Improvement of Procedures on Design Deliberation System for Turnkey and Alternative-Design Contracts  

Park, Hong-Tae (공주대학교 건설환경공학부 토목환경공학과)
Lee, Yang-Kyoo (대림대학 토목환경과)
Publication Information
Journal of the Korean Society for Railway / v.14, no.1, 2011 , pp. 31-38 More about this Journal
Abstract
Turnkey and alternative-design contracts was introduced operation in the country from january 2004 to February 2010. this was introduced operation. The selecting method of contractor for turnkey projects has being operated by an open forum type that consists of technical committee and appraisal committee in an integrated design approach deliberations. But to improve the operation of the problems, the government is operating design review committee consisting of the central, local and special design advisory committee in march 2010. But this system has also been suggested as still problems, too many contracts by large companies, increasing of design cost and excessive competition. This study is intended to contribute that turnkey and alternative-design contracts can be well operated in domestic construction markets. In this paper suggests some improvement methods and operational problems caused from application of an open forum type for selecting contractor of turnkey project.
Keywords
Design build; Turnkey contract; Alternative-design contract; Design deliberation procedure; Technical committee; Appraisal committee;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 The Ministry of Land, Transport and Maritime Affairs(2010. revision) Business Tips of urnkey and Alternative-Design Contracts. Technical Safety Officer.
2 Public Procurement Service (1997) Construction Eligible Audit Guideline.
3 A.L Sinan, Fouad Mansoor (1986) valuation of Construction Management Contracts in Developing Contries, Ph.D Purdue Univ.
4 cheon Lyeong (2010) Construction Economics, Public Procurement Service.
5 K.R. Molenaar (1999) Public-Sector Design/Build Evolution and Performance, Journal of Management in Engineering, Vol. 15, No. 2, pp. 54-62.   DOI   ScienceOn
6 The Ministry of Land, Bid Method Review Criteria of Ministry of Land Notice No. 2009-1237 Large Construction etc.
7 S.H. Lee (2004) Correlation relationship of public construction bid rate and Profitability, The Ministry of Land, Transport and Maritime Affairs, pp. 50-57.
8 The Ministry of Land, Transport and Maritime Affairs(2009.12 revision) Construction technology development and management regarding operating rules.
9 Adrian, James J. (1981) The Construction Management Process, Reston Publihing Co. Inc.
10 The Ministry of Land, Transport and Maritime Affairs(2010. revision) Eligible to bid review and evaluation plan designed batch, Technical Safety Officer.
11 The Ministry of Land, Transport and Maritime Affairs(2010. revision) Eligible to bid review and evaluation plan designed batch, Technical Safety Officer.
12 S.H. Kim (2004) Performance Analysis of Turnkey and Alternative- Design Construction through Survey, Korea Institute of Construction Engineering and Management Regular Conference Journal, pp. 462-467.
13 Y.K. Lee, L.S. Kang, C.H. Kim (2007) Improvement of Bidding Procedure and Design Review System of Turnkey and Alternative-design Contracts, Journal of the Korea Society of Civil Engineers, pp. 491-497.
14 Y.K. Lee, L.S. Kang, S.C. Jeon, J.H. Park (2005) Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects, Journal of the Korean Society for Railway, Vol. 8, No. 5, pp. 460-469.