Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage |
Lee, JeongHoon
(Department of Architecture & Architectural Engineering, Seoul National University)
Park, Moonseo (Department of Architecture & Architectural Engineering, Seoul National University) Lee, Hyun-Soo (Department of Architecture & Architectural Engineering, Seoul National University) Lee, Kwang-Pyo (Department of Architecture & Architectural Engineering, Seoul National University) Hyun, Hosang (Department of Architecture, Seoul National University) |
1 | Kim Young-Woo and Ballard,Glenn (2002). "Case Stduy-Overhead Costs Analysis" Proceedings IGLC-10, Aug. 2002. |
2 | Lim, Ji Youn, Yi,June-Seong, Shin,Seung-Woo, and Son,Jeong-Wook (2012). "Implementing Activitybased LCA Model for Carbon Dioxide Emission Analysis and Allocation of Envionment Cost". Korean journal of Construction Engineering and Management, KICEM, 13(4), pp. 78-88. DOI |
3 | Lee,Jung-Min, "Cost management of real estate developer and construction(2006)", Korean Studies Information, pp. 128-148. |
4 | Ozbayrak.M, Akgun,M, and Turker.A.K (2004). "Activity-based cost estimation in a push/pull advanced manufacturing system" International Journal of Production Economics, 87, pp. 49-65. DOI ScienceOn |
5 | Rhee,Ju Seong and Kim,Young Tai (1998). "A study on manufacturing overhead application under the change of manufacturing envrionment" Korean Association of Tax and Accounting, 5, pp. 241-267. |
6 | Song,sang-Hoon, Lee, Hyun-Soo, and Park, Moon-Seo (2006). "Activity-oriented Quality Costs Measurement and Analysis for Construction Project." Journal of Architectural Institute of Korea, 23(3). |
7 | Spedding T.A and Sun G.Q (1998). "Application of discrete event simulation to the activity based costing of manufacturing systems". International Journal of Production Economics, 58, pp. 289-301. |
8 | Ahn Taesik (1998). "Cost Drivers of Manufacturing Overhead:A Cross-sectional Analysis of Automobile Component Manufacturing Plants". Seoul Journal of Business, 4(2). |
9 | Jeong, Ki-Chang, Lee,Jae-Seob, and Park, Yang-Ho (2012). "Study on introduction of 'Pre-Agreement system for additional Incidental Cost' related to construction time extension". Korean journal of Construction Engineering and Management, KICEM, 13(6), pp 33-44. DOI |
10 | Jung, Young-soo and Joo, Mi-hee (2011). "Patterns and Trends in Cost Control Practice of Korean General Constracts". Korean journal of Construction Engineering and Management, KICEM, 12, pp. 79-87. |
11 | Kim, Yong-Woo, Ballard Glenn (2001). "Activity-Based Costing and Its application to lean construction", 9th annual conference of the international Group for Lean Construction. |
12 | Kim, Yong-Woo, Han Seungheon, Shin Sungwon, and Choi-Kunhee (2011). "A case Study of activitybased costing in allocating rebar fabrication costs to projects". Construction Management and Econmoics, 29, pp. 449-461. DOI ScienceOn |