• Title/Summary/Keyword: 턴키계약

Search Result 23, Processing Time 0.027 seconds

The Study on Analysis of the Claim Elements for Preventing the Potential Claim in a Large-Scale Turnkey-Base Building Project - Focused on Cases of Domestic Project - (대형 건축 턴키공사의 클레임예방을 위한 클레임 요인 분석에 관한 연구 - 국내 사례를 중심으로 -)

  • Yoon Jun-Seon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.205-211
    • /
    • 2005
  • Turnkey projects accounting for some $10\%$ of the total volume of the projects in the domestic market have been often implemented without the process of full-scale review or study because of clients' lack of expert and expertise. Moreover, many projects have been executed under the terms and conditions of the contact which were found to be unilaterally in favor of the clients. The study, as part of effects to mitigate the claims that would possibly be caused by the potential problems with the typical turnkey projects, were intended to identify the elements of the claims virtually being occurred at the construction sites, and then analyze the degree of influence on the project so as to be able to incorporate the outcome into the plan at the working-levels. As a result of experts' review, through the survey, of the elements once extracted, those having relatively higher degrees of influence on turnkey projects were determined, and the investigation aimed at estimating the amount of claims in terms of value were conducted to eventually identify, evaluate and verify the elements that had affected the Project together with the degree of influence.

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction (개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.164-177
    • /
    • 2013
  • From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.

Improvement of Procedures on Design Deliberation System for Turnkey and Alternative-Design Contracts (턴키.대안입찰 설계심의 및 평가제도의 개선방안)

  • Park, Hong-Tae;Lee, Yang-Kyoo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.1
    • /
    • pp.31-38
    • /
    • 2011
  • Turnkey and alternative-design contracts was introduced operation in the country from january 2004 to February 2010. this was introduced operation. The selecting method of contractor for turnkey projects has being operated by an open forum type that consists of technical committee and appraisal committee in an integrated design approach deliberations. But to improve the operation of the problems, the government is operating design review committee consisting of the central, local and special design advisory committee in march 2010. But this system has also been suggested as still problems, too many contracts by large companies, increasing of design cost and excessive competition. This study is intended to contribute that turnkey and alternative-design contracts can be well operated in domestic construction markets. In this paper suggests some improvement methods and operational problems caused from application of an open forum type for selecting contractor of turnkey project.

A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project - Focusing on Domestic Project - (건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내공사 사례중심으로 -)

  • Yoon Jun-Seon;Yoo Byoung-Eok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.93-99
    • /
    • 2006
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

A Study on the Risk Examination of the Unit Price of Public Housing Construction Projects (공공주택공사에서의 도급단가 리스크 규명에 관한 연구)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.35-44
    • /
    • 2010
  • Currently, the unit price of public construction projects are not being evaluated appropriately for several reasons. First, the evaluation of the unit price differ per nature of the bidding process and its estimation process. In fact, pricing is determined to meet the total price in turnkey projects and to pass the low bid price deliberation process in unit price projects, and thus, such prices cannot be said to be reasonable prices per public project. After the contract is awarded, however, the prices determined without taking into consideration the characteristic of each bidding process and price estimate process are used for the valuation of progress payment, design changes, and escalation. Furthermore, this is also being applied to other low bid deliberation process as actual public project unit price, thereby affecting other processes as well. In effect, this system increases the risks for both the owner and the bidder who have determined the unit price. This research examines the risk factor and its extent in order to properly manage it in preparation for the future.

A study on the Construction Claims Between Parties Without Privity (국내 건설분쟁에서 비계약 당사자간의 건설분쟁에 관한 연구)

  • Yun Dae-Jung;Han Sung-Heon;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.300-305
    • /
    • 2002
  • The construction project is a complex undertaking involving multiple participants. Conflicts are inherently natural in the construction projects and subsequently, a success of projects mainly depends on how well to cope with the conflicts. In the past, courts usually took the position that the professional's exposure in damages for negligent performance of any of his/her duties would not extend to strangers to the contractual arrangement. However, courts today generally reject that rationale which was earlier in vogue and protect architects, engineers, and contractors from being liable to third parties. It means that the lack of privity of contract could rarely protect a profession in a suit alleging the negligence or professional malpractice in preparing plans or specifications. The main goal of this paper is to enhance the understanding of the legal aspect of privity and to provide the trend of no-privity disputes through the analysis of lawsuit cases during the last 40 years. On the base of the analysis, importance of the third relationship and the liability in construction disputes is presented.

  • PDF

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering (시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리)

  • Hong, Dae Geun;Byun, Hee Chul;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.