• Title/Summary/Keyword: 보수공사

Search Result 399, Processing Time 0.025 seconds

Analysis of Major Factors of Window Work in Construction Phase Considering Recurrence of Defects in the Maintenance Phase (유지관리단계의 하자 재발생을 고려한 창호공사 시공단계의 중점관리요소 분석)

  • Jeong, U Jin;Kim, Dae Young;Lim, Jeeyoung;Park, Hyun Jung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.653-664
    • /
    • 2021
  • As the construction standards for energy-saving eco-friendly housing have recently been strengthened, the proportion of window work has increased with the demand for high-efficiency housing. Windows have high frequency of use, and there is the potential for many defects to occur depending on the characteristics of construction. According to a government agency's survey of defects in public rental apartment housing, defects in the windows work accounted for the highest portion of complaints received. Accordingly, related previous studies were considered, and it was found that the existing studies in Korea lacked research that reflected the construction characteristics of window work and the importance of maintenance. In addition, existing overseas studies considered both the constructor and the resident's position, considering the cost aspect together, and showed a trend of structuring the relationship between defects and causes. Therefore, this study will analyze the causes of defects that can occur in the construction phase of the windows work, reflect the construction characteristics, and derive major factors that consider the importance of maintenance based on the possibility of recurrence after repairing defects. Ultimately, this research will contribute to preventing defects in the construction phase and reducing maintenance costs by presenting a highly effective defect management plan through selecting the major factors for each defect type that can be intuitively judged by analyzing the causal relationship between defect types and causes.

Permeation Grouting Effect for Repair and Reinforcement of Old Dam (노후댐 보수보강을 위한 침투그라우팅 효과 분석)

  • LEE, Dong-Beom;Lim, Heui-Dae;Song, Young-Su
    • The Journal of Engineering Geology
    • /
    • v.28 no.2
    • /
    • pp.277-295
    • /
    • 2018
  • As it has become difficult to secure new water resources through dam construction due to the critical social public opinions on dam construction from 10 years ago, it is necessary to review the existing water resources through the review of existing dams. Accordingly, access methods, such as planning, construction and management, were carried out using technologies already accumulated in relation to the repair and reinforcement of the dam. As a result of the repair and reinforcement, permeation grouting has been performed in many dams, but the establishment of the technology is insufficient so far, and the published paper at home and abroad is extremely rare. In this thesis, low-pressure penetration and grouting reinforcement technologies for the YC dam are analyzed in detail. As a result, penetration grouting has shown that it can be effectively applied to the improvement in the constallability of the core fill-like a YC dam. In addition, the technical details of the experience-proven penetration grouting are given in relation to the injection criteria. It is deemed that the specific analysis data of the Fill Dam penetration grouting technology through this study can be used as useful data for strengthening the repair of Fill Dam and reservoir.

Analysis of Importance by Defect Type in Apartment Construction (공동주택 건축공사 하자유형별 중요도 분석)

  • Kim, Do-Hyung;Lee, Dongyoun;Lee, Hak-Ju;Min, Yoon-Gi;Park, Insung;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.357-365
    • /
    • 2020
  • While numbers of apartment housing are continually rising in the domestic housing construction industry, apartment contractors are currently developing plane models, upgrading facilities, and relevant technology, and investing much efforts to meet the higher demands of consumers. However, the construction process of apartment housing involves the intricate properties of the construction industry such as materials, workforce, equipment, weather, and unpredictable situations. If any of these factors becomes discordant and results in interference and interruption of the construction process, then defects, both functional and aesthetic, are likely to occur due to errors in the plan of industry organizers and constructors. Therefore, this research identifies the types of defects in an apartment construction project and analyzes their relative importance. Firstly, this research reviews the previous research trends and will reduce the needs of this research. Afterward, defect repair costs corresponding to the different defect types are calculated by applying results of the research and performing frequency analysis on defect types included in 'Tenant preliminary research' on apartments constructed by Company A. As a result of analyzing the importance of defect type, the top six activities, including tile, floor, paper hanging, PL window, cabinetry, and kitchen cabinet, are found to be of high importance, and the top six activities in question need of repair and management of defects first. The results of this study will help establish a plan to initially respond to such problems as refusal to move in and filing a defect suit against delay in repairing defects.

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.

Design and Construction of the Green Wall System considering Distribution Effect of Earth Pressure by Soil Nail (쏘일네일의 토압분담효과를 고려한 그린월 시스템의 설계 및 시공)

  • Park, Si-Sam;Cho, Sung-Han
    • Journal of the Korean Geosynthetics Society
    • /
    • v.5 no.3
    • /
    • pp.1-7
    • /
    • 2006
  • The Green Wall system, developed in Austria early 1960, is one of segmental concrete crib type earth retaining wall. Green wall is constructed as procedures that lay the front stretchers, rear stretchers and headers then making a rigid body through harden filled soil of interior cell. Green wall has pro-environmental advantages that able to grow grass in front space of stretchers and decrease cutting ground. In Europe, Green wall used without other reinforcement method. However, green wall used with other reinforcement method like a soil nailing because of environmental problem. This study was performed to introduce the design case by 'Two-Body Translation mechanism' to be able to consider distribution of earth pressure in the soil nailing when designing the green wall using soil nailing system. Also, this study attempts to evaluate the earth pressure change when advanced soil nailing system is constructed using $FLAC^{2D}$ ver. 3.30 program and 'Two-Body Translation mechanism'.

  • PDF

A Study on the Application of Supply Chain Management in Curtain Wall Engineering (커튼월 공사에서의 공급사슬관리 적용에 관한 연구)

  • Park Sang-Woo;Park Sang-Jun;Kwon Won;Kim Chang-Duk;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.301-304
    • /
    • 2004
  • The curtain wall engineering of local high-rise buildings consists of many phases such as design, curtain wail design, manufacture, procurement, construction and facility management, each of which also involves many' actors such as architect, curtain wall consultants, manufacturers, contractors, and facility managers. Moreover, the method for controlling the C/W process of each participant is needed. Eliminating wastes and problems existed in the C/W process can be more effective. What is more, it is necessary to improve the efficiency of the current process and to strengthen the competence through application of SCM to the C/W life-cycle. In addition, it is important that a ]ot of information transfer smoothly and share through information system. Therefore, this study aimed to propose the scope of application and the improvement directions in applying Supply Chain Management concept.

  • PDF

The Evaluation of GHG Emissions in Railroad Construction Sector (철도건설의 온실가스 배출량 산정평가)

  • Lee, Jae-Young;Jung, Woo-Sung;Hwang, In-Hwan;Kim, Yong-Ki
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.271-275
    • /
    • 2011
  • According to governmental policies for green growth, the increase in the traffic volume of railroad is a representative method to reduce total greenhouse gas (GHG) emitted from transport. Comprehensive assessment for the GHG emission of railroad has been studied to compare the difference of transport modes just in the operating step excluded the construction step. The purpose of this study was to evaluate GHG emissions in railroad construction sector. The targets were some construction works for civil, track, building, and electric system in A line. The GHG emission source of constructing railroad infrastructure was mainly the energy consumption of heavy equipments. As a result, the civil construction sector showed more than 96% of total GHG emissions and its specific GHG emission was 2.191 ton $CO_2e/m$. Also, the specific GHG emissions of civil construction works were of the order: earthworks > tunnels > bridges > station. In future, it will be required to calculate the overall GHG emission of railroad through life cycle approaches including operation, maintenance and disposal step.

An Experimental Study on Precast Bridge Piers Confined by FRP for Technical Development of Accelerated Construction (급속시공기술 개발을 위한 FRP로 보강된 프리캐스트 교각의 실험 연구)

  • Lee, Seung-Hye;Lee, Yeong-Ho;Hwang, Yoon-Koog;Song, Jae-Joon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.237-240
    • /
    • 2008
  • Today, some bridges or highways are becoming superannuated in Korea. Also, in this section, rehabilitation, replacement and expansion are necessary to increasing traffic volumes these days. Bridge reconstruction is major problem because it has relation to civil application, economical loss and loss of vehicles made a detour while this work. Many precast components and methods of construction are developed for this issue. Many research of various precast components and new materials are being performed owing to apply to prefabrication bridges. The present paper represents experimental studies on the performance of precast CFFT pier model. Also, stay-in-place RC pier and stay-in-place CFFT pier are made an experiment on due to comparing test results. Hysteretic responses of all columns are obtained through the test. Compared with the displacement ductility factors, conclusions of seismic performances can be made.

  • PDF

A Study for Analyzing Life Cycle Cost of Membrane Water-proofing of Roof - Focused on precaution for securing quality - (건축공사 옥상 도막방수 공법의 LCC 분석 - 품질확보를 위한 사전대책을 중심으로 -)

  • Bae, Jae-Wook;Shin, Seung-Moon;Kim, Sang-Gap;Koo, Choong-Wan;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.57-65
    • /
    • 2008
  • As the society is being developed, the desire about life quality is also growing. Even though the process of waterproof work has very close relation with these life quality, we always focus on management after problem than the precaution of problem. So this process has the highest rate of mengel. We develop LCC analysis model considering the precaution and try to show the necessity of the precaution by comparing and analyzing every alternative proposal during LCC. By studying of the previous work and the result of questionnaire, we deduce the problem of waterproof work in construction area. By discussion with an expert in this process and research, we make solutions about precaution and set the cost items in every alternative proposal about these solutions. We understand the effect of each elements through sensitive analysis of the cost items, and find the economically best suited solution.

Evaluation on Flexural Strength and Shear Strength of RC Beams Extracted from Existing Apartment Housings (기존 공동주택에서 채취한 보의 휨 내력 및 전단내력 평가)

  • You, Young-Chan;Shin, Hyun-Seop;Choi, Ki-Sun;Lim, Byung-Ho;Kim, Keung-Hwan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.3
    • /
    • pp.75-82
    • /
    • 2010
  • The static strengths of the existing RC beams were experimentally investigated in this paper to understand the strength characteristics of existing structural members and to get appropriate data in strengthening RC members in the remodelling construction. Ten RC beams were prepared by cutting and extracting directly from the demolition site of apartment housings and tested in order to evaluate the flexural and shear strengths of existing RC beams by their geometric condition. From the test results, it was found that most of the specimens had a sufficient structural capacity except for some special case, for example, specimens with severe cracks or concrete losses caused by improper casting. Therefore, the severely deteriorated members originated from bad concrete casting or careless construction process should be repaired and strengthened in remodelling construction.