A Rating Method for the Estimation of the Additional Overhead Expenses incurred by Schedule Extension in Public Construction Projects |
Lee, Seung-Joon
(Department of Architectural Engineering, University of Seoul)
Cha, Yongwoon (Korea Institute of Civil Engineering and Building Technology) Han, Sangwon (Department of Architectural Engineering, University of Seoul) Hyun, Chang-Taek (Department of Architectural Engineering, University of Seoul) |
1 | Lee, S. (2018). "Introduction to a Rating Method for the Estimation of the Additional Overhead Expenses incurred by Delayed Schedules." Master thesis, Univ. of Seoul., Korea. |
2 | Hyun, H. (2013). "Contract Management and Claims." Cplus International, Koea. |
3 | Jeong, K. (2016). "A Model to Estimate Additional Indirect Costs for Extended Construction Times." Doctoral thesis, Dongguk Univ., Korea. |
4 | Koo, H. (2017). "A Selection Logic of Policy Making: Rationality, Constraint, and Symbol." Korean Journal of Public Administration, SNU-KIPA, 55(4). pp. 273-306. DOI |
5 | Lee, H. (2018). "A Risk Assessment Model for Delay Management Protocol in the Contract Conditions of International Construction Projects." Doctoral thesis, Ajou University, Korea. |
6 | Kim, B., Seong, G., Bae, I., Bang. H., and Choi, H. (2019a). "An Design of Analyzing Process by Construction Extension of Time." Korean Journal of Construction Engineering and Management, KICEM, 20(4), pp. 104-113. DOI |
7 | Choi, M. (2010). "A Study on the Technique of Calculation of Construction Period Extension-Oriented Overhead Costs." Master thesis, Chung-Ang Univ., Korea. |
8 | Cho, S. (2016). "Institutional Improvement Plans for Indirect Cost Issues Due to Public Works' Prolonged Construction Period." Master thesis, Kyonggi Univ., Korea. |
9 | Jeong, K., and Lee, J. (2018). "Application of Accrual Basis for Calculation of Prolongation Cost in Construction Project." Korean Journal of Construction Engineering and Management, KICEM, 19(5), pp. 111-120. DOI |
10 | Construction Economy Research Institute Of Korea (CERIK) (2020). "Top 60 Tasks for Construction and Housing Regulatory Reform." Korea. |
11 | Cho, D. (2017). "Institutional Improvement Plans for Indirect Cost Issues Due to Public Works Prolonged Construction Period." Master thesis, Chung-Ang Univ., Korea. |
12 | Korea National Railway (2017). "Indirect Charge Response Manual." KNR, Korea. |
13 | Sung, K. (2013). "A Study on the Legal Issues in Petitions for Indirect Costs, etc., in a Public Construction Contract." Master thesis, Kwangwoon Univ., Korea. |
14 | Shin, Y. (2012). "Improvement of the Calculation Method on the Additional Costs due to Construction Delay." Doctoral thesis, Dongguk Univ., Korea. |
15 | Kim. D. (2019b). "A Study on the Legal Issue Due to Time Extension of Public Construction Work." Doctoral thesis, Kwangwoon Univ., Korea. |
16 | Kim, K. (2018). "An Estimation Model for the Additional Overhead Cost of Extended Duration of Construction by using the Case Based Reasoning (CBR) Method." Master thesis, Univ. of Seoul, Korea. |
17 | Korea Cost Accounting Association (2010). "A Study on the Improvement of Air Extension Cost Items." KCAA, Korea. |
18 | Kim, W. (2017). "Analysis and Implications of Wage Gap between Large and Small Company." I-KIET Industry and Economic Issues, KIET, 28, pp. 1-12. |