Improvement of BoQ Documents for the BIM based Quantity Takeoff  

An, Ji-Won (경상대학교 건축공학과)
Yun, Seok-heon (경상대학교 건축공학과)
Publication Information
Journal of KIBIM / v.7, no.2, 2017 , pp. 16-24 More about this Journal
Abstract
It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.
Keywords
Preliminary Cost Estimation; Building information modeling (BIM); Bill of Quantity;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Choi, S. I. (1997), A conceptual cost estimating process for building construction projects, Masters thesis, Chung Ang University, pp. 5-18.
2 Han, N. H., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of KIBIM Magazine, 5(2), pp. 1-11.
3 Kang, M. K. (2008). A Method of Cost, Breakdown, Process, Progress Unified Management based on BIM, masters Thesis, Sung Kyun Kwan University, pp. 8-20.
4 Kim, B. M., Jeon, H. J., Jang, S. J., Yun, S. H., Paek, J. H. (2008) A study on the Improving Effectiveness of Quantity Estimation with BIM, Journal of the Architectural institute of Korea, 28(1), pp. 705-708.
5 Kim, K. H., Park, C. S., Chang, S. H. (2005). web-Based Cost Planning Program for High-Rise Office Building, Journal of Korea Institute Construction Engineering and Management, 6(2), pp. 69-79.
6 Kwon, O. B., Son, J. H., Lee, S.H. (2009). Study on Applicationo 3D - based BIM for School Facilities to Increase Cost Management Efficiency. Journal of the Korea Institute of Building Construction, 10(6), pp. 49-60.   DOI
7 Lee, C. H., Kim, S. A., Chin, S. Y. (2011). An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off, Journal of Korea Institute Construction Engineering and Management, 12(6), pp. 79-92.
8 Lee, J. H. (2010). A Case Study on the Detailed Estimation using BIM, Masters Thesis, Chung Ang University, pp. 35-37.
9 Lee, M. C. (2008). A Study on the BIM Property Information Modeling for the Cost Estimate of the Public Construction Projects, Masters Thesis, Housing Seoul National University of technology, pp. 4-16.
10 Li, Q., Tian, Z. (2014). Construction project cost management under the mode of bill of quantities, Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate, pp. 769-780.
11 Joo, S. I., Jun, H. J. (2009) A Study on the BIM-basd Material Take Off That is Usable as 4D Simulation, Journal of the Architectural institute of Korea, 29(1), pp. 335-338.
12 Lim, D. H., Lee, H. S., Park, M. S., Son, B. S. (2008). Analyzing the Schematic Cost Estimating Model Based on Quantity Variation in Building Projects Using the Case Study - Applying to Structure Cost of Residential Complex Building Project -, Journal of the Architectural institute of Korea, 24(6), pp. 109-118.
13 Noh, H. R. (2017). A Case Study on the Educational Facility Project for the Improvement of BoQ Information Structure, pp. 181-190.
14 Park, S. M. (2003). study on the application of estimation method of historical cost data for estimating the proper construction cost, Masters thesis, Yonsei University, pp. 24.
15 Park, Y. J., Won, S. K., Han, C. H., Lee, J. B. (2011). A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects, Journal of the Architectural institute of Korea, 27(6), pp. 123-130.
16 Sim, H. W. (2012). A Study on The Usability of a BIM-based Integration Solution to The Preliminary Estimate of the Public Sonstruction Projects, Masters Thesis, Seoul National University of Science and Technology, pp. 5-6.
17 Suh, B. G. (2014). A study on way to build combination DB of the building element types for BIM based preliminary estimate. Masters Thesis, Gyeongsang National University, pp. 1-15.
18 Yoo, M. K. (2008). A study on Improving Estimating practices of Building Projects Using BIM, Masters thesis, Chung Ang University, pp. 16-18.