Browse > Article
http://dx.doi.org/10.5207/JIEIE.2008.22.8.059

Study on IEC 61850 Performance Testing Procedures of BF Protection IED  

Lee, Nam-Ho (한국전력공사 전력연구원)
Jang, Byung-Tae (한국전력공사 전력연구원)
Publication Information
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers / v.22, no.8, 2008 , pp. 59-66 More about this Journal
Abstract
Korea Electric Power Research Institute in charge of the power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology" is performing system verification. Breaker Failure protection IED can operate protection activity by communicating with other IEDs such as T/L IED, owing to IEC 61850 international standard and digital substation automation system. Accordingly, IED testing process should be changed from the conventional way by electrical contact test on individual IED to system based testing method by network communication. This paper describes how to test BF IED based on substation automation system and testing procedures using UML, which is used to implement S/W design.
Keywords
IEC 61850; Substation Automation; IED; Testing procedure; Breaker Failure; Bus Protection;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 FUNCTIONAL TESTING OF IEC 61850 BASED SYSTEMS, CIGRE Task Force B5.32, 2008
2 'UML을 이용한 객체지향 분석/설계', 삼성SDS, 2006
3 이남호, 장병태, 'IEC 61850 규격 기반 디지털 변전자동화 시스템 통신성능 시험에 관한 연구', Trans. KIEE. Vol. 57 No1,pp.14-19, 2008   과학기술학회마을