Browse > Article
http://dx.doi.org/10.6106/KJCEM.2019.20.1.114

Construction Process Modelling Method Improving the Traceability of ICT Applications  

Go, Taeyong (Intelligent Construction Automation Center, Kyungpook National University)
Lim, Taekyung (Intelligent Construction Automation Center, Kyungpook National University)
Lee, Dong-Eun (Sch. of Arch & Civil Engrg, Kyungpook National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.20, no.1, 2019 , pp. 114-123 More about this Journal
Abstract
Tracking ICT applications on construction business processes is critical to the success of ICT-applied construction projects. Existing IDEF0 is a representative modeling method for visualizing and analyzing business processes. It defines a construction production process into a visual information model, hence, encouraging the project participant to understand the activities, their deliverable, and control flow of the process. However, IDEF0 dose not lend itself to ICT-applied construction processes, because it does not provide a mean to define how, in what order, by which each and every activity that ICT applied implements. This paper presents a new business modeling method that improves the traceability of ICT application (IAMB: ICT Application tracking Model for Business process) for construction management. The IAMB contributes to handle the sophisticated features of construction management processes to which ICT are applied. The method categorizes the process into three types: management, construction, and information exchange. The validity of IAMB was confirmed by analyzing the performance when it is used for tracking each modeling step of lift reservation process which making use of ICT. The test case provides an admissible evidence that the method encourage to define who, what, how, which order, and by which ICT tools the construction process exchanges production information.
Keywords
ICT; Business Process Model; Construction Process; ICT Application Tracking Model;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Go, T. Y., and Yashiro, T. (2011). "A study on understanding the impact by introduction the information technology tools." Summaries of technical papers of Annual Meeting AIJ, AIJ, pp. 1301-1302.
2 Go, T. Y. (2015). "Study on evaluation of IT application impact in construction management / implementation process." Thesis of doctoral, University of Tokyo.
3 Hamada, K., Suzuki, M., Kaneko, T., Omoto, E., Doi, S., Takizawa, H., and Kashiwa, T. (2013). "Rationalization of Logistics for Super High-rise Building : Outline of Project and Control System for Construction Elevator." Summaries of technical papers of annual meeting 2013, AIJ, pp. 1281-1282.
4 Jo, J. H., and Kwak, M. S. (2008). "Development of the Field Management System By Using PDA In Apartment Construction." Review of Architecture and Building Science, AIK, 52(5), pp. 83-86.
5 Jung, S. W., Woo, H. S., Yoon, S. H., Moon, H. C., and Kim, C. H. (1998). "A Study on Dynamic IDEF0 Methodology." Proceeding of KIOIE 1998 Spring Conference, KIOIE, pp. 614-618.
6 Kanba, K., and Watanabe, K. (2009). "Development of Collision Prevention System (Alarm System) of Crawler Crane Using GPS." Construction machinery and equipment, 45(9), pp. 33-35.
7 Kazuki, H., Handa, M., Mizukami, O., and Nakashima, T. (2006). "Development of Building Site System of Administration with Personal Digital Assistants : Development of Reinforcement Quality Inspection System." Summaries of technical papers of annual meeting 2013, AIJ, pp. 827-828.
8 Kim, J. I. (1996). "IDEF0 Models of the FCIM system for CALS Implementation." The Jounal of Society for e-Business Studies, Society for e-Business Studies, 1(2), pp. 117-131.
9 Lee, H. S., Lee, K. P., Park, M. S., Kim, H. S., and Lee, S. B. (2009). "A Construction safety management system based on Building Information Modeling and Real-time Locating System." Korean Journal of Construction Engineering and Management, KICEM, 10(6), pp. 135-145.
10 Kim, J. S., Chin, S. Y., and Yoon, S. W. (2014). "A Study on the Applicability of Character Recognition Technology for Construction Supply Chain Management of Structural Steel Components and Precast Concrete Works." Korean Journal of Construction Engineering and Management, KICEM, 15(4), pp. 20-29.   DOI
11 Lee, S. H., and Ryu, K. Y. (2009). "c-IDEF*:A comprehensive modeling methodology for collaborative processes of manufactures" Proceeding of KORMS 2009 Fall Conference, KORMS, pp. 1441-1448.
12 Yoon, S. W., Song, J. H., Shin, T. H., and Chin, S. Y. (2010). "A Gate Sensor for Effective and Efficient Entering / Taking Management of Vehicles for Construction Logistics." Korean Journal of Construction Engineering and Management, KICEM, 12(1), pp. 85-96.   DOI
13 Oh, S. W., Kim, Y. S., Lee, J. B., and Kim, H. S. (2004). "Collection and Utilization of the Construction Labor Information Using PDA and Barcode." Korean Journal of Construction Engineering and Management, KICEM, 5(5), pp. 65-75.
14 Ross, D. T. (1977). "Structured Analysis(SA):A Language for Communicating Ideas," IEEE Transactions on Software Engineering, 3(1), pp 16-34.   DOI
15 Yim, D. S., Kim, C. H., Woo, H. S., and Kim, J. I. (1998). "Integration od Business Process Modeling Methodologies : IDEF0, IDEF3, and Petri Net." The Jounal of Society for e-Business Studies, Society for e-Business Studies, 3(2), pp. 141-160.
16 Choi, Y. G., Yoon, S. W., and Chin, S. Y. (2011). "Integrated Manpower Information Systems on Construction Site - Using RFID and QR-Code." Korean Journal of Construction Engineering and Management, KICEM, 12(4), pp. 106-116.   DOI