A Study of the Regulations for Calculation of Acceleration Costs on Construction Work (건설공사 공기단축으로 인한 추가비용의 산정규정에 관한 연구)

  • Min, Byeong-UK;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.409-417
    • /
    • 2017
  • The study is concerned with doing research on the plan to prevent the dispute occurring between contract parties regarding the additional cost generated when the construction period is shortened during construction work. After the review of the claim cases and the judgment cases of the court regarding the additional cost caused by the shortened construction period, the representative problem is the incomplete regulations on calculating the additional cost. In the 1st stage of the results of the research on the problem, the procedure handling the additional cost is presented, and the process of planning and approving the shortening of the construction period is gone through in the stage of the procedure to prevent the dispute on the additional cost between contract parties. In the 2nd stage, the plan on enacting and revising the regulations on removing the incomplete problems of the current regulations relating to the calculation of the additional cost. The basis for the advanced contract management is provided by resolving the incomplete problems of the current regulations relating to the shortening of the construction period with the prevention of a dispute and the resultant loss.

An Experimental Study on Strength Properties of Early Strength Concrete for Reduction of Working Period in Apartment (공동주택 공기단축을 위해 개발된 조강 콘크리트의 강도 발현 특성에 관한 연구)

  • Jung, Yang-Hee;Lee, Jae-Hyun;Keum, Kyoung-Hun;Lee, Won-AM;Kim, Sun-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.157-160
    • /
    • 2009
  • The decision of the Form removal time which leads the early assuring strength of the concrete from Apartment construction is the fact which is important from Reducing the period of works and the economical efficiency side. Especially, with Complex building of recent times the same Tall building and Multiple Apartment Site which only follows in upgrade of interior construction of apartment site and shortening the frame construction period becomes very, importantly is the actual condition where the effort which is various for this is attempted. But is caused by with limit and economical efficiency problem of case concrete early strength revelation of most and is not put to practical use is the actual condition. Develops concrete mixture which is a utility from the research which sees hereupon and the effect which is economic leads construction duration shortening under maximizing boil.

  • PDF

A Study on Early-strength Development of Concrete Using Accelerating AE Water Reducing Agents for the Estimation of Optimum Duration (촉진형 AE감수제를 사용한 콘크리트의 최적공기산정을 위한 조기강도 발현 특성 연구)

  • Lee, Joo-Hun;Sa, Soon-Heon;Ji, Suk-Won;Jeon, Hyun-Gyu;Seo, Chee-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.91-94
    • /
    • 2006
  • The way to shorten a construction period is considered to an very important technology development element as reducing the formwork removal periods with promoting strength revelation own concrete. This study executed experiment to review usability of early strength revelation chemical admixture which is judged in ways effective with premature removal of form about concrete. Use of early strength revelation AE water reducin admixture is apperaing so that strength revelation by early hydration promotions is excellent. The results of being applied proposed work process are that compressive strength are appeared more than 5MPa within 16 hours so that removal of vertical form was possible. the concrete compressive strength satisfied with a more than 2/3 of specified concrete strength for removal of horizontal form are appeared in 42 hours of 27 MPa proportioning strength, in 36 hours of 30, 35 MPa proportioning strength so that the 6 days cycle time of concrete structural frame work is cut by 2 days as shortening delayed period in works of removing slab forms. So construction cost reductions and a construction period shortening are judged so that it is possible.

  • PDF

Economic Analysis of Neighborhood Facility using the U-flanged Truss Hybrid Beam (U-플랜지 트러스 복합보를 사용한 근린생활시설의 경제성 분석)

  • Oh, Myoung Ho;Park, Sung Jin;Kim, Young Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.21 no.3
    • /
    • pp.77-84
    • /
    • 2021
  • In this study, In order to apply the U-flanged truss hybrid beam to the actual construction site, the structural design of the basic module of the middle and low-rise neighborhood living facilities was performed according to the Korea Design Standard, and the construction cost and construction period were compared with the traditional reinforced concrete structure system. As a result of analyzing the construction cost for the basic module, if the U-flanged truss hybrid beam and D-Deck slab system are used, the construction cost can be reduced by 86% compared to the traditional reinforced concrete structure system. In addition, as a result of analyzing the construction period for a floor area of 1,000m2, using the U-flanged truss hybrid beam and D-Deck slab system can save 2.0days in construction period compared to the traditional reinforced concrete structure system. Therefore, the U-flange truss hybrid beam can secure sufficient economic feasibility compared to the existing reinforced concrete method in terms of cost reduction and shortening of construction period.

A Study on the Heat Performance of Single Layered Bubble Sheet Using Phothothermal Materials (광발열 소재를 활용한 1중 버블시트의 발열성능 검토)

  • Lee, Hyeon-Jik;Hu, Yun-Yao;Lee, Seung-Min;Han, Jun-Hui;Kin, Jong;Han, Min-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.223-224
    • /
    • 2023
  • This study compared the curing temperature of the bubble sheet and the photothermal insulation sheet incorporating carbon-based photothermal materials to reduce concrete curing time as a part of shortening construction period. As a result of the experiment, bubble sheet with photothermal material B is judged to be effective in shortening the curing time under hot environment.

  • PDF

Analysis of Construction RCB Exterior Wall Formwork Placing High on Nuclear Power Plant (원자력 발전소 RCB 외벽 거푸집 1단 타설 높이별 시공성 분석)

  • Song, Hyo-Min;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.205-206
    • /
    • 2014
  • It is very important to reduce the construction duration of the Reactor Containment Building (RCB) when considering the more than 50 months on average from concrete placement to completion. The purpose of this study attempts to evaluate the single-stage workability of the system given a change in the height of the setting of RCB exterior wall formwork to be used in nuclear power plant construction. As a result of this study, it is possible height of 3.5m~4m uses formwork when analyzing the construction period and material costs an increase in formwork by concrete lateral pressure, to ensure the workability of the RCB exterior wall formwork. Through this study, I want to provide as basic data for the improvement of workability and RCB shortening the construction period.

  • PDF

A Study on the Proposal of Passive Precast Concrete Modular Housing Development Plan in the Middle East such as Saudi Arabia (사우디 등 중동지역의 패시브형 PC모듈러 주택개발 방안 제안)

  • Lim, Seok-Ho;Chung, Joon-Soo;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.121-122
    • /
    • 2023
  • Existing modular research has been mainly focused on S (shelter structure) and I (infill interior finishing material), and considerable research has been conducted, and the results are being proposed. However, in the case of the rest (exterior materials and windows, etc.), existing construction methods and materials are borrowed, and supporting hardware members and insulation materials are constructed on site, which acts as a factor hindering overall shortening of the construction period. That is, since the advantages and characteristics of modularity cannot be utilized in the absence of modular cladding, manufacturing of cladding is required. Therefore, it is necessary to develop a cladding system that can drastically reduce the construction period in factories while considering the structural characteristics of PC modulars.

  • PDF

The Construction of CAE Process for Die Development Period Shortening (금형 개발 기간 단축을 위한 CAE(전공정해석) PROCESS 구축)

  • Kang D. K.;Jung I. S.;Ha K. Y.;Lee S. H.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2003.08a
    • /
    • pp.41-52
    • /
    • 2003
  • The tendency of current die manufacturing is focusing into development period shortening and panel quality improvement. This brings change of manufacturing process. In existing process, depended on experience, we were faced on a limit of sufficiency in this focus. Thus, we have attempted to make a conquest of that by constructing a process of CAE. Our attempt apply not only draw die formability but also trimming and flanging die formability with simulation of sheet metal. In this paper, we publish effects that were obtained by constructing a process.

  • PDF

Application of the Seismic Response Reduction Technology for Boramae Deokyo Building Remodeling (보라매 대교빌딩 리모델링을 위한 지진응답 저감기술 적용사례)

  • Park, Young-Mi;Park, Ki-Hong;Jo, Seong-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.134-136
    • /
    • 2013
  • In general, the seismic retrofit is almost essential to extend and remodel aged buildings. Because domestic seismic design code has been enhanced, seismic performance should be secure for aged building remodeling. Seismic response reduction device (damper) is lately appling to ensure seismic performance. This device is economical efficiency method that can reduce the load to foundation and the range of structural reinforcements, shorten of construction period. New shaped steel damper was applied for extension and remodeling construction for Boramae Deakyo building. As a result, the economy and shortening of construction period was achieved.

  • PDF