Abstract
Turnkey projects accounting for some $10\%$ of the total volume of the projects in the domestic market have been often implemented without the process of full-scale review or study because of clients' lack of expert and expertise. Moreover, many projects have been executed under the terms and conditions of the contact which were found to be unilaterally in favor of the clients. The study, as part of effects to mitigate the claims that would possibly be caused by the potential problems with the typical turnkey projects, were intended to identify the elements of the claims virtually being occurred at the construction sites, and then analyze the degree of influence on the project so as to be able to incorporate the outcome into the plan at the working-levels. As a result of experts' review, through the survey, of the elements once extracted, those having relatively higher degrees of influence on turnkey projects were determined, and the investigation aimed at estimating the amount of claims in terms of value were conducted to eventually identify, evaluate and verify the elements that had affected the Project together with the degree of influence.
국내의 연간 공사발주 물량의 약 $10\%$를 차지하고 있는 턴키공사는 발주처의 인력부족과 기술력부족으로 인하여 충분히 검토되지 못하고 진행되는 경우가 많으며, 발주자우위의 계약조항을 포함하고 있는 등의 문제점을 안고 진행되고 있다. 본 논문은 턴키공사가 가지고 있는 문제점으로 인하여 발생하게 될 클레임의 효과적인 예방을 위하여 현장에서 실제로 발생하고있는 클레임요인을 추출하고 영향도를 분석하여 그 결과를 실무에서 사용할 수 있도록 하는데 목적이 있다. 추출된 요인들에 대해서 전문가들에게 설문조사를 실시하여 턴키프로젝트에 미치는 영향도가 높은 클레임요인을 선별하고, 사례분석을 통한 클레임 금액의 조사를 실시하여 어떤 요인들이 클레임에 얼마나 영향을 미치는 지를 분석 검증하였다.