1 |
Sun, L., and Zhou, J. (2005). "Development of multiregime speed-density relationships by cluster analysis." Transportation Research Record: Journal of the Transportation Research Board, 1934(07), pp. 64-71.
DOI
|
2 |
Sun, J. W., Park, K. H., Lee, M. j., and Park, C. W. (2011). "A Study on Development of Performance Measures for Level of Service(LOS) of Bridge Asset Management." Korean Journal of Construction Engineering and Management, KICEM, 12(2), pp. 101-110.
|
3 |
Sarasua, W., Davis, W., Clarke, D., Kottapally, j., and Mulukutla, P. (2004). "Evaluation of Interstate Highway Capacity for Short-Term Work Zone Lane Closures." Transportation Research Record: Journal of the Transportation Research Board, 1877(10), pp. 85-94.
DOI
|
4 |
Park, K. H., Sun, J. W., Lee, S. Y., Lee, J. S., and Cho, H. N. (2007). "Practical Model to Estimate Road User Cost for Bridge Maintenance Strategy." Journal of the Korea Institute for Structural Maintenance and Inspection, 11(6), pp. 131-142.
|
5 |
Park, K. H., Ryu, J. N., Chung, C. K., and Choung, Y. K. (2003). "Optimal Sewer Rehabilitation Planning Considering Transportation Disruption Cost." Journal of the Korean Society of Civil Engineers, 23(3), pp. 221-231.
|
6 |
Park, B. B., Pampati, D. M., and Balakrishna, R. (2006) . "Architecture for on-line deployment of DynaMIT in hampton roads, VA." Applications of Advanced Technology in Transportation. Proceedings of The Ninth International Conference, Chicago, Lllinois, USA.
|
7 |
Munoz, L., Sun, X., Sun, D., Gomes, G., and Horowitz, R. (2004). "Methodological calibration of the cell transmission model." Proceedings of the 2004 American Control Conference, Boston, Massachusetts, USA.
|
8 |
Ministry of Land, Infrastructure and Transport (2013). Korea Highway Capacity Manual 2013, MOLIT (in Korean).
|
9 |
Ministry of Land, Infrastructure and Transport (2013). A guidebook for investment of transportation facilities (5th edition), MOLIT (in Korean).
|
10 |
Memmott, J. L., and Dudek, C. L. (1984). "Queue and user cost evaluation of work zone (QUEWZ)." Transportation Research Record: Journal of the Transportation Research Board, 979, pp. 12-19.
|
11 |
Liu, C., (2010). "Temporal Stability of Macroscopic Traffic Stream Models." M.S. thesis, North Carolina State Univ., Raleigh, North Carolina, USA.
|
12 |
Lee, M. R., Kim, D. G., Kim, H. S., and Lee, C. W. (2013). "Capacity of Urban Freeway Work Zones." Journal of the Korean Society of Civil Engineers, 33(3), pp. 1123-1130.
DOI
|
13 |
Korea Institute of Construction Technology (2013). Final-Report of the National Highway Pavement Management System 2013, KICT (in Korean).
|
14 |
Kim, T. H., Lovell, D. J., and Paracha, J. (2001). "A New Methodology to Estimate Capacity for Freeway Work Zones." Transportation Research Board Annual Meeting, Washington D.C., U.S.A.
|
15 |
Jung, H. H., (2006). "Capacity drop on lane drop areas due to incidents: Focusing on seoul urban expressway." M.S. thesis, The Univ. of Seoul, Seoul, Korea.
|
16 |
Dudek, C. L., and Richards, S. H. (1982). "Traffic capacity through urban freeway work zones in Texas." Transportation Research Record: Journal of the Transportation Research Board, 869, pp. 14-18.
|
17 |
Hou, T., Mahmassani, H., Alfelor, R. M., Kim, J. W., and Saberi, M. (2013). "Calibration of traffic flow models under adverse weather and application in mesoscopic network simulation." Transportation Research Record: Journal of the Transportation Research Board, 2391(09), pp. 92-104.
DOI
|
18 |
Han, D. S., Do, M. S., Kim, S. H., and Kim, J. H. (2007). "Life Cycle Cost Analysis of Pavement Maintenance Standard Considering User and Socio-Environmental." Journal of the Korean Society of Civil Engineers, 27(6), pp. 727-740.
|
19 |
Han, D. S., and Do, M. S. (2013). "Development of Korea n Life Cycle Cost Analysis Model for Road Pavement Asset Management." Journal of the Korean Society of Civil Engineers, 33(4), pp. 1639-1650.
DOI
|
20 |
Do, M. S., Kwon, S. A., Lee, S. H, and Kim, Y. j. (2014 ). "Development of the Decision-Making System for National Highway Pavement Management." Journal of the Korean Society of Civil Engineers, 34(2), pp. 645-654.
DOI
|
21 |
An, J. M., Park, J. B., Lee, D. Y., and Lee, M. J. (2012). "A Study on Asset Valuation Method for Road Facilities Maintenance." Korean Journal of Construction Engineering and Management, KICEM, 13(4), pp. 141-151.
DOI
|
22 |
Al-Kaisy, A., and Hall, F. (2003). "Guidelines for Estimating Capacity at Freeway Reconstruction Zones." Journal of Transportation Engineering, 129(5), pp. 572-577.
DOI
|