• Title/Summary/Keyword: 업무 프로세스 모델

Search Result 319, Processing Time 0.026 seconds

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

Analysis of a Repair Processes Using a Process Mining Tool (프로세스 마이닝 기법을 활용한 고장 수리 프로세스 분석)

  • Choi, Sang Hyun;Han, Kwan Hee;Lim, Gun Hoon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.4
    • /
    • pp.399-406
    • /
    • 2013
  • Recently, studies about process mining for creating and analyzing business process models from log data have received much attention from BPM (Business Process Management) researchers. Process mining is a kind of method that extracts meaningful information and hidden rules from the event log of enterprise information systems such as ERP and BPM. In this paper, repair processes of electronic devices are analyzed using ProM which is a process mining tool. And based on the analysis of repair processes, the method for finding major failure patterns is proposed by multi-dimensional data analysis beyond simple statistics. By using the proposed method, the reliability of electronic device can be increased by providing the identified failure patterns to design team.

Construction Process Modelling Method Improving the Traceability of ICT Applications (ICT 적용 추적성 개선을 위한 시공관리 프로세스 모델링)

  • Go, Taeyong;Lim, Taekyung;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.114-123
    • /
    • 2019
  • Tracking ICT applications on construction business processes is critical to the success of ICT-applied construction projects. Existing IDEF0 is a representative modeling method for visualizing and analyzing business processes. It defines a construction production process into a visual information model, hence, encouraging the project participant to understand the activities, their deliverable, and control flow of the process. However, IDEF0 dose not lend itself to ICT-applied construction processes, because it does not provide a mean to define how, in what order, by which each and every activity that ICT applied implements. This paper presents a new business modeling method that improves the traceability of ICT application (IAMB: ICT Application tracking Model for Business process) for construction management. The IAMB contributes to handle the sophisticated features of construction management processes to which ICT are applied. The method categorizes the process into three types: management, construction, and information exchange. The validity of IAMB was confirmed by analyzing the performance when it is used for tracking each modeling step of lift reservation process which making use of ICT. The test case provides an admissible evidence that the method encourage to define who, what, how, which order, and by which ICT tools the construction process exchanges production information.

Realization of Solution Based on .NET Optimized in Enterprise Environment (기업 환경에 최적화된 닷넷 기반 솔루션 구현)

  • Wang Jung-Hwe
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2006.06c
    • /
    • pp.238-240
    • /
    • 2006
  • 현대 기업에서는 다양하고 복잡한 업무 프로세스가 일반화 되어있고, 그에 따라 동일한 작업을 여러 장비 즉, PC, 노트북. PDA등 다양한 장비에서 하기를 원하는 사용자들의 요구가 늘어가는 추세이다. 하지만 대부분의 기업에서도 동일한 업무 프로세스를 유지보수나 재개발 하는데 있어서 많은 시간과 비용이 투자되어온 것이 사실이다. 본 논문에서는 이 같은 문제의 해결방안으로 최근 기술인 닷넷 아키텍처를 기반으로 연구된 자료를 토대로 기업 환경에 맞는 재사용성을 강조한 클래스를 구현하고 기존에 대부분의 기업에서 구현되고 있는 데 이터계층, 비즈니스 계층, 유저인터페이스 접근계층으로 분류되는 3-Tier계층 모델에서 한 단계 진보한 닷넷 아키텍처를 응용한 새로운 기업환견에 맞는 닷넷 솔루션 모델을 제시함으로써 닷넷 슬루션의 성능과 팀 개발 업무에서의 비용과 시간을 개선시킬 수 있다는 것을 증명한다.

  • PDF

2-Level Business Process Family Model for RFID-enabled Applications (RFID 애플리케이션을 위한 2-레벨 비즈니스 프로세스 패밀리 모델)

  • Moon, Mikyeong
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.05a
    • /
    • pp.422-425
    • /
    • 2009
  • RFID (Radio Frequency IDentificaiton)는 태그, 레이블, 카드 등에 저장된 데이터를 무선 주파수를 이용하여 리더에서 자동 인식하는 기술이다. RFID 애플리케이션은 RFID 태그의 실시간 정보를 기반으로 하는 업무 프로세스를 의미하는 것으로, RFID 정보를 이용하기 위해서는 기존의 비즈니스 프로세스가 변형되어져야 한다. RFID 미들웨어로부터 발생하는 저수준의 RFID 이벤트를 다양한 정보 서버들을 참조하여 고수준의 이벤트로 변환시키기 위한 일련의 활동(activity)들을 대부분의 RFID 애플리케이션에서 공통으로 수행하기 때문에 이러한 활동들을 재사용 될 수 있는 핵심자산으로 만들어놓을 필요가 있다. 본 논문에서는 다양한 유형의 RFID 애플리케이션에 재사용될 수 있는 RFID 관련 활동들을 RFID 제네릭 (generic) 활동으로 구분하고 이를 이용하여 2-레벨의 비즈니스 프로세스 패밀리 모델 (Business Process Family Model: BPFM)을 구축하는 방법을 제시한다. 상위 레벨의 RFID 제네릭 액티비티들은 두번에 걸쳐 가변치가 결정될 수 있는 가변점을 가지게 된다. 하위 레벨을 구성하는 도메인 활동들은 그 자체의 가변속성 뿐만 아니라 활동의 흐름에서 나타나는 다양한 형태의 가변요소들을 표현하게 된다. 이러한 2-레벨 BPFM을 이용함으로써 RFID 시스템 도입 시 처리해야 하는 활동들의 개발 양을 현저히 줄일 수 있다.

  • PDF

Pattern-based Analysis of Ubiquitous Process Design Based on Active Rules (능동형 규칙 기반 유비쿼터스 프로세스 설계의 워크플로우 패턴 분석)

  • Jung, Jae-Yoon;Park, Jong-Hun
    • The Journal of Society for e-Business Studies
    • /
    • v.14 no.1
    • /
    • pp.35-56
    • /
    • 2009
  • Many process modeling techniques, such as Petri-net, UML Activity Diagram, and EPC, are used to design process models. In this paper, we analyze ubiquitous process design based on workflow patterns. In particular, we focus on process design using active rules that have the form of Event-Condition-Action, and deal with the WS-ECA language, which was devised for ubiquitous web services coordination. We first check whether workflow patterns can be designed with ECA rules, and we then provide WS-ECA representations for ECA rules of the patterns. The contribution of this paper is that ECA rule-based process models were presented based on workflow patterns and they can be a guideline for ubiquitous process modeling.

  • PDF

A Modeling of Web-service for Construction CALS/EC Standard Guideline by using Component Based Development (컴포넌트 기반 개발방법론에 의한 건설 CALS/EC 표준지침 웹서비스의 모델링)

  • 이상호;정용환;김소운
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.78-83
    • /
    • 2003
  • 본 연구에서는 건설CALS/EC 기반의 정보화 추진을 위한 정보시스템을 개발할 때 적용되는 기존의 소프트웨어 개발방법론의 문제점을 분석하고, 표준화되지 않은 개발방법론의 적용으로 시스템 개발에 비효율적인 비용을 투자하는 문제점과 특성상 입찰, 구매, 계약 등 분야별로 상이한 기능의 업무에 따라 구축되는 건설산업 정보화에 있어서 상호간에 데이터 및 프로세스를 원활히 통합하지 못하므로 인하여 발생되는 개발의 중복성, 정보 활용의 비효율성 등의 문제점을 개선하고자 하였다. 이를 위하여 최근 새로이 부각되고 있는 방법론인 컴포넌트 기반 개발방법론(CBD: Component-Based Development)을 사용하여 건선CALS/EC 표준지침 웹서비스를 위한 시스템의 업무프로세스를 모델링하여 사용자가 쉽게 재사용가능하고 타업무분야에 확대 가능한 방향을 제시하였다. 본 연구를 위하여 기존의 소프트웨어 개발 방법론의 적용상 문제점 분석을 통하여 컴포넌트 기반 개발방법론의 필요성을 증명하고 비즈니스 컴포넌트 프레임워크를 사용하여 건설 CALS/EC 표준지침 웹서비스의 업무프로세스에 적용할 기술적인 방법론을 고찰하고 업무에 효과적으로 적용할 수 있는 업무프로세스 컴포넌트를 제시하였다. 본 연구에서 도출된 컴포넌트 모델은 향후 타업무분야의 시스템을 개발할 때 사용자요구분석 단계부터 별도의 재 작업이 없이 사용될 수 있으며 시스템을 구현할 때 개발 모듈의 중복방지와 용이한 비즈니스로직의 변경 등이 가능하며, 추가의 업무 프로세스나 연관된 다른 분야의 업무프로세스의 반영 및 추가 시 컴포넌트의 활동모델을 쉽게 수정하여 정의함으로써 쉽게 시스템의 기능을 확장할 수 있다.LE 산정에 관한 지속적인 실험적 연구가 이루어져야 하겠다. 증가할 것이다. 또한 부분육을 이용한 완전제품, 적색육제품, 유기농이나 별미식 제품과 같은 형태의 다양한 포장육 제품이 도입 될 것으로 생각되어진다.e in vitro SPF test method will be able to be used as an alternative method for in vivo SPF in case of lotion and cream. replica. A statistically significant improvement of Star Fruit Leaf Extract BG30-treated site was seen in decreased wrinkles. Star Fruit Leaf Extract BG30 results in clinically visible improvement in wrinkling when used topically for 5 weeks. 또한 관계마케팅, CRM 등의 이론적 배경이 되고 있는 신뢰와 결속의 중요성이 재확인하는 결과도 의의라고 할 수 있다. 그리고 신뢰는 양사 간의 상호관계에서 조성될 수 있는 특성을 가진 반면, 결속은 계약관계 초기단계에서 성문화하고 규정화 할 수 있는 변수의 성격이 강하다고 할 수가 있다. 본 연구는 복잡한 기업간 관계를 지나치게 협력적 측면에서만 규명했기 때문에 많은 측면을 간과할 가능성이 있다. 또한 방법론적으로 일방향의 시각만을 고려했고, 횡단적 조사를 통하고 국내의 한 서비스제공업체와 관련이 있는 컨텐츠 공급파트너만의 시각을 검증했기 때문에 해석에서 유의할 필요가 있다. 또한 타당성확보 노력을 기하였지만 측정도구

  • PDF

Design and Implementation of Process Management Model applying Agent Technology (에이전트를 적용한 프로세스 관리 모델 설계 및 구현)

  • Kim, Jeong-Ah;Choi, Seung-Yong;Bae, Je-Min
    • Journal of Internet Computing and Services
    • /
    • v.7 no.6
    • /
    • pp.21-40
    • /
    • 2006
  • As the knowledge-based society hot been constructed, the size of work process that has to be done grows big and the amount of the information that has to be analyzed increases. In the paper business process can be accurately executed by the rule agent to manage precise rules and definitions to be needed by execution of process for management of business process. And individuals con accurately measure and manage personal schedules to execute process through supporting the agent of schedule management. The model is designed and implemented for organization to improve process of control, flexibleness, agility, reliability, and reuse through business process automation and removing process overlapping and for personal to improve measuring personal process capacity and distinguishing process weak points.

  • PDF

BIM based Design of Steel Box Girder (STEEL BOX 교량 상부구조의 BIM기반 설계)

  • Lee, Jin-Kyoung;Lee, Heon-Min;You, Jae-Myoung;Shin, Hyun-Mock
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.6-11
    • /
    • 2011
  • In domestic construction industry, there is lack of the communication between planning, design, construction and maintenance. This problem makes the omission of information and the loss of cost. Therefore, the introduction of BIM can be a solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the design process of steel box bridge for structural design work of bridge construction project based on BIM. This process has 3D modeling progress done by using the information decided in design phase. When the subject for the proposed process is superstructure of steel box bridge in construction, the structural calculation sheet can be derived with the structural design process based on BIM.

Working Design Management of the Design Build Projects Using CBR (CBR(Case-Based Reasoning)을 활용한 턴키 공사 실시설계관리 방안)

  • Park Se-Kun;Kim Young-Jae;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.432-437
    • /
    • 2002
  • As the working design process of Turn-Key projects is a basic process for the final contract, this process has lots of business decision to be made. Because such results of business decision can be the basis on contract documents, it is the step which needs a through management for Turn-key project. But in case of domestic construction companies, because those are not organized process of working design process, project manager has had lots of trouble at each process to make the business decision. As a means of settling the problems, this research is initiated. First, working decision management process is identified and generalized by interviews with project managers. Second, cases that actually happened in the project are investigated and categorized. Third, response plan to solve the problems and check lists to prevent the problems are suggested. Finally, the process, cases, response plan, and check list are integrated using CBR for future reuse.

  • PDF