasibility Evaluation Model for Apartment Remodeling with the Number of Households Increasing at the Preliminary Stage (노후공동주택 세대수증가형 리모델링 사업의 기획단계 사업성평가 모델 개발)

  • Koh, Won-kyung;Yoon, Jong-sik;Yu, Il-han;Shin, Dong-woo;Jung, Dae-woon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.22-33
    • /
    • 2019
  • The government has steadily revised and developed laws and systems for activating remodeling of apartments in response to the problems of aged apartments. However, despite such efforts, remodeling has yet to be activated. For many reasons, this study noted that there were no tools for reasonable profitability judgements and decision making in the preliminary stages of the remodeling project. Thus, the feasibility evaluation model was developed. Generally, the profitability judgements are made after the conceptual design. However, decisions to drive remodeling projects are made at the preliminary stage. So a feasibility evaluation model is required at the preliminary stage. Accordingly, In this study, a feasibility evaluation model was developed for determining preliminary stage profitability. Construction costs, business expenses, financial expenses, and generally sales revenue were calculated using the initial available information and remodeling variables derived through the existing cases. Through this process, we developed an algorithm that can give an overview of the return on investment. In addition, the preliminary stage feasibility evaluation model developed was applied to three cases to verify the applicability of the model. Although applied in three cases, the difference between the model's forecast and actual case values is less than 5%, which is considered highly applicable. If cases are expanded in the future, it will be a useful tool that can be used in actual work. The feasibility evaluation model developed in this study will support decision making by union members, and if the model is applied in different regions, it will be expected to help local governments to understand the size of possible remodeling projects.

An Analysis of the Characteristics of the Civil Complaints Occurred to the Landscape Architecture Project in Apartment Complex (아파트 단지 조경사업에서 발생하는 민원 특성 분석 - 민원의 공공성과 조치용이성 분석을 중심으로 -)

  • Cho, Se-Hwan;Lee, Myeong-Hun;Jo, Hyun-Kil;Kim, In-Ho;An, Seung-Hong;Oh, Jeong-Hak
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.5
    • /
    • pp.78-90
    • /
    • 2013
  • The purpose of this study was to analyze the types and characteristics of public complaints caused by the landscape architecture projects in the case of apartment complex. Furthermore, its purpose was also to propose as the basis data for the minimization of complaints in the course of future landscape architecture projects. To analyze and categorize the apartment complex civil complaints, we collected basic and case study data from LH Corporation, SH Corporation and GICO from 2009 to 2012. We also categorized 672 landscape complaints to 73 categories and conducted a survey from residents and landscape architecture. This Survey is to use IPA can collect character(public-private), handling of civil affair(easy-hard) and analyze typical characters and difference of civil complaint awareness between landscape architecture and residents. First, we were categorized 73 civil complaints by type in 5 categories such as park, green space and street trees, pedestrian road, facilities, and others. Second, the most common landscape complaints appear in green spaces, street trees, facilities, pedestrian roads and park orders. Third, results of the analysis conducted for each item which are publicity and measures the ease. 'Facilities', 'landscape and greenery', 'pedestrian road' and others were commonly appears from residents and professional awareness of the complaints. However, complaints of park appear different awareness between landscape architecture and residents. Fourth, 35 from 73 civil complaints(47.9%) are having high publicity and easy to measure, 25 civil complaints(34.2%) has analyzed to individual and difficult to measure so about the these complaints need to check from the design step so that it is necessary to minimize the problem of additional expense by civil complaints burden and decrease the confidence of residence problem were considered.

Comparison of Alternatives of Water-Friendly Facilities in an Industrial Complex (산업단지내 친수시설 대안의 비교)

  • Chung, Sang-Ok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1570-1576
    • /
    • 2008
  • Construction of the water-friendly facilities in the apartment complex and industrial complex became popular these days. In planning water-friendly facilities, kinds, layouts, water sources, water quality and water circulation system should be studies. In this study, several alternatives for a regional industrial complex project were studies and a most reasonal alternative was selected. A main canal across the central part of the complex is the principle facility with ponds and parks. The water source alternatives were a river nearby, a reservoir, ground water and urban water supply system. For each system, water quantity and quality, circulation system, permit and maintenance were compared. The facilities should be constructed with natural material such as rock and gravel. Average depth and velocity in the canal should be 10 cm and 0.15 m/s, respectively in order to people can feel the water flow in the canal. Based on the comparison, it is found that using the ground water, and water circulation system with storage tanks at the upper and lower ends of the canal system is the best alternative.

  • PDF

Research on the Importance-Satisfaction Perception of Users of Private-Initiated Park Development Project - Focused on Jikdong Neighborhood Parks in Uijeongbu City - (민간공원 특례사업 추진 대상지 이용객의 중요도-만족도 인식에 관한 연구 - 의정부 직동근린공원을 대상으로 -)

  • Kim, Jong-Ho;Kim, Gun-Woo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.63-76
    • /
    • 2022
  • This study was conducted to compare the perceptions of the park use status, importance, and satisfaction of users in the first implemented and completed Uijeongbu Jikdong Neighborhood Park among the private park special projects carried out as a countermeasure for long-term non-execution of urban parks. To this end, in the initiated project, apartment residents and non-residents were classified according to the promotion plan, and a questionnaire research on importance and satisfaction was conducted to analyze the park use status and IPA(importance-performance analysis). First, as a result of the analysis of the current situation in terms of locational characteristics that occur during the promotion of special projects for private parks, unlike the mountainous areas, the targeted site was close to flat land, indicating that users' satisfaction with the landscape was high. Second, the access of the apartment residents in the initiated project site was easy. Thus, the use rate of residents was relatively higher than that of the non-residents. Third, differences in perception by item were identified through the analysis of IPA and the establishment of strategies. In quadrant I, among the facilities and services, installing restrooms was the priority for residents, and parking facilities and rest facilities were the priority than installing restrooms for non-residents. In quadrant II, overall scores for residents and non-residents were similar, but the distance to the park was in quadrant III due to the low level of satisfaction among non-residents. In this study, the difference in perception between residents and non-residents may cause problems in access and facilities in managing the park in the future. Therefore, it would be necessary to find a way to improve it by establishing a management strategy that takes into account the difference in the perception of residents after construction. In addition, through the results of this study, it was judged that the purpose of park development, the selection of types of parks, and the selection of plans and management indicators for each kind would be significant in the promotion of initiated projects in the planning of park development.

Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture (공동주택 조경관리 입찰 실태와 개선방안)

  • Hong, Jong-Hyun;Park, Hyun-Bin;Yoon, Jong-Myeone;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.4
    • /
    • pp.41-54
    • /
    • 2020
  • This study was conducted to provide basic data for a transparent and fair bidding system by identifying problems and suggesting improvement measures through an analysis of the bidding status for construction projects and service-related landscaping of multi-family housing. To this end, we used the data from the "Multi-Family Housing Management Information System (K-apt)" that provides the history of apartment maintenance, bidding information, and the electronic bidding system to examine the winning bid status and amount, along with the size and trends of the winning bids by year, and the results of the selection of operators by construction type. As a result, it was found that out of the total number of successful bids (36,831), 4.4% (16,631) were in the landscaping business, and the average winning bid value was found to be about 24 million won. According to the data, 73% of the landscaping cases were valued between 3 million won and 30 million won, and 58.6% of the cases were in the field of "pest prevention and maintenance". 36% of the total number of bids were awarded from February to April, with "general competitive bidding" accounting for 59.8% of the bidding methods. As for the method of selecting the winning bidder, 55% adopted the "lowest bid" and "electronic bidding method," and 45% adopted the "qualification screening system" and "direct bidding method." As an improvement to the problems derived from the bidding status data, the following are recommended: First, the exception clause to the current 'electronic bidding method' application regulations must be minimized to activate the electronic bidding method so that a fair bidding system can be operated. Second, landscaping management standards for green area environmental quality of multi-family housing must be prepared. Third, the provisions for preparing design books, such as detailed statements and drawings before the bidding announcement, and calculating the basic amount shall be prepared so that fair bidding can be made by specifying the details of the project concretely and objectively must be made. Fourth, for various bidding conditions in the 'business operator selection guidelines', detailed guidelines for each condition, not the selection, need to be prepared to maintain fairness and consistency. These measures are believed to beuseful in the fair selection of landscaping operators for multi-family housing projects and to prepare objective and reasonable standards for the maintenance of landscaping facilities and a green environment.

Network Planning on the Open Spaces in Geumho-dong, Seoul (서울 금호동 오픈스페이스 네트워크 계획)

  • Kang, Yon-Ju;Pae, Jeong-Hann
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.5
    • /
    • pp.51-62
    • /
    • 2012
  • Geumho-dong, Seoul, a redeveloped residential area, is located in the foothills of Mt. Eungbong. The geographical undulation, the composition of a large apartment complex, and the partial implementation of the redevelopment project have caused the severe physical and social disconnections in this area. In order to recover functioning in the disconnected community, this study pays attention to the regeneration of the open spaces as an everyday place and in the form a network system among those open spaces. Various types of the open spaces are classified into points or faces, 'bases' and linear 'paths' analyze the network status. More than half of the open space have connecting-distance of 500m or more. Furthermore, many areas are not even included in the service-area of the open spaces. Analysis of the connectivity and integration value using the axial map has carried out to check weak linkages and to choose the sections where additional bases are required. In addition, to improve the quality of the bases and the paths, a field investigation is conducted and problems are diagnosed. The network planning of the open spaces in Geumho-dong is established, ensuring the quality and quantity of bases and paths. The plan includes the construction of an additional major base in the central area and six secondary bases in other parts, and comes up with ways to improve the environment of underdeveloped secondary bases. In the neighborhood parks at Mt. Daehyun areas, the major path are added, and the environment of the paths is improved in certain areas. Because of the network planning, the connecting-distances between bases are reduced significantly, the connectivity and integration value of the area are increased, and the service areas of the open spaces cover the whole area properly. Although this study has some limitations such as the needs for the legal and institutional supports and difficulties of a quantitative indexing process, its significance lies in the suggestion of a more reasonable and practical plan for the overall network system by defining complex types of open spaces simply and clearly and by examining the organic relationships quantitatively and qualitatively.

A Study on the Characteristics of Ecosystem Change and Management in Urban Wetland - Focusing on the Dunchon-Dong Ecological and Scenery Conservation Area, Seoul - (도시 습지 자연생태계 변화 특성 및 관리방안 연구 - 서울시 둔촌동 생태·경관보전지역을 대상으로 -)

  • Han, Bong-Ho;Park, Seok-Cheol;Kim, Jong-Yup
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.3
    • /
    • pp.1-20
    • /
    • 2023
  • The present study has monitored the changes in the biodiversity of Dunchon-Dong ecological and landscape conservation area after the restoration of the wetland, identified and analyzed the threats to the ecosystem, and presented a management plan accordingly. In this area which was forests and rice paddies in the past, apartment reconstruction is currently underway, with some hinterland forests and wetlands remaining. When we look into the change in the floras, the total number of species was 193 in 2000 before the restoration, it decreased from 2004 to 2006, and as of 2019, it was 149, showing an increasing trend. The result of comparing the species that emerged before and after the restoration showed an increase in Cyperaceae herbs such as Carex maximowiczii and Carex dispalata growing in wetland areas within forests and Schoenoplectiella juncoides and Schoenoplectus tabernaemontani growing in areas within wetlands where shallow water is maintained. As a result of analyzing the change in the area ratio of each type of extant vegetation, the wetland native herbs formed the power at the highest ratio after the restoration. The change in the power of the wetland native herbs was on an increasing trend until 2007, after which it decreased much in 2010 and then gradually increased, showing values of 26.6% in 2000, 44.6% in 2002, 49.0% in 2005, 53.3% in 2007, 28.7% in 2010, and 37.3% in 2019. The cause of the decrease in 2010 was judged to be due to the vegetation management conducted to secure open water and remove organic matter in freshwater reservoirs. The amphibia which emerged from 2000 to 2019 was a total of 9 species including Hynobius leeshii, Bufo gargarizans, Kaloula borealis, and Rana uenoi. As a result of the changes in the emerging wild birds, the species diversity index before the restoration was 0.9922 in 2000, and the species diversity index after the restoration gradually increased to 1.2449 in 2005, 1.2467 in 2010, and 2.2631 in 2019. The amphibia and wild birds inhibiting in the Dunchon-Dong forest and wetland were judged to have increased through continuous wetland maintenance such as naturalized plant removal management, native plant maintenance, and open water securing management. For the ecosystem preservation management of the Dunchon-Dong ecological and landscape conservation area, it was suggested to minimize the impact of the Dunchon-Dong reconstruction project, reorganize the indiscriminate access roads adjacent to the wetland, and reorganize the main entrance to the wetland. For ecosystem restoration management, systematic restoration and ecological buffer planting were suggested to be carried out at the time of construction fence demolition.