• 제목/요약/키워드: substation system

검색결과 640건 처리시간 0.03초

유전 알고리즘을 이용한 변전소 복구 방안에 관한 연구 (A Study on The Restoration of Substation using Genetic Algorithm)

  • 박영문;원종률
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.820-822
    • /
    • 1996
  • This paper proposes a method for seeking the scheme of substation restoration by using genetic algorithm. Genetic algorithm (GA), first introduced by John Holland, is becoming an important tool in machine learning and function optimization. GA is a searching or optimization algorithm based on Darwinian biological evolution principle. As a test system, we assume a simple substation system and for the transformer fault, the result is obtained.

  • PDF

고도화된 자동화 변전소의 사고복구 지원을 위한 지식학습능력을 가지는 전문가 시스템의 개발 (Development of An Expert system with Knowledge Learning Capability for Service Restoration of Automated Distribution Substation)

  • 고윤석;강태규
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권12호
    • /
    • pp.637-644
    • /
    • 2004
  • This paper proposes an expert system with the knowledge learning capability which can enhance the safety and effectiveness of substation operation in the automated substation as well as existing substation by inferring multiple events such as main transformer fault, busbar fault and main transformer work schedule under multiple inference mode and multiple objective mode and by considering totally the switch status and the main transformer operating constraints. Especially inference mode includes the local minimum tree search method and pattern recognition method to enhance the performance of real-time bus reconfiguration strategy. The inference engine of the expert system consists of intuitive inferencing part and logical inferencing part. The intuitive inferencing part offers the control strategy corresponding to the event which is most similar to the real event by searching based on a minimum distance classification method of pattern recognition methods. On the other hand, logical inferencing part makes real-time control strategy using real-time mode(best-first search method) when the intuitive inferencing is failed. Also, it builds up a knowledge base or appends a new knowledge to the knowledge base using pattern learning function. The expert system has main transformer fault, main transformer maintenance work and bus fault processing function. It is implemented as computer language, Visual C++ which has a dynamic programming function for implementing of inference engine and a MFC function for implementing of MMI. Finally, it's accuracy and effectiveness is proved by several event simulation works for a typical substation.

IEC 61850 기반 154[kV] 변전자동화 시스템의 실계통 구축 (The Realiztion Methods of IEC 61850 Based 154[kV] Substation Automation System in KEPCO System)

  • 김용학;한정열;이남호;김병헌;박내호;홍정우
    • 조명전기설비학회논문지
    • /
    • 제24권5호
    • /
    • pp.86-93
    • /
    • 2010
  • 본 논문에서는 IEC 61850 기반의 지능형전자장치(IED)를 구비한 변전자동화 시스템(SAS)의 가용성 및 신뢰성을 실계통에서 향상시키기 위한 가이드라인을 제시한다. IEC 61850 표준의 통신 네트워크 및 시스템은 전력사가 변전소를 신/증설하는 경우에 새로운 설계 개념을 도입하도록 하고 있다. 그러나 현재는 기존의 2차계통인 보호, 감시, 제어 및 고장기록장치와 1차계통의 설비간에 배선에 의한 인터페이스에 기반을 두고 있으므로, 다기능의 IEDs가 기존과 유사한 방법으로 인터페이스를 하게 된다. 최근에는 전 세계적으로 많은 변전자동화 시스템의 구축사업이 보고되고 있으며, 또한 IEC 61850은 가장 보편적인 변전자동화 시스템을 위한 통신 표준이 되고 있다.

변전소 자동화 시스템의 구성 및 개발 사례 (A Structural Approach and Deployment of a Substation Automation System)

  • 유정식;이권한;최대희;최용범;이학성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.258-260
    • /
    • 2001
  • This paper describes the definition of a substation automation system and presents core components and its layered structure based on the modular approach. Also it introduces the implementation and deployment of our substation automation system which was adopted to the field recently.

  • PDF

Assessing the Impact of Advanced Technologies on Utilization Improvement of Substations

  • Han, Dong;Yan, Zheng;Zhang, Dao-Tian;Song, Yi-Qun
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권5호
    • /
    • pp.1921-1929
    • /
    • 2015
  • The smart substation is the heart of a transmission system, which is particularly emphasized as the most significant composition of smart grids in China. In order to assess the functionality performance of substation technologies, this paper presents methods used to identify the most promising solutions for smart substation design and to evaluate the technical levels of available technologies. The multi-index optimization model is presented to address the issue of smart substation planning. A mathematical model of the planning decision problem is established with multiple objectives consisting of economic, reliability, and green key indices, and many kinds of concerns including physical and environmentally friendly operations are formulated as a set of constraints. With respect to the assessment of the technical level regarding integration of advanced technologies into a substation, a modified grey whitenization weight function is adopted to structure a novel grey clustering method. The proposed grey clustering approach is used to overcome the difficulty of insufficient quantitative assessment capacity for traditional methods. The evaluation of technical effects provides the classification definition for the development phase and the maturity level of the smart substation. The effectiveness of the proposed approaches in planning decision-making and evaluation of construction efforts is demonstrated with case studies involving the actual smart substation projects of Wenchongkou substation in China Southern Power Grid (CSG) and Mengzi substation in State Grid Corporation of China (SGCC).

Bus Reconfiguration Strategy Based on Local Minimum Tree Search for the Event Processing of Automated Distribution Substations

  • Ko Yun-Seok
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권2호
    • /
    • pp.177-185
    • /
    • 2005
  • This paper proposes an expert system that can enhance the accuracy of real-time bus reconfiguration strategy by adopting the local minimum tree search method and that can minimize the spreading effect of the fault by considering the operating condition when a main transformer fault occurs in an automated substation. The local minimum tree search method is used to expand the best-first search method. This method has the advantage that it can improve the solution performance within the limits of the real-time condition. The inference strategy proposed expert system consists of two stages. The first stage determines the switching candidate set by searching possible switching candidates starting from the main transformer or busbar related to the event. The second stage determines the rational real-time bus reconfiguration strategy based on heuristic rules from the obtained switching candidate set. Also, this paper proposes generalized distribution substation modeling using graph theory, and a substation database based on the study results is designed.

차단키 실패 보호 IED의 IEC 61850 시스템 성능 시험 절차서에 관한 연구 (Study on IEC 61850 Performance Testing Procedures of BF Protection IED)

  • 이남호;장병태
    • 조명전기설비학회논문지
    • /
    • 제22권8호
    • /
    • pp.59-66
    • /
    • 2008
  • 디지털 기술 기반의 차세대 변전시스템의 시스템 성능 검증을 위해 변전소 전력설비의 보호에 있어 가장 중요한 보호요소 중 하나인 차단기 실패 보호 IED를 대상으로 하는 IEC 61850 시스템 성능 시험 절차서를 구현하였다. 디지털 변전소에 대한 통신규격이 단일화되고 시스템이 디지털화됨에 따라 IED들은 상호 통신이 가능해지게 되었으며, 따라서 단일 IED의 전기 접점을 통해 이루어지던 예전의 시험방식에서 네트워크를 통한 시스템 차원의 시험방식으로 변화가 필요하게 되었다. 본 논문에서는 차단기 실패 보호 IED를 시스템적으로 시험할 수 있도록 UML을 이용한 성능시험절차서의 구현내용을 보여주고자 한다.

Development of a 3-D Visualization Application for Management of Substation Equipment

  • Park, Chang-Hyun
    • 조명전기설비학회논문지
    • /
    • 제23권3호
    • /
    • pp.38-44
    • /
    • 2009
  • This paper presents a new windows application based on 3-D graphics and Text-To-Speech (TTS) for effective management of substation equipment. When problems in a power system occur, inexperienced power system operators may have difficulty in understanding the situation as well as finding suitable countermeasures quickly. This paper addresses an effective scheme to visualizing power system equipment under normal and abnormal conditions using 3-D graphics and animations. In addition, the state variations and the order of maintenance priority of substation equipment are represented by TTS and intuitive methods. The proposed system can help power system operators to more quickly understand the state of power system equipment, and it can provide operators with the suitable countermeasures for minimizing damage caused by equipment problems.

765kV 변전소 시운전에 관한 고찰 (Consideration on the trial operation of 765kV substation)

  • 변강;정시환;박근원;이상면;최만식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.29-31
    • /
    • 2002
  • Purpose of the 765kV trial operation conducted for the first time in our country are performance verification of domestic developed equipment(765kV M.Tr, GIS,etc) and extraction of problem in advance to commercial operation and cultivation of operation ability. The trial operation of 765kV substation was finished successfully under the positive supports of institutes. manufactures. and constructers. It is expected that extraction of problems in advance and accumulation of operation techniques through the trial operation of 765kV substation will be contributed largly to the realization of the without a hitch operation of 765kV system.

  • PDF

상정사고를 고려한 배전용 변전소 신,증설 계획 수립에 관한 연구 (A study on the planning for construction and expanding of distribution substation considering contingency)

  • 최상봉;김대경;정성환;배정효;하태현;이현구;한상용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.552-554
    • /
    • 2000
  • This paper presents algorithm to plan construction and expanding of substation considering contingency accidents by proposing utilization factor according to configuration of bank system. In this paper, at first, proper sphere of supply area in each district which could be standardized with respect to its supply capacity is established under assumption which was made long term load forecasting in district respectively. Secondly, goal of utilization ratio according to configuration of substation bank was set to keep reliability by remaining sound bank when it happen to one bank accidents Finally, optimal construction and expanding of substation considering economy and reliability simultaneously about substation to exceed these ratio could be anticipated.

  • PDF