Cost Estimating for Public Facilities at Early Stage Using Functional Area Cost - Focusing on Army Barracks - (공공건축물 계획단계에서의 용도별 공사비 예측에 관한 연구 - 육군 병영생활관을 대상으로 -)

  • Lee, Hyun-Soo;Jung, Myung-Jun;Park, Moon-Seo;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.3-13
    • /
    • 2010
  • The purpose of this research is to develop a conceptual model that establishes a new approach for functional area cost estimating in the schematic design phase. A cost estimating model should consider not only the estimate accuracy, but also the flexibility to the design alternatives and user-oriented serviceability. Therefore, this research uses the method that classifies various facilities of a building according to its functions by analyzing historical data. After setting the functional area as cost parameter, a formula which can estimate functional area cost is derived from statistical analysis. Finally, to validate the proposed conceptual model, it is applied to historical data of a military barrack project. It enables customized space planning reflecting client's needs and compares the cost of various design alternatives as well as improves estimate accuracy.

Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors - (표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 -)

  • Cho, Jeongyeon;Kim, Kyong Ju;Kim, Kyoungmin;Kim, Sang Kwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.665-675
    • /
    • 2008
  • The objective of this paper is to provide an approximate cost estimating model for tunnel that can be utilized both in quick construction cost estimating for design alternatives, and in evaluating efficiently the cost effects according to the environmental changes during design and construction stage. To meet this requirement, this study analyzes critical cost factors influencing tunnel construction costs. The cost factors include 7 elements such as rock drilling method, advancing method, type of detonator, loader capacity, unit weight and soil volume change factor, length of tunnel. This paper investigates the cost variance according to the change of the cost factors. The result is expected to be used in formulating approximate tunnel cost estimating model.

A Standard Section-Based Approximate Cost Estimating Model on Tunnel (II) - Cost Variance Index Table and Test - (표준단면을 이용한 터널 공사비 예측모델 개발 (II) - 공사비 변동 모델 및 검증 -)

  • Cho, Jeongyeon;Kim, Sang-Kwi;Kim, Kyoungmin;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.677-684
    • /
    • 2008
  • The paper provides an approximate cost estimating model that can be used for tunnel. Based on the previous study analyzed critical factors that have impact on tunnel construction cost, this paper establishes a cost variance index table that reflects the cost impacts due to the change of the critical cost factors. An estimating procedure is described utilizing the index table. For the verification of the suggested model, the comparison of the estimated construction cost with real project cost is performed. The estimated results range from 95%~111% of the real project costs. As an approximate tunnel cost estimating model, the model can be utilized to quickly estimate tunnel construction costs based on the conceptual information at the planning stage and to efficiently make a decision on design alternatives.

A Basic Study on an Application of Quantity Take-Off Requirements for Open BIM-based Schematic Estimation of Architectural Work (개방형BIM기반의 건축공사 개산견적을 위한 물량산출 적용지침 활용방안 기초 연구)

  • Kim, Inhan;Um, Sung-Gon;Choi, Jungsik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.2
    • /
    • pp.182-192
    • /
    • 2015
  • In recent years, numerous studies have attempted to extract quantity data by using Building Information Modeling (BIM). In terms of open-BIM based quantity take-off at the early design stage, only few studies were conducted in the field of cost engineering. A lack of compatibility of open BIM for information exchange is postulated as the cause. The Industry Foundation Classes (IFC) extension model has been developed to accommodate the interoperability with quantity take-off software. Improvement of open BIM for quantity take-off needs exchange requirements and model guidelines. For this purpose, the quantity data of IFC models were analyzed using BIM analysis tools. This paper also provides a proposal of requirements on open BIM based quantity take-off at the early design stage. Further this study have been develop the interface system for open BIM based quantity take-off requirements with the results on this study.

Improvement of BoQ Documents for the BIM based Quantity Takeoff (BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안)

  • An, Ji-Won;Yun, Seok-heon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

  • Kim, Hyun-Joo
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.1-10
    • /
    • 2019
  • In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition (2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발)

  • Sunwoo, Hyo-Bin;Choi, Go-Hoon;Heo, Seok-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

The Economic Impact of Excavation Work Failure on a Construction Project (터파기 공사 사고가 공사에 미치는 경제적 영향)

  • Go, Kwang-Ro;Lee, Ghang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.643-646
    • /
    • 2007
  • As increase of the land price at downtown area, it makes people more and more interested of improving the space utilization such as makes buildings bigger, deeper and higher. Therefore, the importance of the underground construction which is the basic principle has been increased. As constructors have to complete underground construction as soon as possible with the minimum costs, they concentrate on the whole process of underground structure. Although they makes every these efforts, construction failure still happen because of the uncertainty of the condition of soil and the unexpected danger of underground construction. To make matter worse, there are only some examples without detailed information like 'how much this breakdown damage to the construction?' so it is the anther problem that most of people doesn't recognize the economical negative impact of underground structure breakdown. This report would make people understood the importance and risk of the underground construction by showing some analysis which was assumed from the real accidents.

  • PDF

A Study on Adaptation of Neural Network to Warren Truss Design (와렌 트러스 설계에의 신경망 적용에 관한 연구)

  • Shin, Dong Cheol;Lee, Seung Chang;Cho, Young Sang
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.4 s.65
    • /
    • pp.413-422
    • /
    • 2003
  • Most engineers tend to rely on their intuition or existing data in formulating structural design or preliminary estimate of various conditions. Because of these variations, the artificial neural network is used as an alternative design model of the warren truss since it can handle uncertainty through the probability method. This research validated the approximate structural design model of the warren truss, with its proper parameter values of the neural network and design process falling within 10 percent torrence of the different designs that resulted between this model and the MIDAS program. The suggested model for the process was adapted for the truss design using the member section table, while time saving and efficiency are based on the allowed range of torrence.

A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model (기준모델을 사용한 종합사업관리용역비 산정방법(ICEP) 연구)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.119-128
    • /
    • 2015
  • Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.