The Realiztion Methods of IEC 61850 Based 154[kV] Substation Automation System in KEPCO System
![]() |
Kim, Yong-Hak
(한국전력공사 전력연구원)
Han, Jeong-Yeol (한국전력공사 전력연구원) Lee, Nam-Ho (한국전력공사 전력연구원) Kim, Byeong-Heon (한국전력공사 경기본부 변전운영팀) Park, Nae-Ho (한국전력공사 송변전운영처 변전운영팀) Hong, Jung-Woo (한국전력공사 송변전운영처) |
1 | “Toward effective substation automation”, IEEE power & energy magazine, 2007. DOI |
2 | M.C. Janssen, “IEC 61850 Impact on Substation Design”, IEEE transactions on power system, 2008. |
3 | C.Hoga, P. Skare, “IEC 61850 projects in germany and switzerland”, IEEE, 2006. DOI |
4 | T.S.Sidhu, Yujie Yin, “IED modelling for IEC61850 based substation automation system performance simulation”, IEEE, 2006. DOI |
5 | J.H.Holbach,J.Rodriguez,C.Wester, D.Baigent, L.Frisk, S.Kunsman, L.Hossenlopp, “Status on the first IEC61850 based protection and control, multi-vendor project in united states”, IEEE, 2007. DOI |
6 | “Communication networks and systems in substation-IEC 61850 Part 1-9”, IEC, 2003. |
7 | “디지털 기술기반의 차세대 변전시스템 개발 - 2단계 1차년도 진도보고서”, 한전전력연구원, 2009. |
8 | “IEC 61850 변전소자동화 시스템 현장적용 운영기준 수립 연구 - 최종보고서”, 한전전력연구원, 2009. |
9 | A.Aspostolov, B.Vandiver,“Functional testing of IEC 61850 based IEDs and systems”, IEEE, 2004. DOI |
10 | “독산 및 대방변전소 종합 자동화 설비 구축(DNP 방식)- 사업보고서“, 한국전력공사, 2003. |
11 | “IEC 61850 기반의 154[kV] 동두천S/S-포천S/S간 송전선로의 SA 구축 - 사업보고서”, 한국전력공사, 2008. |
![]() |