• Title/Summary/Keyword: 통합공종

Search Result 23, Processing Time 0.023 seconds

A Study on the Establishment Plan of Integrated Construction Information Classification (통합건설정보분류체계의 구축방안에 관한 연구)

  • Lee Kyo Sun;Park Hwan Pyo;Oh Uno;Park Sang Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.99-106
    • /
    • 2002
  • It was few to the integrated information classification system In domestic construction. Furthermore, it became considerable obstacles to hamper the increase of national competitiveness as well the hoarding of information and overlapped investment. The standardization of information classification is also necessary prior to the Computer-Integrated Construction, CALS(Continuous Acquisition & Life-cycle Support/Electronic Commerce) in construction, EVMS(Earned Value Management System) and the various projects which manipulate construction information. Therefore, this report suggests the development direction and application proposal of Integrated Construction Information Classification.

Improvement of 3D Design Process in the Combined Cycle Power Plant Using Business Process Reengineering (복합화력 발전플랜트에서 업무재설계기법을 이용한 3차원설계의 개선방안)

  • Choi, Hong-Yeol;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.8 no.3
    • /
    • pp.55-63
    • /
    • 2012
  • This study aims to suggest the improved business process by analyzing the current design process on work flow of the 3D design of power plant, drawing a problems and setting the improving direction through the integration method of the business process reengineering(BPR). In order to realize the improved business process, the integrated design performance system focused on the 3D design was established and accordingly the study analyzed cases of project performances through the integration system and drew the improved effects quantitatively. In the result of the project performance applied with the 3D design integration system, it showed 20.4% design cost saving effect for appropriate rated cost and the integration of design information from each design parts, sub contracters and vendors reduced overlapped works and improved the consistency of repeated design alteration.

  • PDF

A study on How to Improve the Work of Professional Landscape Construction in Preparation for the Reorganization of the Production System in the Construction Sector - Based on the Survey Results - (건설분야 생산체계 개편에 대비한 조경분야 전문공사업 업무 개선 방향 - 설문조사 결과를 중심으로 -)

  • Ahn, Myung June
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.52 no.3
    • /
    • pp.33-45
    • /
    • 2024
  • The government is promoting the reorganization of the construction indusrty under the theme of reorganizing the production system. However, it has been pointed out that this is contrary to the increasingly specialized and technical skills of the landscaping field. Therefore, it is urgent to respond to the construction industry integration policy and improve an appropriate work system and the content of the landscape field. Therefore, this study investigated the intention of the industry to reorganize the production system and the production structure of the landscape field, so that it can be used as a reference for future changes. As a result of the survey, 1) the perception of the reorganization policy is a highly requesting step-by-step promotion that reflects the industry's will, 2) the system is divided into generalization and specialization and is highly opposed to integration, 3) appropriate design and construction costs are the most important directions for improving landscape construction projects, and 4) reestablishing the relationship with related civil engineering works is important for improving detailed construction types. Overall, it was pointed out that the current specialized landscape construction does not sufficiently reflect the changing landscape business and is only appropriate for subcontractors in other industries. Therefore, it is necessary to promote policies that reflect this. In the long run, it is urgent to establish the status of landscape construction as an independent object, and it is necessary to supplement the legal system and change the industry accordingly.

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

A Study on Classification Standard for Efficient Maintenance System of Educational Facilities (교육시설물의 효율적 유지관리 체계정립을 위한 분류 기준연구)

  • Kim, Song-Hwa;Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.403-407
    • /
    • 2007
  • Korean Government conducted "a research for establishing the integrated construction information classification system" and suggested the classification system for the first and second level in terms of the complexity in May, 2001. The Ministry of Construction and Transportation announced a standard of the integrated construction information classification system using previous research in August, 2001. Since 2005, many BTL projects have been constructed for the educational facility. However, there is mixed official standard of the system for the educational facility. Moreover, it is difficult for the SPC to use the current "integrated construction information classification system", since the item in the educational facility cannot be easily located in the current system. Thus, this research suggests an efficient maintenance system for the educational facility. Two classification systems, space-oriented and element-oriented systems, are suggested to increase efficiency of the classification system.

  • PDF

A Study on the Application of Supply Chain Management in Curtain Wall Engineering (커튼월 공사에서의 공급사슬관리 적용에 관한 연구)

  • Park Sang-Woo;Park Sang-Jun;Kwon Won;Kim Chang-Duk;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.301-304
    • /
    • 2004
  • The curtain wall engineering of local high-rise buildings consists of many phases such as design, curtain wail design, manufacture, procurement, construction and facility management, each of which also involves many' actors such as architect, curtain wall consultants, manufacturers, contractors, and facility managers. Moreover, the method for controlling the C/W process of each participant is needed. Eliminating wastes and problems existed in the C/W process can be more effective. What is more, it is necessary to improve the efficiency of the current process and to strengthen the competence through application of SCM to the C/W life-cycle. In addition, it is important that a ]ot of information transfer smoothly and share through information system. Therefore, this study aimed to propose the scope of application and the improvement directions in applying Supply Chain Management concept.

  • PDF

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

A Study on the Improvement of Specification in connection with Construction Lessons Learned Database (건설공사 지식데이터베이스 연계를 통한 시방서 개선방안)

  • Song Jae-Young;Lee Tai-Sik;Choi Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.511-514
    • /
    • 2002
  • Nowadays, domestic construction companies make an effort to share knowledge and experience accumulated while conducting a project. One way of improving knowledge sharing is to develop specifications which are linked to the expert's knowledge and experience based on the specification classification. Therefore, the purpose of this paper is to review the current domestic specification system and develop the specification linked to the construction lessons learned database. It is expected that the proposed specification system will support the decision making process by effectively providing the knowledge and solution.

  • PDF

Application of Supply Chain Management Concept to the Various Types of Curtain Wall Construction (커튼월의 공법 및 조달 유형에 따른 SCM 적용방안)

  • Moon Woo-Kyoung;Yun Soo-Won;Kim Yea-Sang;Chin Sangyoon;Park Ji-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.612-615
    • /
    • 2004
  • Today, the curtain wall is used in many construction projects because of excellent economical efficiency and constructability. The life-cycle process of curtain wall construction consists of the architectural design, curtain wall design, manufacturing, const겨ction, and maintenance phase which has become one of the most important objects that have to be managed. Since the general management method focused on each separated phase, it has accompanied many problems such as increases of the cost and duration, and loss of productivity. To solve these problems, it is necessa교 to have a new management method based on supply chain management. Thus this research analysed the processes of stick system, semi-unit system, unit system, and panel system classified by the type of the curtain wall, and suggested proper methods of application of SCM concept to each type of curtain wall construction.

  • PDF

A Study on Building Method of the Construction Industry Thesaurus Using Facet Analysis Method (패싯 분석 기법을 활용한 건설 시소러스 구축 방안에 관한 연구)

  • Hong, Ki-Churl
    • Journal of Korean Library and Information Science Society
    • /
    • v.48 no.1
    • /
    • pp.345-371
    • /
    • 2017
  • Traditionally, the construction industry field is one of the typical fields using facet analysis method. Internationally the facet analysis method is applied to the classification scheme "Uniclass" or thesaurus "Construction Industry Thesaurus(CIT)". In the case of Korea, the facet analysis method is being used in classification scheme "Construction Industry Classification System" but it is difficult to find studies on facet analysis method in thesaurus or building case study. This study aims to establish facet types by introducing building of thesaurus for information retrieval in construction field using facet analysis method and to suggest building plan of thesaurus in construction field using facet analysis method. In this paper, We establish the 11 top facets(agent/patient, artifacts, abstract, material, parts/component, works, attribute, media, process, space, time) and the 13 subfacet as rudimental facets and suggest building plan according to thesaurus building procedure which is suggested by International Standard(ISO 25964-1). The result of this study is expected to apply to facet based thesaurus. And it is also expected to reuse in Taxonomy or Ontology etc. and to use in interoperability with the classification scheme of Construction filed.