• Title/Summary/Keyword: shipyard

Search Result 370, Processing Time 0.036 seconds

Influence Factors for the Safety Assessment on the GPE Blocks during On-shore Transportation (GPE 블록의 연안운송시 안전성 평가를 위한 영향인자)

  • Kim, Sung-Chang;Hong, Ki-Sup;Shin, Dae-Kyun;Yu, Byeong-Seok;Kim, Kwan-Hong;Suh, Yong-Seok;Paeck, Se-Jin
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.6
    • /
    • pp.595-602
    • /
    • 2009
  • Great number of ships has been built by Korean Shipyards since early of 2,000 due to the expanding worldwide trade. Most of shipyards have enlarged the weight of erection block and many blocks have been assembled in block fabrication factories outside the shipyards to reduce the shipbuilding period. Especially, Giga blocks that exceed 2,000 tons are often assembled by the block fabrication factories outside the shipyard. Generally, the blocks are transported to building dock in shipyard by towing barges. Accident can be occurred during the sea transportation and it may bring about not only the delay of delivery but also a disaster on the ocean environments. Transportation condition of GPE (Grand Pre-Erection) block differs from the ocean going conditions of marine vessels. Special consideration should be included before transportation work in order to guarantee the safety of GPE blocks and barge carriers. In this paper, several examples, which have been investigated to set up the safety standard of transportation of the GPE blocks on coastal routes, are introduced. For the barge transportation on coastal sea route, the design criteria are discussed, considering the design wave, the acceleration induced by wave, structural strength, and the fixture condition of blocks.

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.13 no.1
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.

A Study on the Development and Application of a Small Shipyard Customized Production Process Planning and Management System (소형조선소 맞춤형 생산공정 계획관리 시스템 개발 및 적용에 관한 연구)

  • Kim, Young-Hun;Hong, Min-Jong;Baek, Seung-Ju;Lee, Won-Seok;Jo, Yong-Hwa;Lee, Dae-Hyung;Lee, Hoon-Sick;Na, Sung-Tae
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.1
    • /
    • pp.79-86
    • /
    • 2022
  • In general, since the types and types of ships, so complex and various variables are included to measure the amount of construction work. In addition, it is mot easy to predict the schedule or the number of working hours before ship construction, and it is also mostly inaccurate. As a result, the master plan is manually drawn up by the expert's experience, but there are limitations due to various factors. Medium and large shipyards are operating APS(Advanced Planning and Scheduling) system that reflects industrial characteristics to improve productivity in the planning stage, and utilize information from systems such as ERP(Enterprise Resource Planning) system and MES (Manufacturing Execution System). On the other hand, small shipyards rely mostly on manual work such as Excel work based on the experience of the workers. Therefore, this study intends to develop a master plan management system that can efficiently manage the production process from the business planning stage in consideration of the characteristics of small shipyards.

Reinforcement Learning for Minimizing Tardiness and Set-Up Change in Parallel Machine Scheduling Problems for Profile Shops in Shipyard (조선소 병렬 기계 공정에서의 납기 지연 및 셋업 변경 최소화를 위한 강화학습 기반의 생산라인 투입순서 결정)

  • So-Hyun Nam;Young-In Cho;Jong Hun Woo
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.60 no.3
    • /
    • pp.202-211
    • /
    • 2023
  • The profile shops in shipyards produce section steels required for block production of ships. Due to the limitations of shipyard's production capacity, a considerable amount of work is already outsourced. In addition, the need to improve the productivity of the profile shops is growing because the production volume is expected to increase due to the recent boom in the shipbuilding industry. In this study, a scheduling optimization was conducted for a parallel welding line of the profile process, with the aim of minimizing tardiness and the number of set-up changes as objective functions to achieve productivity improvements. In particular, this study applied a dynamic scheduling method to determine the job sequence considering variability of processing time. A Markov decision process model was proposed for the job sequence problem, considering the trade-off relationship between two objective functions. Deep reinforcement learning was also used to learn the optimal scheduling policy. The developed algorithm was evaluated by comparing its performance with priority rules (SSPT, ATCS, MDD, COVERT rule) in test scenarios constructed by the sampling data. As a result, the proposed scheduling algorithms outperformed than the priority rules in terms of set-up ratio, tardiness, and makespan.

A hybrid genetic algorithm for the optimal transporter management plan in a shipyard

  • Jun-Ho Park;Yung-Keun Kwon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.12
    • /
    • pp.49-56
    • /
    • 2023
  • In this study, we propose a genetic algorithm (GA) to optimize the allocation and operation order of transporters. The solution in the GA is represented by a set of lists each of which the operation order of the corresponding transporter. In addition, it was implemented in the form of a hybrid genetic algorithm combining effective local search operations for performance improvement. The local search reduces the number of operating transporters by moving blocks from a transporter with a low workload into that with a high workload. To evaluate the effectiveness of the proposed algorithm, it was compared with Multi-Start and a pure genetic algorithm through a simulation environment similar in scale to an actual shipyard. For the largest problem, compared to them, the number of transporters was reduced by 40% and 34%, and the total task time was reduced by 27% and 17%, respectively.

A Study on a Novel Pipe Flushing System within Dry Dock Ship Pipelines (건조 선박 배관 내의 새로운 유세정 시스템에 관한 연구)

  • Jin-Cheol Noh;Min-Sik Kim;Yung-Deug Son
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.30 no.2
    • /
    • pp.233-238
    • /
    • 2024
  • The pipe cleaning process is a crucial step in the shipbuilding process of a shipyard. It involves removing foreign substances from the inside of the pipes before moving on to the stage of testing equipment after installing the pipes. If there are foreign substances inside the pipes and the equipment is tested, the foreign substances can enter the high-priced equipment and become a factor in the breakdown of pumps, gears, bearings, and other components. Especially in the case of pumps or hydraulic valves, even small foreign substances can lead to major accidents if they enter the equipment, and such equipment accidents can be a potential cause of major disasters, leading to accidents involving workers operating the equipment in the vicinity. Therefore, it is a process that shipyard customers, who are shipowners, also focus on and manage very intensively. To solve these problems, this study developed a system that can increase the cleaning effect of the cleaning fluid inside the pipes by increasing the flow of the cleaning fluid inside the pipes in the existing pipe cleaning method.

Smart Device Based Localization for Ship Block Logistics

  • Song, Kwon-Soo;Lee, Sangdon;Cho, Doo-Yeoun
    • Journal of Korea Multimedia Society
    • /
    • v.15 no.12
    • /
    • pp.1506-1516
    • /
    • 2012
  • In a ship block logistics application, acquisition of locations is required in order to identify location of the ship blocks. A Smart device equipped with a GPS sensor can be used as a mobile client for a ship block logistics application. However the precision of GPS components on a commercial smart device is not high enough. Therefore, using the GPS for localization may produce significant positioning errors in a ship block logistics system. This paper proposes a method to reduce errors in measuring locations using a smart device. Based on the knowledge of how the location information is used in a ship block logistics application, and the predictability of the client's moving line based on geographical layout of a shipyard area, our proposed technique enables a better prediction of the ship blocks location. Performance evaluation shows that the proposed technique can significantly reduce the positional error.

A Study on Analysis Process of Customer Requirements and Functional Requirements for a Ship Production Simulations (조선해양 생산 시뮬레이션 요구 및 기능 분석 프로세스 연구)

  • Hwang, Ho-Jin
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.6
    • /
    • pp.449-457
    • /
    • 2011
  • The productivity improvement is indispensible to shipbuilding industry for maintaining the world's No. 1. Simulation based production recently has been an issue as prat of efforts to high efficiency production and Korean shipyards requests simulation system tools specialized in a shipbuilding industry. IT convergence project between conventional shipbuilding industry and IT simulation technology has been carried out and integrated simulation framework was proposed as a way to overcome sporadic developments. The framework would provide reusability of kernels and modules and also ensure for expansibilities to other production simulations. The fact that production simulation system should reflect shipyard requirement would be most important. We suggest an analysis process of customer requirements and functional requirements for production simulations. It is partially based on concepts of software engineering and axiomatic design. The process is applied to a design of configuration for simulation framework.

An Automatic Block Allocation Methodology at Shipbuilding Midterm Scheduling (조선 중일정 블록 배량 계획 자동화 연구)

  • Hwang, InHyuck;Nam, SeungHoon;Shin, JongGye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.6
    • /
    • pp.409-416
    • /
    • 2012
  • Most of the shipbuilding scheduling researches so far have been conducted with stress on the dock plan. That is due to the fact that the dock is the least extendable resource in shipyards and its overloading is difficult to resolve. However, once the dock scheduling is completed, it is also important to make a plan that make the best use of the rest of the resources in the shipyard, so that any additional cost is minimized. This study automates block allocation process by analyzing the existing manual process that designates production bays for the blocks during the midterm planning. Also, a planning scenario validation method is suggested, where block allocation scenarios based on diagrams are edited and simulated.

An Optimization of Ship Building Mix under N Different Docks (N개의 다른 도크를 고려한 선박 건조 혼합의 최적화)

  • Kim, Yearn-Min
    • IE interfaces
    • /
    • v.22 no.1
    • /
    • pp.38-43
    • /
    • 2009
  • This paper deals with two most important problems, from both practical and theoretical standpoints, arising when building the ships in N different docks. Such docks have become core components of modern ship construction. One problem is to minimize the number of building docks in the shipyard, while the other is to keep the usage rate of resources fed into docks as constant as possible. In this paper the combined problem is formulated as a single-integer programming model. The LP-relaxation of this model is solved by column-generation techniques. Practical applications of this formulation are also discussed.