A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model  

Baek, Myeongchang (Department of Architectural Engineering, Chungbuk National University)
Park, Junmo (Institute of Construction Technology, Chungbuk National University)
Park, Gilbeom (Department of Architectural Engineering, Chungbuk National University)
Kim, Okkyue (Department of Architectural Engineering, Chungbuk National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.16, no.1, 2015 , pp. 119-128 More about this Journal
Abstract
Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.
Keywords
Program Management; Project Management; Cost Estimation; Typical Model; Project-Specific Factor; Rough Estimate; ICEP;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Chung, J., and Yoon, T. (2006). "A Study on the Estimate of Construction Management Cost for Public Construction Project in the CM for Fee Contract", Journal of the Korea Institute of Building Construction, JKIBC, 6(3), pp. 115-122.   과학기술학회마을   DOI   ScienceOn
2 Multifunctional Administrative City Program Management Method Research Report (2007). Multifunctional Administrative City Construction Agency, p. 144, p. 150.
3 Notification of MOLIT 2009-825. Business index of CM.
4 Notification of MOLIT 2012-567. Standard of Cost of CM.
5 USFK Base Relocation Program Management Cost Estimation Research Report (2005). Defence Installations Agency, p. 34, p. 38.
6 Ahn, S.H. and Kim, J.D. (2013). "A Study on the Calculation of Organization Scale in Construction Management", Korean Journal of Construction Engineering and Management, KICEM, 14(4), pp. 65-72.   과학기술학회마을   DOI   ScienceOn
7 Lee, T.W. and Lee, Gang (2014). "A Study on Practical Ways to Improve Pricing Criteria for Technical Service Contracts", Korean Journal of Construction Engineering and Management, KICEM, 15(2), pp. 33-42.   과학기술학회마을   DOI   ScienceOn
8 Baek, M.C. Park, J.M. Park, G.B. and Kim, O.K. (2014). "A Study on the Method for the Estimate of Construction Management in the Program management", Korean Journal of Construction Engineering and Management, KICEM, 15(5), pp. 3-12.   과학기술학회마을   DOI   ScienceOn