Acknowledgement
This research was supported by National R&D Program through the National Research Foundation of Korea (NRF) funded by Ministry of Science and ICT (NRF-2020R1F1A1070612) and was also supported by Korea Institute for Advancement of Technology (KIAT) grant funded by the Korea Government (MOTIE) (P0008475).
References
- Al-Hazim, N. and Abusalem, Z. (2015). "Delay and cost overrun in road construction projects in Jordan." International Journal of Engineering & Technology, SPC, Vol. 4, No. 2, pp. 288-293, https://doi.org/10.14419/ijet.v4i2.4409.
- Ammar, T., Abdel-Monem, M. and El-Dash, K. (2022). "Risk factors causing cost overruns in road networks." Ain Shams Engineering Journal, Elsevier, Vol. 13, No. 5, 101720, https://doi.org/10.1016/j.asej.2022.101720.
- Anigbogu, N. A., Ahmad, Z. B. and Molwus, J. J. (2019). "Cost overruns on federal capital territory authority road construction projects." FUTY Journal of the Environment, AJOL, Vol. 13, No. 1, pp. 1-14.
- Choi, J. Y., Yun, S. M. and de Oliveira, D. P. (2016). "Developing a cost normalization framework for phase-based performance assessment of construction projects." Canadian Journal of Civil Engineering, Canadian Science Publishing, Vol. 43, No. 12, pp. 1075-1086, https://doi.org/10.1139/cjce-2016-0223.
- Dolage, D. A. R. and Dasantha, O. M. C. (2022). "Critical factors affecting cost overrun in foreign funded road construction projects in Sri Lanka: A Case Study of Road Development Authority and Provincial Road Development Authorities." Engineer, The Institution of Engineers, Sri Lanka, Vol. 55, No. 2, pp. 21-30, https://doi.org/10.4038/engineer.v55i2.7505.
- Gupta, M. D. (2018). Now, New Concept to Measure Length of Highways From April 1. Available at: https://www.hindustantimes. com/india-news/now-new-concept-to-measure-length-of-high ways-from-april-1/story-Q44qGgFzl4DsAPv5OIG0YI.html (Accessed: June 8, 2023).
- Herrera, R. F., Sanchez, O., Castaneda, K. and Porras, H. (2020). "Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis." Applied Sciences, MDPI, Vol. 10, No. 16, 5506, https://doi.org/10.3390/app10165506.
- Kaliba, C., Muya, M. and Mumba, K. (2009). "Cost escalation and schedule delays in road construction projects in Zambia." International Journal of Project Management, Elsevier, Vol. 27, No. 5, pp. 522-531, https://doi.org/10.1016/j.ijproman.2008.07.003.
- Kim, T. Y. and Park, H. S. (2016). "Effective analysis framework for construction post evaluation." KSCE Journal of Civil and Environmental Engineering Research, KSCE, Vol. 36, No. 6, pp. 1145-1152, https://doi.org/10.12652/Ksce.2016.36.6.1145 (in Korean).
- Korea Institute of Civil Engineering and Building Technology (KICT). (2012). A Study on the Improvement of Post Evaluation Scheme for Construction Projects (in Korean).
- Korea Institute of Civil Engineering and Building Technology (KICT). (2020). A Trend of Performance Assessment System of Construction Projects (in Korean).
- Korea Institute of Civil Engineering and Building Technology (KICT). (2022). Construction Cost Indieces (in Korean). Available at: https://cost.kict.re.kr/#/notice/file/detail/34178;page=0;category=index (Accessed: February 2, 2023).
- Korea Research Institute for Human Settlements (KRIHS). (2011). Efficient Application of Post Evaluation Scheme for Road Projects (in Korean).
- Korea Research Institute for Human Settlements (KRIHS). (2013). A Study on the Utilization Guidelines for Post Evaluation of Road Projects (in Korean).
- Kurniawan, D. and Abd Majid, M. Z. (2022). "Critical risk factor affecting cost overrun in highway project of west sumatera." Proceedings of IOP Conference Series: Earth and Environmental Science, Vol. 1022, 012013, https://doi.org/10.1088/1755-1315/1022/1/012013.
- Midwest Economic Policy Institute (MEPI). (2018). A Comparison of Highway Construction Costs in the Midwest and Nationally.
- Ministry of Land Infrastructure and Transport (MOLIT). (2022). A manual of road operations (in Korea). Available at: http://www.molit.go.kr/USR/policyData/m_34681/dtl.jsp?search=&srch_dept_nm=&srch_dept_id=&srch_usr_nm=&srch_usr_titl=Y&srch_usr_ctnt=&search_regdate_s=&search_regdate_e=&psize=10&s_category=&p_category=&lcmspage=1&id=4632 (Accessed: April 17, 2023).
- Ok, H. and Yang, S. H. (2014). "Development of the construction post-evaluation system in public construction projects." Journal of the Korea Academia-Industrial Cooperation Society, KAIS, Vol. 15, No. 12, pp. 7364-7371, https://doi.org/10.5762/KAIS.2014.15.12.7364 (in Korean).
- Whaley III, D. L. (2005). The interquartile range: Theory and estimation, Msc. Thesis. East Tennessee State University.
- Yun, S. M., Choi, J. Y., de Oliveira, D. P., Mulva, S. P. and Kang, Y. C. (2016). "Measuring project management inputs throughout capital project delivery." International Journal of Project Management, Elsevier, Vol. 34, No. 7, pp. 1167-1182, https://doi.org/10.1016/j.ijproman.2016.06.004.