Browse > Article

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction  

Park, Hong Taea (Department of Civil Engineering, Kongju National University)
Lee, Yang Kyu (Department of Civil Environmental Daelim University)
Publication Information
Journal of the Society of Disaster Information / v.9, no.2, 2013 , pp. 164-177 More about this Journal
Abstract
From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.
Keywords
Turnkey Alternative Tendering Construction; The Successful Bidder Determination Method; Contract Performance Method; The Success Rate;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Lee YK, Kang LS, Park JH, Jeon SC (2005), Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects, Journal of the Korean Society for Railway, No. 8, pp.460-469
2 Lee YK, Kang LS (2007), Improvement of Bidding Procedure and Design Review System of Turnkey and Alternative-design Contracts. Journal of the Korean Society of Civil Engineers, No. 2, pp.491-497
3 Lee YK, Park HT (2011), Improvement of Procedures on Design Deliberation System for Turnkey and Alternative-Design Contracts. Journal of the Korean Society for Railway, No.14, pp31-38
4 Lee SH(2005), turnkey alternative Tendering Market Trends, Construction Industry Institute
5 Lee YS(2011), turnkey bid adequacy, Korean Construction News
6 Molenaar, K. R.(1999) Public-Sector Design/Build Evolution and Performance. Journal of Management in Engineering, Vol. 15, No.2, pp.54-62
7 Ministry of Land, Transport and Maritime Affairs (2009(b)), criteria of large-bidding method deliberation. Technology Security Administration, the construction environment
8 Ministry of Land, Transport and Maritime Affairs (2009), business tips on turnkey alternative bid Institution. Technology Security Administration, the construction environment
9 Ministry of Land, Transport and Maritime Affairs (2009(c)), Batch bid designed eligible deliberation and valuation plan, echnology Security Administration, the construction environment
10 Foreign Cases. Journal of the Korean Society of Civil Engineers, No.3, pp.235-237
11 Adrian, James J.(1981), The Construction Management Process. Reston Publihing Co. Inc.
12 Construction & Economy Research Institute (2011), turnkey alternative bid accept ratio. Resources
13 Jang HS (2012), A Study on Strategies for Enhancing Transparency of Domestic Construction Industry
14 Lee SH (2004), the correlation .of the government construction pass rate and profitability, Construction and Transportation, pp.50-57