Abstract

This paper presents the guideline for enhancing the reliability and availability of SAS with IEC 61850 based IEDs in real power system. The IEC 61850 standard communication networks and systems allow utilities to consider new designs for substations applicable both new substation and refurbishments. The existing solutions are based on hardwired interface between the primary substation equipment and the secondary protection, monitoring, control and recording devices. All over the world, lots of projects at different stages of realization have been reported during the last year leading to a rapid maturation of the associated technologies. At present, IEC 61850 is becoming a popular communication standard for the substation automation system.

본 논문에서는 IEC 61850 기반의 지능형전자장치(IED)를 구비한 변전자동화 시스템(SAS)의 가용성 및 신뢰성을 실계통에서 향상시키기 위한 가이드라인을 제시한다. IEC 61850 표준의 통신 네트워크 및 시스템은 전력사가 변전소를 신/증설하는 경우에 새로운 설계 개념을 도입하도록 하고 있다. 그러나 현재는 기존의 2차계통인 보호, 감시, 제어 및 고장기록장치와 1차계통의 설비간에 배선에 의한 인터페이스에 기반을 두고 있으므로, 다기능의 IEDs가 기존과 유사한 방법으로 인터페이스를 하게 된다. 최근에는 전 세계적으로 많은 변전자동화 시스템의 구축사업이 보고되고 있으며, 또한 IEC 61850은 가장 보편적인 변전자동화 시스템을 위한 통신 표준이 되고 있다.

Keywords

References

  1. “Communication networks and systems in substation-IEC 61850 Part 1-9”, IEC, 2003.
  2. “Toward effective substation automation”, IEEE power & energy magazine, 2007. https://doi.org/10.1109/MPAE.2007.365822
  3. M.C. Janssen, “IEC 61850 Impact on Substation Design”, IEEE transactions on power system, 2008.
  4. C.Hoga, P. Skare, “IEC 61850 projects in germany and switzerland”, IEEE, 2006. https://doi.org/10.1109/TDC.2006.1668524
  5. T.S.Sidhu, Yujie Yin, “IED modelling for IEC61850 based substation automation system performance simulation”, IEEE, 2006. https://doi.org/10.1109/PES.2006.1708970
  6. J.H.Holbach,J.Rodriguez,C.Wester, D.Baigent, L.Frisk, S.Kunsman, L.Hossenlopp, “Status on the first IEC61850 based protection and control, multi-vendor project in united states”, IEEE, 2007. https://doi.org/10.1109/PSAMP.2007.4740917
  7. “디지털 기술기반의 차세대 변전시스템 개발 - 2단계 1차년도 진도보고서”, 한전전력연구원, 2009.
  8. “IEC 61850 변전소자동화 시스템 현장적용 운영기준 수립 연구 - 최종보고서”, 한전전력연구원, 2009.
  9. A.Aspostolov, B.Vandiver,“Functional testing of IEC 61850 based IEDs and systems”, IEEE, 2004. https://doi.org/10.1109/PSCE.2004.1397723
  10. “독산 및 대방변전소 종합 자동화 설비 구축(DNP 방식)- 사업보고서“, 한국전력공사, 2003.
  11. “IEC 61850 기반의 154[kV] 동두천S/S-포천S/S간 송전선로의 SA 구축 - 사업보고서”, 한국전력공사, 2008.