Development of Earned Value Management System by Using Visualization Index and WBS Map

시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발

  • Published : 2009.01.31

Abstract

Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

건설공사 공정 공사비 통합관리시스템(EVMS, Earned Value Management System)에서 대부분의 정보들은 공사정보 분류체계(WBS, Work Breakdown Structure)를 중심으로 활용된다. 즉, 공정편차와 비용편차 등의 EVM 성과정보 역시 WBS에서 선택된 공종을 중심으로 결과물이 분석되므로, EVMS에서 WBS는 정보중심 역할을 하게 된다. 본 연구에서는 WBS 정보가 4상한의 좌표방식으로 표현되어 프로젝트의 대 중 소 공종이 용이하게 표현될 수 있는 좌표식 공사정보분류체계(WBS Map) 표현기법을 구축하였다. 또한 연구에서는 WBS Map에 근거한 EVMS를 개발하였으며, 개발된 EVMS에서는 각종 속성 지표값들을 색상기호 등으로 시각화하는 방법론을 구축하여 EVMS 정보의 실무 활용성을 높일 수 있도록 하였다.

Keywords

References

  1. Abudayyeh, O. Y. and Rasdorf, W. J.(1991), 'Integrated Cost and Schedule Control Automation', Construction in 21st Century, ASCE, pp.686~689
  2. Abudayyeh, O. Y. and Rasdorf, W. J.(1993), 'Prototype Integrated Cost and Schedule Control System', Journal of Computing in Civil Engineering, ASCE, 7(2), pp.181~198 https://doi.org/10.1061/(ASCE)0887-3801(1993)7:2(181)
  3. Hendrickson, C. and Au, T.(1989), Project Management for Construction, New Jersey, Prentice Hall
  4. Rasdorf, W. J. and Abudayyeh(1991), 'Cost and Schedule Control Integration', Issues and Needs, Journal of Construction Engineering and Management, ASCE, 117(3), pp.486~502 https://doi.org/10.1061/(ASCE)0733-9364(1991)117:3(486)
  5. 김용석, 송성진(1994), '건축공사의 일정/비용 통합관리 체계에 관한 연구', 대한건축학회 학술발표회 논문집, 14(1), pp.487~490
  6. 이군재, 김선국, 한충희(2000), '건축공사의공정-원가-자원 통합관리 모델에 관한 연구', 대한건축학회 학술발표회 논문집, 20(2), pp.651~654
  7. 김경주(2000), '도로건설사업 공정.원가 통합관리 지원을 위한 WBS 구축방안 연구', 대한토목학회 논문집, 20(6-D), pp.669~680
  8. 김우영, 원동수, 이현수(2001), 'EVMS 적용을 위한 최적 성과측정기준선 설정 및 진도율 산정 방법', 한국건설관리학회 학술발표대회 논문집, pp.395~398
  9. 양용철, 김상희, 김재준(2003), '공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리', 한국건설관리학회 논문집, 4(4), pp.123~137
  10. 윤석헌, 김성식 (2005), '공정-내역 정보연계를 위한 통합 건설정보 분류체계 기반의 공통WBS 활용방안 / 도로공사사례를 중심으로', 한국건설관리학회 논문집, 6(6), pp.107~114
  11. 이유섭 (2004), 'EV기반 공사관리시스템 기능의 비교분석 연구, 한국건설관리학회 논문집', 5(1), pp.168~174