• Title/Summary/Keyword: 노무생산성

Search Result 69, Processing Time 0.027 seconds

A Decision Making Support Model of Work Item-based Adaptation Strategy for RFID-based Construction Logistics and Progress Management (RFID 기반의 건설 물류 및 진도관리 통합체계를 위한 공종별 적용전략 의사결정모델)

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.3-15
    • /
    • 2009
  • As building construction projects have been more higher and bigger in scale, the needs for cost reduction, productivity improvement, and reducing of work terms have rapidly increased in recent years. There has been, accordingly, a great emphasis on the necessity of logistics and progress management by well-organized system developed based on the appliance of different management theories. Although highly developed IT technology has contributed to the efficiency and effectiveness in information research and project management, RFID has been merely applied to a single progress or a few types of materials in current management studies, not to the overall process of the projects. This research proposes a consistent and systemized approach for decision making in adopting RFID technology in a construction project to support construction logistics and progress management. With a decision making model that consists of process model and template developed in this research, risks in cost, time, and error in building RFID-based construction logistics and progress management could be minimized.

A Study on the Conceptual Design and Technical Feasibility Analysis for the Development of Automated Pavement Crack Sealer (도로면 크랙실링 자동화장비의 실용화를 위한 개념 디자인 및 기술적 타당성 분석에 관한 연구)

  • Lee, Won-Jae;An, Chi-Hoon;Yoo, Hyun-Seok;Lee, Jeong-Ho;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.103-116
    • /
    • 2011
  • Crack sealing is a maintenance technique commonly used to prevent water and debris penetration and reduce future degradation in pavement. In recent years, several systems for automatically routing and sealing pavement cracks have been developed in the highway construction and maintenance area. Automating pavement crack sealing can improve safety, productivity and quality, and reduce road user cost as well. The reduction in crew size and the increase in productivity of the automated sealing process will be translated directly into significant potential cost savings. The main objective of this study is to illustrate conceptual models for the development of the automated pavement crack sealer which meets domestic road condition and regulation, and to discuss its technical feasibilities. Conclusions are made concerning the applicability and the value of cantilever-typed pavement crack which is selected as the most feasible alternative in both economical and technical aspects.

A Development of the Automated Vertical Controllable Device for Improving Construction Performance of Pile Driver (파일드라이버 기계 시공성능 향상을 위한 연직 자동제어기의 개발)

  • Cho, Chang-Yeon;Lee, Jun-Bok;Son, Jae-Ho;Kim, Han-Soo;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.78-90
    • /
    • 2006
  • There is no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vertical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. The main objective of the research is to develop the automated vertical controllable prototype equipment for PHC piles in order to achieve uniform construction qualify as well as improving safety and productivity. The paper explains the literature review on PHC pile and pile installation process, development of prototype, field test of the prototype and its performance evaluation in terms of quality and safety as well as productivity. The results of the research will lead the further researches on the automated pile installation system.

Feasibility Study for Introducing Window Cleaning Device (유리창 청소작업의 자동화 장비 도입에 대한 타당성 분석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.612-618
    • /
    • 2020
  • In recent years, the demand for external window cleaning has increased, but the process is a very dangerous manpower-dependent operation. In addition, it is difficult to clean at the desired frequency in a business that values cleanliness. Therefore, there is a need to automate this work. This paper presents the concept of a device that can be attached to a specific window and clean the window continuously. The economic feasibility of this device was analyzed. The estimated manufacturing cost of the equipment was approximately 10 million won, but the possible investment cost was at least 9.8 million won for five years of endurance and 103 million won for 10 years of endurance. Therefore, the expected savings well exceed the equipment cost, and it was evaluated as having economic feasibility. Since this study analyzed only quantitative indicators, the expected cost reduction due to a reduction in safety accidents, productivity improvement, construction time reduction, and quality improvement was not considered. Therefore, it is expected that the calculated economic feasibility will be more accurate if the cost reduction effect by the automation equipment is calculated by adding the expected values not considered in this study.

A Study on the Work Crew Based for the Estimation from Construction Analysis of Cement Liquid Waterproofing in Apartment House (공동주택 시멘트 액체방수 공사의 현장분석을 통한 작업조 기반 품셈에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.121-128
    • /
    • 2010
  • This study aims to make improvements to the standard estimation process used to estimate reasonable costs for construction work, and to suggest a work crew based estimation using a new cost estimation model. In addition, work crew shift combination and construction process were systematically organized in order to improve the estimation technique and the construction capability of the cement liquid waterproofing work for apartment buildings. In addition, in terms of manpower and productivity, analyses were performed on the cement liquid waterproofing work for apartment buildings with net areas between $84-85m^2$ and $125-184m^2$, and the results were then compared with those calculated using the conventional work-crew based estimation method. Through this study, when the results of this study and those calculated by the conventional method were compared, for apartments with the net area of $84-85m^2$, the differences between specialists were shown to be 1.91 times to 2.13 times on average, while they were 8.82 times to 9.52 times between normal workers on average. For apartments with the net area of $125-184m^2$, the differences betweenspecialists were shownto be 1.89 times to 2.07 times on average, and 8.57 times to 9.38 times on average between normal workers.

Development of the Automated Vertical Controllable Pilot-type Equipment for Improving Construction Performance of PHC Piles (PHC 파일 시공성능향상을 위한 연직 자동제어 파일롯타입의 개발)

  • Cho Chang-Yeon;Lee Junbok;Kim Han-Soo;Kim Jeoung-Tae;Cho Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.72-80
    • /
    • 2004
  • The objective of the research is to develop the automated vertical controllable pilot-type equipment for PHC piles. The motivation for the research is that inherent problems related to vertical control during pile driving. The paper explains the current vertical control methods and problems, design and manufacturing of the pilot-type automated equipment and its testing and discussions of the results.

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.

The Development of the Manipulator and End-effector of Automated Pavement Crack Sealing Machine and Movement Test (도로면 크랙실링 자동화 장비의 모체 제작 및 구동 실험)

  • Lee, Jeong-Ho;Lee, Won-Jae;Yoo, Hyun-Seok;Kim, Young-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.377-386
    • /
    • 2012
  • Crack sealing has been widely used in the pavement maintenance due to its advantage of repairing the cracks at the preliminary stages. However, it has been analyzed that the crack sealing work process is dangerous and labor intensive. Moreover, quality and productivity of crack sealing work are highly depended on labor experience and skills. Therefore, various crack sealing machines have been researched but revealed many limitations in practical application. This research analyses conventional crack sealing work process and previously developed crack sealing machines in order to develop an automated pavement crack sealing machine which can be practically and widely applied in the construction fields. This paper develops the previously proposed conceptual design by drawing detailed designs and fabricating the hardware(manipulator and end-effector) of the automated pavement crack sealing machine. The crack sealing machine suggested in this paper overcomes limitations of existing crack sealing machines and designed to meet the domestic road conditions and regulations. It is expected that automating the conventional crack sealing method contributes to the improvement of quality, economy and reduce accidents.

Preliminary Study of Modulization Construction Method on Concrete Structure for High-rise Building (고층 콘크리트 구조물 모듈화 시공 시스템 기초연구)

  • Koh, Min-Hyeok;Cho, Chang-Yeon;Shin, Tae-Hong;Kwon, Soon-Wook;Kim, Yea-Sang;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.334-339
    • /
    • 2008
  • Construction that over 70% of the structure consists of concrete gets bigger and higher gradually and the demand of that is increasing as well. However, it's not easy to supply young and skilled persons on construction site because of social avoidance phenomena about 3D occupation, so it causes serious problems like aging and shortage of technicians. To solve the problems, executives related to the construction field make a management effort in various ways such as construction period shortening, labor productivity improvement and good quality but recently, they have an increasing interest in the necessity of the modularization of the high-rise building and the automation of the engineering development for the strengthening of international competitive power as more active and long-term alternatives. Therefore, this study is to propose the roadmap in order to make lots of efforts in developing construction technologies of high-rise buildings by performing a foundation study, the strategy for 4-step research development, on modularized construction system of concrete structure of high-rise buildings through domestic and foreign preceding research analyses associated with optimal design modularization technique, module factory automation and assembly automation of modularized objects.

  • PDF

Development of the Pilot Type Machine for Automation of PHC Pile Cutting Work (PHC 파일 두부정리 자동화를 위한 파일롯타입 장비의 개발)

  • Lee Jeong-Ho;Park Sang-Jun;Jeong Myung-Hoon;Kim Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.173-181
    • /
    • 2003
  • During the last few years, the use of Pre-tensioned spun high strength concrete piles(PHC pile) has been gradually increased in many construction sites. Cutting work of the concrete pile is an important task to crush a part of pile head which is compressed with more than 800$\cal{kg}f/cm^2$. It is usually performed by a crusher and three to four skilled workers. Recent analysis results of the pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose conceptual designs for developing an automated pile cutting machine. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.