• Title/Summary/Keyword: schedule network

Search Result 275, Processing Time 0.042 seconds

Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

A study on the Human Resource Management through Application of Daily Scheduling Check System (일일 공정 Check System을 활용한 인력관리 사례 연구)

  • Park Chan-Jeong;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.124-132
    • /
    • 2004
  • A human resource management of the general contractors is to mostly deal with daily input by each subcontractor in construction fields. However, this way has some limitations; the identification of proper human-input and productivity, preventive activities or efforts for minimizing schedule delay. The reason why these limitations are that few systematic efforts through a coordinated field administration with the construction schedule planning and human resources. Therefore, on the basis of the construction schedule planning, human resource management of subcontractors is necessary to make for an improvement in construction schedule control. Daily Scheduling Check System(DSCS), as the linked human resources on an existed CPM scheduling software, was developed and this paper then verified validity and effectiveness of using the DSCS for the framework of some actual apartment construction projects

Design of Protocol for Collaborative Multimedia Applications (협동적 멀티미디어 응용을 위한 프로토콜의 설계)

  • Hwang, Een-Jun
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.8 no.1
    • /
    • pp.25-35
    • /
    • 2002
  • Many multimedia presentation applications involve retrieval of objects from more than one collaborating server. Presentations of objects from different collaborating servers might be interdependent. This implies that objects should be retrieved from remote servers and delivered continuously according to given time constraints. Such applications need an estimate of the avaliable network resources to each of the collaborating servers and local system resources in order to identify a schedule for retrieving the objects composing the presentation. A collaborating server can suggest modifications of the retrieval schedule depending on its load. these modifications can potentially affect the retrieval schedule for other collaborating applications. Hence, a sequence of negotiations has to be carried out with the collaborating servers in order to commit for a retrieval schedule of the objects composing the presentation. In this paper, we propose an application sub-layer protocol, RLCP(Resource Lock Commit Protocol), for handling the negotiation and commitment of the resources required for a collaborative multimedia presentation and apply it to distributed video presentation application.

Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF

A Neural Network Model for Selecting a Piling Method of Building Construction (건축공사 말뚝공법 선정을 위한 신경망 모델 개발)

  • Cheon Bong-Ho;Koo Choong-Wan;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.317-322
    • /
    • 2004
  • As a construction project in urban area tends to be high-rise and huge, the importance of the project's underground work, in terms of the cost and the schedule, is gradually increasing. It's extremely significant to choose a proper filing method, at the stage of underground work. However, in piling work many change orders have been occurred since a piling method is experientially selected based on uncertain information and many earth factors to consider. It has effects on the cost and the schedule of the project. In this study, we have suggested a decision model for piling method that can be used to determine and verify the suitable piling method in design and pre-construction phase of a project. Based on historical data, a neural network model has already proven to be efficient. The tests of the model for selecting a suitable piling method have progressed exactly with the data of 150 piling works which were done room 2000 to 2004 in Korea. The optimization or the developed neural network model has progressed with the data for teaming. The validity of the neural network model has been verified.

  • PDF

Bandwidth-based Nonlinear Pricing on a Shared Link (공유 링크에서의 대역폭 기반 비선형 요금제)

  • Cho, Moon-Kyo;Park, Myeong-Cheol;Choi, Mun-Kee
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.32 no.11B
    • /
    • pp.709-717
    • /
    • 2007
  • Pricing a network service aims for congestion control of the network as well as economic efficiency. A monopolistic supplier providing users with a network service on a shared link needs a pricing schedule that maximizes revenue under the link's bandwidth constraint and guarantees the bandwidth purchased by the users. In that case, nonlinear pricing is an efficient scheme which meets both requirements. This study reviews how nonlinear pricing can be applied to the network service under the constraint and shows that the nonlinear pricing may result in a fixed unit price of bandwidth as linear pricing when demand characteristics of the users follow a power law. Also, the way how the provider with incomplete information on the demand distribution seeks for the optimal pricing from the degree of the network congestion is introduced and the relationship between the development direction of the Internet and internet pricing is considered based on the results of the study.

The Design of Service Quality Information Systems for Telephone Communication (전화통신 서비스품질정보시스템 설계에 관한 연구)

  • 염창선
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.3
    • /
    • pp.97-108
    • /
    • 2001
  • The information system for measuring and analyzing service quality of telephone network is designed on the service quality scheme recommended by ITU(International Telecommunication Union) in this study. The information system is composed of the equipments which measure service quality and the systems which analyze the measured data. The schedule algorithm for effectively operating measurement equipments which are located over public switched telephone network is proposed. The functions of the Information system are Introduced. The information system improves the service quality effectively.

  • PDF

Parallel Machine Scheduling with an Aid of Network Flow Model (네트워크 흐름 모형을 이용한 병행기계(併行機械) 시스템의 스케쥴링)

  • Chung, Nam-Kee;Park, Hyung-Kyu;Yang, Won-Sub
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.15 no.2
    • /
    • pp.11-22
    • /
    • 1989
  • The problem of scheduling n-jobs on m-uniform parallel machines is considered, in which each job has a release time, a deadline, and a processing requirement. The job processing requirements are allocated to the machines so that the maximum of the load differences between time periods is minimized. Based on Federgruen's maximum flow network model to find a feasible schedule, a polynomially bounded algorithm is developed. An example to show the effectiveness of our algorithm is presented.

  • PDF

Optimal Time Slot Assignment Algorithm for Combined Unicast and Multicast Packets

  • Lee, Heyung-Sub;Joo, Un-Gi;Lee, Hyeong-Ho;Kim, Whan-Woo
    • ETRI Journal
    • /
    • v.24 no.2
    • /
    • pp.172-175
    • /
    • 2002
  • This paper considers a packet-scheduling algorithm for a given combined traffic of unicast and multicast data packets and proposes a hybrid router with several dedicated buses for multicast traffic. Our objective is to develop a scheduling algorithm that minimizes schedule length for the given traffic in the hybrid router. We derive a lower bound and develop an optimal solution algorithm for the hybrid router.

  • PDF

The Concept of Schedule and Cost Progress Integrated Management on the BDM Network (BDM 네트워크 공정 및 비용 진도율 통합관리 개념)

  • Kim, Seon-Gyoo;Lee, Yong-Hyun;Noh, Seong-Beom;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.54-64
    • /
    • 2011
  • Almost 40 years have been passed since the CPM was introduced to the construction industry in Korea. However most of construction projects in Korea do not prepare the CPM schedule neither operate it after established manually, as well as still depend on the Bar-chart schedule only. One of these reasons is because the CPM schedule does not reflect the site works realistically, it makes so difficult to recognize the actual progress clearly in visual format, and it is impossible to integrate and manage the time and cost oriented work progresses effectively. This paper proposes new concept of progress management that is able to integrate and manage the time oriented schedule progress and earned value oriented cost progress while maintaining the merits of CPM although the CPM schedule summarized automatically within a schedule hierarchy by the BDM that is a new CPM technique. We expect that this concept could make the applications of CPM technique to the domestic construction industry popular and help the advancement of the construction management in Korea as well.