Improvement of 3D Design Process in the Combined Cycle Power Plant Using Business Process Reengineering

복합화력 발전플랜트에서 업무재설계기법을 이용한 3차원설계의 개선방안

  • Choi, Hong-Yeol (Course of Plant Engineering, Graduate School of Engineering, Hanyang University) ;
  • Moon, Seung-Jae (School of Mechanical Engineering, Hanyang University)
  • 최홍렬 (한양대학교 공학대학원 플랜트엔지니어링 전공) ;
  • 문승재 (한양대학교 기계공학과)
  • Received : 2012.06.25
  • Published : 2012.09.01

Abstract

This study aims to suggest the improved business process by analyzing the current design process on work flow of the 3D design of power plant, drawing a problems and setting the improving direction through the integration method of the business process reengineering(BPR). In order to realize the improved business process, the integrated design performance system focused on the 3D design was established and accordingly the study analyzed cases of project performances through the integration system and drew the improved effects quantitatively. In the result of the project performance applied with the 3D design integration system, it showed 20.4% design cost saving effect for appropriate rated cost and the integration of design information from each design parts, sub contracters and vendors reduced overlapped works and improved the consistency of repeated design alteration.

복합화력 발전플랜트의 주기기 특성을 고려한 설계품질 향상과 원가절감을 위해 3차원설계의 업무절차를 대상으로 업무재설계기법을 이용한 개선된 업무절차를 제시하였다. 업무 구현을 위해 3차원설계 프로그램을 중심으로 통합된 설계운영시스템을 구축하였으며 개발 모듈로는 주기기 제작사에서 제공한 3차원 모델정보를 사내 표준코드와 비교하여 변환시켜주는 3차원 모델정보 변환시스템을 통하여 3차원 통합시스템의 연계성을 강화하였다. 또한 3차원설계의 수행사례를 분석하여 개선된 효과를 정량적으로 산출하였으며 분석결과 적정평가금액 대비 설계분야별 평균 20.4%의 설계비용 절감효과를 나타냈다. 업무개선 사항은 각 공종 및 협력사와 주기기 제작사에서 제공되는 설계정보의 통합화로 후행 부서의 중복 작업감소 및 반복적인 설계변경에 대한 일관성을 향상시켰다.