Browse > Article
http://dx.doi.org/10.5345/JKIBC.2021.21.6.653

Analysis of Major Factors of Window Work in Construction Phase Considering Recurrence of Defects in the Maintenance Phase  

Jeong, U Jin (Department of Architectural Engineering, Pusan National University)
Kim, Dae Young (Department of Architectural Engineering, Pusan National University)
Lim, Jeeyoung (Department of Architectural Engineering, Pusan National University)
Park, Hyun Jung (Department of Architectural Engineering, Silla University)
Publication Information
Journal of the Korea Institute of Building Construction / v.21, no.6, 2021 , pp. 653-664 More about this Journal
Abstract
As the construction standards for energy-saving eco-friendly housing have recently been strengthened, the proportion of window work has increased with the demand for high-efficiency housing. Windows have high frequency of use, and there is the potential for many defects to occur depending on the characteristics of construction. According to a government agency's survey of defects in public rental apartment housing, defects in the windows work accounted for the highest portion of complaints received. Accordingly, related previous studies were considered, and it was found that the existing studies in Korea lacked research that reflected the construction characteristics of window work and the importance of maintenance. In addition, existing overseas studies considered both the constructor and the resident's position, considering the cost aspect together, and showed a trend of structuring the relationship between defects and causes. Therefore, this study will analyze the causes of defects that can occur in the construction phase of the windows work, reflect the construction characteristics, and derive major factors that consider the importance of maintenance based on the possibility of recurrence after repairing defects. Ultimately, this research will contribute to preventing defects in the construction phase and reducing maintenance costs by presenting a highly effective defect management plan through selecting the major factors for each defect type that can be intuitively judged by analyzing the causal relationship between defect types and causes.
Keywords
apartment; window work; defect analysis; defect type; defect cause; major factor;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Lim IH. A study on the analysis of major defect types and improvement methods of aluminum window and door construction [master's thesis]. [Daejeon (Korea)]: Chungnam National University; 2020. 51 p.
2 Lee GW. A study on countermeasure and analysis defect factor of constructionin apartment housing [master's thesis]. [Chuncheon (Korea)]: Kangwon National University; 2015. 112 p.
3 Pamera S, Gurmu A. Framework for building defects and their identification technologies: case studies of domestic buildings in Melbourne, Australia. The 54th International Conference of the Architectural Science Association. 2020 Nov 25-28; Auckland, New Zealand. Adelaide (Australia): Architectural Science Association (ANZAScA); 2021 p. 501-10.
4 Lee HH, Park SH, Lim JH, Song SY. Case study on the diagnosis and repair for window condensation problems in apartment building. Journal of the Architectural Institute of Korea Planning & Design. 2015 Apr;31(4):229-37. https://doi.org/10.5659/JAIK_PD.2015.31.4.229   DOI
5 Biel, Sebastian. Causes, Types and evaluation of the diminished value of components as a result of construction defects in housing. World of Real Estate Journal. 2019;109(3):23-38. https://doi.org/10.14659/worej.2019.109.02   DOI
6 Bae SI, Shin UJ, Ahn YS. The Study on the Selection of Primary Management Objects for Defect Prevention of Finishing Works on Apartment House. Journal of the Architectural Institute of Korea Planning & Design. 2013 Jun;15(3):179-86.
7 Moon SD, Chung JM, Ock JH. Analysis of the Causes of Defects in Fenestration Construction and Their Impacts on Construction Quality - Focused on Door Hardware -. Journal of the Korea Institute of Building Construction. 2013 Aug;13(4):341-50. https://doi.org/10.5345/JKIBC.2013.13.4.341   DOI
8 Kang JG, Yoon SH. A study on the cause and prevention of defects in apartment house through case studies. Journal of Next-generation Convergence Technology Association. 2019 Jun;3(2):76-87. https://doi.org/10.33097/JNCTA.2019.03.02.76   DOI
9 Lee DH, Shin UJ, Suh HS, Ahn YS. A study on the selection of primary management objects in life-cycle phases through analyzing the case of defect in constructing apartment house. Journal of the Architectural Institute of Korea Planning & Design. 2012 Jun;14(2):201-8.
10 Milion RN, Alves TDCL, Paliari JC, Liboni LHB. CBA-Based evaluation method of the impact of defects in residential buildings: assessing risks towards making sustainable decisions on continuous improvement activities. Sustainability. 2021 Jun;13(12):6597. https://doi.org/10.3390/su13126597   DOI
11 Zima K, Biel S. the concept of method of detecting and analyzing construction defects in residential buildings. Archives of Civil Engineering. 2019;65(4):81-95. https://doi.org/10.2478/ace-2019-0048   DOI
12 Lim SH. National audit correction and processing results evaluation report No. 25. Seoul (Korea): National Assembly Research Service; 2016 Sep. 40 p. Report No.: ISSN 2508-4240.
13 Shin JS. Defects in diferent phases of multi-unit dwelings' woden window works and improvement plans-Focusing on defects in phases of raw materials, production, execution of work and management before and after moving in- [master's thesis]. [Seoul (Korea)]: Chung-Ang University; 2017. 69 p.
14 Energy Saving Design Standards for Buildings [Internet]. Sejong: Ministry of Land, Infrastructure and Transport. 2008 - [cited 2021 Aug 24]. Available from: https://www.law.go.kr/
15 Korea Specialty contractors association. Statistical survey of professional construction industry. Seoul (Korea): Korea Specialty contractors association; 2019. 66 p.
16 Korea Land and Housing Corporation Construction Management Office. Construction Supervision Handbook. 1st ed. Seoul: construction books; c2013. Space construction 3, Window construction; p. 264-319.