• Title/Summary/Keyword: 균형성과표(BSC)

Search Result 116, Processing Time 0.024 seconds

The Impact of Knowledge Management-based Structure on Knowledge Management Activities and Business Performance (지식경영 기반구조가 지식경영활동과 경영성과에 미치는 영향)

  • Lee, Jae-Sik
    • Management & Information Systems Review
    • /
    • v.28 no.4
    • /
    • pp.229-252
    • /
    • 2009
  • The purpose of this study is to find out the determinants of knowledge management adoption through the analysis which examine structural relationships among knowledge management-based structure, knowledge management activities and business performance using the BSC(Balanced Scorecard) perspective. This study also gives the suggestion for the effective knowledge management implementation in the korean companies. This study has been conducted using the data collected from 91 companies implementing knowledge management. By analyses of the questionnaires, empirical results show that 3 factors of knowledge management-based structure, except organizational structure, have positive effect on knowledge management activities, and the implementation of knowledge management activities has positive effect on business performance with 3 perspectives of BSC, except financial performance. This study showed that more consideration are essential to obtain balanced business performance for companies with knowledge management adoption plan.

  • PDF

A Study on Developing BSC-based Public Library Performance Indicator Model (BSC 기반 공공도서관 성과지표 모형 개발에 관한 연구)

  • Kim, Jeong-Taek
    • Journal of Korean Library and Information Science Society
    • /
    • v.40 no.1
    • /
    • pp.47-71
    • /
    • 2009
  • The mission of public library is to contribute to local society's growth and improve local residents' quality of life by satisfying local residents' desire on information use, cultural activities, lifelong education, etc, and providing more convenient and equal access. This study is a research that deducted BSC-based public library performance indicator model composed of 12 critical success factors, 36 key performance indicators under four perspectives of learning and growth perspective, internal process perspective, resources perspective, and user perspective, estimated relative weights of deducted the performance indicator model on librarians of public libraries to analyze what performance indicator is important for accomplishing public library's mission and promoting performance.

  • PDF

Design of KPI on Individual Performance Measurement System (개별성과측정시스템의 주요성과지표 설계 연구)

  • Hong, Hyun-Gi;Oh, Sang-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.3
    • /
    • pp.815-821
    • /
    • 2008
  • Performance of corporation results from operation of tangible and intangible assets. Thus, measuring performance need to be taken place in terms of tangible and intangible aspects. However, the research objects, in the measurement of performance, do not guarantee researchers to achieve quantitative results and it is difficult to have objectivity. There are also many different points between a big enterprise and a small-medium size company. These facts require new measurement methods. This study suggests aspects of measurement method as task, attitude, ability and qualification for small-medium size companies. Specially, this study suggest individual measurement method than organizational one. The research system consists of users, team leaders and staffs charge of BSC and the users can access BSC sewer to input, to evaluate and to prove data through their own accounts.

성과측정과 관리 동일하지 않다

  • Korea Database Promotion Center
    • Digital Contents
    • /
    • no.3 s.82
    • /
    • pp.74-77
    • /
    • 2000
  • 기업의 성과를 관리할 때 성과측정은 필수적이다. 그러나 성과측정을 성과관리의 반복적인 과정과 혼동하는 일이 대단히 빈번하다. 이 기사에서는 성과측정이 관리과정의 필수부분이기는 하지만, 그 둘이 같지 않다는 것을 밝히고자 한다. 또한 균형성과 기록표(BSC)가 성과관리 과정을 자동화하는데 어떻게 사용될 수 있는가 하는것을 설명하고자 한다.

  • PDF

Construction Project Performance Management Using BSC and Data Warehouse (BSC를 활용한 Data Warehouse 기반의 건설 프로젝트 성과관리)

  • Park, Moon-Seo;Kim, Nam-Ho;Lee, Hyun-Soo;Ahn, Chang-Bum;Lee, Kyu-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.14-25
    • /
    • 2009
  • Many companies have managed their business performance in order to achieve their enterprise purpose. Performance management which applied concept of BSC (Balanced Scorecard) is widely used all over the world. In the construction industry, BSC-based performance management is currently introduced with needs of balanced performance evaluation. However, most companies actually have intermediate level of adapting BSC. It is important to understand its process or and structure. Therefore, this paper is focused on making performance management process and defining each phase of it. In addition, the model and system are established with putting them together. With developing performance process in construction, the construction companies are supposed to detect the deficiencies of the current performance management systems and take some opportunity to be helped for supporting their decision-making. In conclusion, this paper will provide the construction industry with the opportunities to enhance the values of performance management system and construction application.

Development of an Evaluation Model for the Implementation of IMO Instruments (IMO 협약이행에 대한 평가모델 개발)

  • Choi, Choong-Jung;Jung, Jung-Sik;An, Kwang
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.4
    • /
    • pp.542-548
    • /
    • 2022
  • In order to reduce marine accidents, each contracting Government needs to implement the instruments enacted and amended by the International Maritime Organization (IMO). The III Code requires each administration of the government to have a system for improvement through periodic review and evaluation and to include performance indicators in its evaluation methods. Thus, each IMO Member State needs to develop its own performance indicators. The purpose of this paper is to develop and present an evaluation model using the Balanced Scorecard (BSC) and Key Performance Indicators (KPI) in order to quantify and evaluate the level of implementation of the instruments by the administrations. From the perspective of 'III-BSC', which applies the BSC concept to the III code requirements, the Critical Success Factors (CSF) that must be secured to achieve the established vision were drawn up, and candidate KPIs for each evaluation area were developed to measure the derived key success factors and an initial study model was designed composed of four levels. The validity of the KPIs was verified and the study model was finalized using the survey design using the SMART technique. Furthermore, based on the developed study model, an evaluation model for the implementation of the BSC-based IMO instruments was developed by deriving the weights of elements for each level through AHP analysis. The developed evaluation model is expected to contribute toward improving the administrations' level of implementation of the IMO instruments as a tool for quantitatively grasping the level of performance of the implementation.

A Study on the applicability of Balanced Scorecard into the Performance Management of National R&D Programs (국가연구개발사업의 성과관리를 위한 균형성과표 적용가능성에 대한 연구)

  • 이재근;한미경
    • Proceedings of the Technology Innovation Conference
    • /
    • 2006.02a
    • /
    • pp.187-204
    • /
    • 2006
  • According to increasing dependancy of national competitiveness on her level of science and technology, the Korean Government devote herself to expansion of technological capability in nation-wide. As a result, the numbers and sizes of national R&D programs, one of public technology policies, are abruptly increased. Recently, the government closely examines the introduction of performance-based budgeting regime as well as the accountability issue in public sector. In the fulfillment of accountability, it has considerable importance that the government executes measurement and strategic management of their performances of all the national R&D programs, how they are properly executed in conformity with respective missions and characteristics. It needs a tool for clearly measuring the programs' performances. In this study, the Balanced Scorecard (BSC) is suggested as an alternative. However, the logics of ordinary BSC cannot be directly applied to the program unit. This study reviews the basic concept and principles of BSC and discusses the necessary conditions for proper application of BSC into national R&D programs.

  • PDF

The Relationships among E-commerce, BSC, Inter-organizational Information Flow and Supply-Chain Performance (전자상거래, 균형성과표, 조직간 정보교류와 공급망 성과 간의 관계 연구)

  • Choe, Jong-Min
    • Korean Management Science Review
    • /
    • v.30 no.1
    • /
    • pp.149-165
    • /
    • 2013
  • This study empirically investigated the changes of performance evaluation systems under the environment of supply-chain e-commerce. The objectives of e-commerce include obtaining financial profit, internal innovation through processes integration, learning with information flow, and customer satisfaction through quick response. These objectives are generally consistent with the four evaluation measures of balanced scorecard(BSC). This study, first, demonstrated that perceived environmental uncertainty(PEU) has a significant effect on the adoptions of e-commerce and BSC, and severe competition positively influences the use of e-commerce. With cluster analysis and subgroup analysis, we also showed that under the high adoption levels of e-commerce, the high utilization of BSC can improve the supply-chain performance of a firm. In addition, it was found that the use of e-commerce indirectly and significantly affects supply-chain performance through inter-organizational information flow, and the supply-chain performance of a firm leads to the improvement of organizational performance.

BSC Perspective of an Exploratory study of Developing CSF/KPI Pool in Korean Construction Industry (균형성과표(BSC)에 의한 건설산업의 주요성공요인과 성과지표개발에 관한 연구)

  • Oh, Ic-Jin;Lee, Jung-Hoon;Lee, Choong-C.
    • Journal of Information Technology Services
    • /
    • v.5 no.1
    • /
    • pp.35-46
    • /
    • 2006
  • In recent years, academic scholars and practitioners have given increasing attention to the importance of strategic performance measurement systems including both financial and non-financial performance metrics. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps an enterprise to translate strategic objectives into relevant performance within an organization. While the current literatures and management articles offer BSC design and implementation. there are few reports of detailed validation of using the rationalized sets of CSF (Critical Success Factors) and KPI (Key Performance Indicators) for the Korean construction industry. This paper first propose the perceived sets of CSF/KPI using current literatures and validate with a major construction company's executives and senior managers in Korea. The paper then examines whether the perceived sets of CSF/KPI have co-relationships with the firm performances. The results of the research contribute in heightening of competitiveness of the Korean construction companies in strategic and performance management.

Development of Management Performance Index Building BSC System for Hotels (BSC 시스템 구축을 위한 호텔기업의 성과지표 개발)

  • Chung, Tae-Woong
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.9
    • /
    • pp.234-241
    • /
    • 2008
  • The feature of the hotel business as a labor intensive industry and its heavy dependence on man power is relatively bigger than other industries. the important factors influencing the customer`s decision making are tangible facilities and intangible service qualities. however, the changes in economic situation are also seriously influencing them. So hotels are started to find other IT(information technology) systems. BSC which has been recognized as one of barometers to establish management performance is one of them. The purpose of this study was to develop KPI(key performance indicator) by using the BSC(Balanced Scorecard) for evaluating hotel management performance. This thesis presents customer performance, inner process performance, learning and growing performance as non-financial factors and tries to examine the cause and effect in the hotel industry. Hotels have to know nonfinancial performance which has positively relate to financial performance. To introduce BSC system is not to lead increasing income and bettermenting service quality, satisfacting customer needa for hotels, But to lead developing value enhancement to hotel enterprises and present process.