The Calculation Method for Prolongation cost of Sub-Constract in Domestic Public Construction Project (국내 공공 공사 하도급계약 공기연장 추가간접비 산정방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.61-69
    • /
    • 2018
  • Research on additional indirect cost due to construction period extension in general contracts has continuously been active whereas the same for the subcontract operations has not been. In this research, we review previous research on evaluation methods for additional indirect costs which are widely being used on construction sites as well as previously proposed methods altogether, applying them to analyze model-cases for comparison. We acknowledge that this pattern for construction cost fluctuation over the construction period demonstrates an S-curve. This S-curve shaped indirect cost occurrence is then used to generate model-cases that are used throughout the research which models we applied previous evaluation methods on. Finally in pursuit of finding out some problems of evaluation methods, we came to derive a conclusion that the "Average Actual Cost Evaluation Method on Extended Duration," which, in turn, were proved to be valid for application on general contracts, was also valid for general application on subcontractor operations.

Analysis of Cost Structures of National R&D Programs for Effective National R&D Management (국가연구개발 정률예외사업의 원가구조분석을 통한 합리적인 사업관리방안)

  • Cho, Seong-Pyo;Ha, Seok-Tae;Hwang, Myung-Ku
    • Journal of Technology Innovation
    • /
    • v.25 no.2
    • /
    • pp.153-179
    • /
    • 2017
  • Korean government has granted fixed indirect cost rates to several exceptional R&D programs which is lower than the predetermined rate by the government. It has been needed to evaluate the validity of exceptional R&D programs and determine the optimal indirect costs rate of the programs. This study analyzes the cost structure and explores drivers of indirect costs of exceptional R&D programs and evaluates the validity of current indirect costs rates. Finally, we propose the formulas for indirect costs rates of exceptional R&D programs. We analyze the cost structure of the exceptional R&D programs. Equipments and material costs are 50% in infra building program. Scholarship to students is 43% in HRD program. Equipments and material costs are 50% and R&D activity costs are 31% in international R&D program. Main cost components of evaluation program are salary(37%), R&D execution costs(21%) and R&D activity costs(19%). We propose three formulas of indirect costs for exceptional programs. 1) The cost items with exceptionally large amount are excluded in the base of formula for indirect costs. 2) Fixed indirect cost rate is applied for specific R&D programs. 3) Upper bound is set for the cost items with exceptionally large amount in the calculation of indirect costs rate. Our proposal is expected to contribute to the improvement of the efficiency of national R&D programs.

A Rating Method for the Estimation of the Additional Overhead Expenses incurred by Schedule Extension in Public Construction Projects (공공건설공사의 공기연장에 따른 추가간접비 산출을 위한 요율방식 제안)

  • Lee, Seung-Joon;Cha, Yongwoon;Han, Sangwon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.79-90
    • /
    • 2021
  • In domestic public construction, disputes are increasing due to differences among stakeholders regarding contract price adjustment. In particular, the actual cost-plus fee for overhead costs due to the schedule extension cannot be agreed upon at the administrative phase, and most of them seek judicial judgment. Thus, this study aims to propose a 'sufficiently satisfactory' alternative to reach an agreement before disputes in order to minimize disputes related to the calculation of additional overhead costs. To this end, this study proposes three alternatives based on the rate method. Firstly, when calculating additional overhead costs, it is not calculated as an actual cost-plus-fee method, but as a rate compared to direct labor costs among net direct costs. Secondly, the calculated indirect labor costs are compensated for up to the legal maximum of legal limit costs such as general management costs, profits and so on. Thirdly, it reflects overhead costs increased or decreased due to change orders. Risks were analyzed by collecting expert opinions on the proposed methods and applying actual cases. Finally, as a result of investigating the level of consensus for each stakeholder, it was confirmed that all stakeholders could agree regardless of the size of the company. The result of this study is expected to as a useful tool among stakeholders in the construction fields that can be able to easily agreed upon.

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.

Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project (장기계속계약공사의 공기연장 추가간접비 산정 개선방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.30-37
    • /
    • 2017
  • In Korea, additional indirect costs generated from the time period extension of public construction projects have been studied. Practical claims against such costs are increasing. There are no clear criteria for calculating the delay cost caused by the extension, and thus calculation methods differ across entities. Logical valid calculation methods have also not been researched. Further, there are no Korean studies on the additional indirect cost caused by a suspension in a public construction project on a long-term continuing contract. The purpose of this research is to propose a method of calculating the indirect cost incurred by construction time extension that reflects the characteristics of Korean public construction projects. The cost patterns generated during construction periods were analyzed, and then the current criteria of calculating the indirect costs caused by the extension were examined. Following this, actual conditions and practices in the field were surveyed and the current calculation method was applied to a model case to compare the actual cost and that determined from the current calculation method. Issues with the current method were identified by this comparison. Based on this, this research proposes a method of calculating the total actual cost caused by a suspension in a public construction project that is appropriate for calculating the additional indirect cost generated by a suspension in a public construction project on a long-term continuing contract.

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.