A Basic Study on an Application of Quantity Take-Off Requirements for Open BIM-based Schematic Estimation of Architectural Work  

Kim, Inhan (Dept. of Architecture, Kyung Hee Univ.)
Um, Sung-Gon (Koreasoft Inc.)
Choi, Jungsik (Dept. of Architecture, Kyung Hee Univ.)
Abstract
In recent years, numerous studies have attempted to extract quantity data by using Building Information Modeling (BIM). In terms of open-BIM based quantity take-off at the early design stage, only few studies were conducted in the field of cost engineering. A lack of compatibility of open BIM for information exchange is postulated as the cause. The Industry Foundation Classes (IFC) extension model has been developed to accommodate the interoperability with quantity take-off software. Improvement of open BIM for quantity take-off needs exchange requirements and model guidelines. For this purpose, the quantity data of IFC models were analyzed using BIM analysis tools. This paper also provides a proposal of requirements on open BIM based quantity take-off at the early design stage. Further this study have been develop the interface system for open BIM based quantity take-off requirements with the results on this study.
Keywords
BIM Quantity Take-off (QTO); Building Information Modeling (BIM); Industry Foundation Classes (IFC); Open BIM; Requirements;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Eastman, C., Teicholz, P. and Sacks, R., 2011, BIM Handbook (A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors)-2nd edition, JohnWiley & SonsInc.
2 Kim, H., Kim, H., Choi, J. and Kim, I., 2013, The Development of Data Model for Open BIM-Based Schematic Estimates, Journal of the Architectural Institute of Korea Planning & Design, 29(3), pp.61-70.   DOI
3 Choi, J., Kim, H. and Kim, I., 2014, Open BIM-Based Quantity Take-Off System for Schematic Estimation of Building Frame in Early Design Stage, Journal of Computational Design and Engineering, 2, pp.16-25.
4 Ministry of Construction & Transportation, 2007, Standard Method of Quantity Takeoff of Construction Work.
5 Weise, M., Liebich, T., Tulke, J. and Bonsma, P., 2009, IFC Support for Model-Based Scheduling, CiBW78, inpro-project.org, p.5.
6 National BIM Standard-United States for QTie, 2010, http://www.nibs.org/?page=bsa_qtiechallenge10
7 Teo, A., 2011, Enhancing Productivity: Electroric Quick Bills of Quantities via BIM, Forum8 Design Festival The 5th Conference.
8 Kim, H., Choi, J. and Kim, I., 2013, Methodology of Open BIM-Based Quantity Take-Off for Schematic Estimation of Frame Work in Super-Tall Buildings, Journal of the Architectural Institute of Korea Planning & Design, 29(5), pp.31-38.   DOI
9 buildingSMART International, List of software claiming IFC support, http://www.buildingsmart-tech.org/implementation/ implementations
10 Thomas, L., buildSMART, 2009, IFC 2x Edition3 Implementation Guide, http://www.buildingsmart-tech.org/implementation/ifc-implementation/ifcimpl-guide/ifc-impl-guide-summary
11 Koreasoft inc., 2012, BIM 5D Guideline.
12 Public Procurement Service, 2012, BIM Guide of Public Procurement Service v1.1.
13 Choi, J. and Kim, I., 2013, Development of Checklist for BIM Based Architectural Design Quality Check, Transactions of the Society of CAD/CAM Engineers, 18(3), pp.177-188.   DOI