A Rating Method for the Estimation of the Additional Overhead Expenses incurred by Schedule Extension in Public Construction Projects  

Lee, Seung-Joon (Department of Architectural Engineering, University of Seoul)
Cha, Yongwoon (Korea Institute of Civil Engineering and Building Technology)
Han, Sangwon (Department of Architectural Engineering, University of Seoul)
Hyun, Chang-Taek (Department of Architectural Engineering, University of Seoul)
Publication Information
Korean Journal of Construction Engineering and Management / v.22, no.3, 2021 , pp. 79-90 More about this Journal
Abstract
In domestic public construction, disputes are increasing due to differences among stakeholders regarding contract price adjustment. In particular, the actual cost-plus fee for overhead costs due to the schedule extension cannot be agreed upon at the administrative phase, and most of them seek judicial judgment. Thus, this study aims to propose a 'sufficiently satisfactory' alternative to reach an agreement before disputes in order to minimize disputes related to the calculation of additional overhead costs. To this end, this study proposes three alternatives based on the rate method. Firstly, when calculating additional overhead costs, it is not calculated as an actual cost-plus-fee method, but as a rate compared to direct labor costs among net direct costs. Secondly, the calculated indirect labor costs are compensated for up to the legal maximum of legal limit costs such as general management costs, profits and so on. Thirdly, it reflects overhead costs increased or decreased due to change orders. Risks were analyzed by collecting expert opinions on the proposed methods and applying actual cases. Finally, as a result of investigating the level of consensus for each stakeholder, it was confirmed that all stakeholders could agree regardless of the size of the company. The result of this study is expected to as a useful tool among stakeholders in the construction fields that can be able to easily agreed upon.
Keywords
Public Construction; Indirect Labor Cost; Overhead Dispute; Extension of Construction Period; Change of Design;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Lee, S. (2018). "Introduction to a Rating Method for the Estimation of the Additional Overhead Expenses incurred by Delayed Schedules." Master thesis, Univ. of Seoul., Korea.
2 Hyun, H. (2013). "Contract Management and Claims." Cplus International, Koea.
3 Jeong, K. (2016). "A Model to Estimate Additional Indirect Costs for Extended Construction Times." Doctoral thesis, Dongguk Univ., Korea.
4 Koo, H. (2017). "A Selection Logic of Policy Making: Rationality, Constraint, and Symbol." Korean Journal of Public Administration, SNU-KIPA, 55(4). pp. 273-306.   DOI
5 Lee, H. (2018). "A Risk Assessment Model for Delay Management Protocol in the Contract Conditions of International Construction Projects." Doctoral thesis, Ajou University, Korea.
6 Kim, B., Seong, G., Bae, I., Bang. H., and Choi, H. (2019a). "An Design of Analyzing Process by Construction Extension of Time." Korean Journal of Construction Engineering and Management, KICEM, 20(4), pp. 104-113.   DOI
7 Choi, M. (2010). "A Study on the Technique of Calculation of Construction Period Extension-Oriented Overhead Costs." Master thesis, Chung-Ang Univ., Korea.
8 Cho, S. (2016). "Institutional Improvement Plans for Indirect Cost Issues Due to Public Works' Prolonged Construction Period." Master thesis, Kyonggi Univ., Korea.
9 Jeong, K., and Lee, J. (2018). "Application of Accrual Basis for Calculation of Prolongation Cost in Construction Project." Korean Journal of Construction Engineering and Management, KICEM, 19(5), pp. 111-120.   DOI
10 Construction Economy Research Institute Of Korea (CERIK) (2020). "Top 60 Tasks for Construction and Housing Regulatory Reform." Korea.
11 Cho, D. (2017). "Institutional Improvement Plans for Indirect Cost Issues Due to Public Works Prolonged Construction Period." Master thesis, Chung-Ang Univ., Korea.
12 Korea National Railway (2017). "Indirect Charge Response Manual." KNR, Korea.
13 Sung, K. (2013). "A Study on the Legal Issues in Petitions for Indirect Costs, etc., in a Public Construction Contract." Master thesis, Kwangwoon Univ., Korea.
14 Shin, Y. (2012). "Improvement of the Calculation Method on the Additional Costs due to Construction Delay." Doctoral thesis, Dongguk Univ., Korea.
15 Kim. D. (2019b). "A Study on the Legal Issue Due to Time Extension of Public Construction Work." Doctoral thesis, Kwangwoon Univ., Korea.
16 Kim, K. (2018). "An Estimation Model for the Additional Overhead Cost of Extended Duration of Construction by using the Case Based Reasoning (CBR) Method." Master thesis, Univ. of Seoul, Korea.
17 Korea Cost Accounting Association (2010). "A Study on the Improvement of Air Extension Cost Items." KCAA, Korea.
18 Kim, W. (2017). "Analysis and Implications of Wage Gap between Large and Small Company." I-KIET Industry and Economic Issues, KIET, 28, pp. 1-12.