Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2000.07a
- /
- Pages.552-554
- /
- 2000
A study on the planning for construction and expanding of distribution substation considering contingency
상정사고를 고려한 배전용 변전소 신,증설 계획 수립에 관한 연구
- Choi, Sang-Bong (KERI) ;
- Kim, Dae-Kyeong (KERI) ;
- Jeong, Seong-Hwan (KERI) ;
- Bae, Jeong-Hyo (KERI) ;
- Ha, Tae-Hyun (KERI) ;
- Lee, Hyun-Goo (KERI) ;
- Han, Sang-Yong (KEPCO)
- 최상봉 (한국전기연구소) ;
- 김대경 (한국전기연구소) ;
- 정성환 (한국전기연구소) ;
- 배정효 (한국전기연구소) ;
- 하태현 (한국전기연구소) ;
- 이현구 (한국전기연구소) ;
- 한상용 (한국전력공사)
- Published : 2000.07.17
Abstract
This paper presents algorithm to plan construction and expanding of substation considering contingency accidents by proposing utilization factor according to configuration of bank system. In this paper, at first, proper sphere of supply area in each district which could be standardized with respect to its supply capacity is established under assumption which was made long term load forecasting in district respectively. Secondly, goal of utilization ratio according to configuration of substation bank was set to keep reliability by remaining sound bank when it happen to one bank accidents Finally, optimal construction and expanding of substation considering economy and reliability simultaneously about substation to exceed these ratio could be anticipated.
Keywords