Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project  

Jeong, Kichang (Construction Cost Management Research Institute)
Lee, Jaeseob (Division of Architectural Engineering, Dongguk University)
Publication Information
Korean Journal of Construction Engineering and Management / v.17, no.4, 2016 , pp. 95-102 More about this Journal
Abstract
Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.
Keywords
Prolongation Cost; Time Extension; Delay cost; Contract Price Adjustment; Incidental Cost; Indirect Cost;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Adrian, James J. (1993). "Construction claims : A Quantitative Approach" Illinois, Stipes Publishing Company.
2 Cushman R. F., Carter J. D., Gorman P. J. and Coppi D. F. (2001). "Proving and Pricing Construction Claims" New York, Aspen Publishers.
3 Jeong, K., Park, Y. and Lee, J. (2012). "Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension." Korean Journal of Construction Engineering and Management, KICEM, 13(6), pp. 33-44.
4 Kim, j., Kim, K. and Han, J. (2011). "An Administration Model for Causes of Delay in Construction Projects to Decide Time Extension Responsibility." Korean Journal of Construction Engineering and Management, KICEM, 12(6), pp. 31-41.   DOI
5 Lee, G., and Kim, Y. (2001). "A Case Study on the Calculation of Delay Damages for Contractors according to the Extension of Contract Period." Proceedings of KICEM Annual Conference, KICEM, 1, pp. 305-310.
6 Ministry of Strategy and Finance (2010). "Improvement of the Payment Method on the Additional Costs due to Construction Extension" Research Report, Korea.
7 Shin, Y. C., (2012). "Improvement of the Calculation Method on the Additional Costs due to Construction Delay." Ph.D., Dongguk Univ, of Seoul, Korea.