Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.355-356
/
2023
The ripple effect is analyzed in the post-construction evaluation phase, but only the qualitative analysis and simple numerical fluctuations are analyzed, thus, no reliable ripple-effect analysis has been conducted. Therefore, in this study, a focus group interview was conducted with 10 experts to propose a plan to improve the ripple effect metrics. Consequently, by linking with the policy-effect metrics of the pre-feasibility study, it is expected that the utilization of the analysis results will be improved and objective and quantitative analysis will be possible.
The Ministry of Environment in Korea has been promoting the urban stream restoration project for paved streams in cities as the restored Cheonggyecheon. As an elementary study for suggesting policy implications for the project, cost and benefit criteria for an ex-post analysis on the Cheonggyecheon project is suggested in this study. The ex-ante analysis were reviewed critically by focusing on the cost and benefit criteria. Ex-post analysis plan in this study is developed considering the standard guideline of pre-feasibility, the theory of cost-benefit analysis, and the review results. The costs for compensating lands, amending conflicts, researching rivers, and maintaining water quantity were also included. For the benefits, this study proposes to estimate the benefits with the assessment on naturalness of stream. The results are expected to contribute to increase the efficiency of the urban stream restoration project and evaluate the project to match better with the meaning of the river restoration.
Korean Journal of Construction Engineering and Management
/
v.14
no.6
/
pp.78-89
/
2013
Post-evaluation system reflects the results of performing a public construction project in the future similar public construction projects to be utilized in the planning. However, the current system simply compares the expected values, such as demand, B/C ratio, cost of construction, construction period, with the actual values after the completion of construction. In addition, most public owner does not actively conduct the post-construction evaluation tasks, so that the evaluation results has not been returned to early stage of a construction project. In this study, status of the post-construction evaluation system is investigated by a survey of the public owner and the construction project evaluation system of the United States and Japan was analyzed. This paper presents the improvement scheme of utilization of the results of the post-construction evaluation system. Through improving the post-construction evaluation system, it is expected that public agencies would easily utilize the post-construction evaluation.
The Environmental Impact Assessment(EIA) follow-up is integral phase of the EIA system. The EIA is complemented and completed by the EIA follow-up and the experience and data accumulated during the process contributes to the advancement of the EIA system. In Korea, institutional foundation of EIA is acknowledged as having been settled. Therefore, eyes are now on the qualitative growth of the EIA system including the normalization of the EIA follow-up management. In relevant prior studies there are many suggestions to make advancement of the EIA system. Nevertheless, it is difficult to apply the real system because most suggestions need prior preparation. Given the context, we propose a practical step-by-step strategies for the vitalization and advancement of the EIA follow-up system while recommending the direction for the development in this study.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.7
/
pp.648-655
/
2016
As the FTAs' implementations are accelerated, an Ex-post assessment, such as an analysis of the tariff schedule and agricultural trade has been emerging as an important national issue for an agricultural sector Korea-EU FTA, which was to be implemented in the five years from July 2016 as one of the giant FTA. The purpose of this study was to determine the demand of an ex-post assessment on agricultural sector as a trade negotiation procedural law. In addition, by providing policy direction for the agricultural policy part requiring amendments and supplements through ex-post assessment, the conflicting arguments between agricultural and non-agricultural sector can be evaluated more objectively. The current evaluation method on the economic impact ex-post assessment of a FTA is generally compared using the change in trade balance before and after the time of FTA implementation. On the other hand, this comparison cannot be said to be the pure FTA effects and objective, tightening economic impact assessment of the FTA in all combined situations, such as the effects of exchange rates and international macroeconomic changes and climate change & occurrence of pests. Over the last 4 years, however, Korea-EU FTA's total accumulated agricultural GDP loss was measured to be 2,178 billion by these research attempts with dynamic analysis as ex-post assessment methodology. The greatest impact was mainly livestock and pork followed by cereals and vegetables. In addition, this research is expected to contribute to policy evaluations in the future.
본 연구는 한국 미국 유럽의 ITS 사업평가방법론을 비교분석(Comparative Analysis)하여 과학적인 국내 ITS사업평가지침 도입방안을 제언하는 것이다. 이를 위해 우리나라의 ITS사업평가의 문제점 및 국외 선진평가방법론을 분석하고 시사점을 도출하여 국내 ITS평가지침을 제도화하기 위한 정책방향을 제언하였다. 국내 외 사례(미국 유럽 한국) 비교분석결과, 국내에서도 중 장기적인 ITS 투자재원의 효율적 배분과 단기적인 시스템운영의 효율화를 위해서 과학적인 ITS평가지침(ITS Evaluation Guideline)의 도입이 제도화되어야 한다. 또한 세부추진방안으로 ITS사업을 지속적이고 반복적으로 모니터링 할 수 있는 ITS사업평가체계의 도입, ITS 서비스의 효과척도(MOE)를 과학적으로 분석할 수 있는 평가기법(운영성능평가, 경제성평가, 사전 사후비교분석, 시뮬레이션분석)정립, ITS특성을 고려한 새로운 평가기법 도입(위험도분석, 행태분석, 시뮬레이션분석) 및 기타 정책적 활용을 위한 지원(평가자료의 데이터베이스화, 한국형 ITS평가용 시뮬레이터개발, ITS사업효과 계량화 등)방안이 필요한 것으로 나타났다.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.379-380
/
2023
The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.6
/
pp.801-809
/
2023
Road construction projects have a long duration so cost overruns and schedule delays are occurred. However, performance assessment system that can manage and prepare for this in advance is insufficient. In addition, road construction are affected by many factors during under construction. Therefore it is necessary to conduct performance assessment considering the characteristics of roads and prepare for similar projects in the future. The purpose of this study is to provide a framework to evaluate construction phase performance and present a performance management plan using road construction information. Also, This study conducted time adjustment between the start and the finish of the project and developed performance metrics based on absolute and relative indicator. This study analyzed the cost, schedule, and changes of the road project construction process, showing the possibility of advancement of performance assessment and how to use it when planning new road construction projects.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.523-526
/
2007
In Korea, the construction industry has been growing quantitatively because of its aggressive advances into overseas construction market and the Korean government's housing policy. Moreover, visions and goals such as 'construction industry promotion build up plan' have recently been promoted by the government while new strategic growth focused on competitiveness is gaining interests among the industry. However, there are a few problems in the construction performance. First, the specific performance measurement indicator or skills for the construction industry are hardly found in Korea. Currently, the finance or overall management system in the construction business are used as indicators to measure performances in not only the construction industry but all industries including the manufacturing industry. The government, the industry and universities recognized the need for the performance measurement indicator and skill and have developed and actively studied on them.
This study is to evaluate the public drinking water service systematically, to improve customer satisfaction level, also overcoming the limitations of the existing method often relying on the satisfaction measurement subjectively. Thorough the rigid quality control of the service and its effect on civil affairs administration, we conclude that quality of the public service has an influences on the customers' satisfaction, which play a role to intensify the confidence and support of the civil administration by its appropriate management. Thus quality control management itself has its own value in that the satisfaction and confidence of the service result from the quality. The new model can be utilized as a Service Quality Index for the public drinking water service. To enhance the customers' satisfaction and confidence of the water suppliers, it is very useful that they reflect the customers' needs exactly through the service quality control regularly.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.