A study on the Human Resource Management through Application of Daily Scheduling Check System  

Park Chan-Jeong (LG건설)
Park Hong-Tae (국립 천안공업대학, 토목공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.5, no.1, 2004 , pp. 124-132 More about this Journal
Abstract
A human resource management of the general contractors is to mostly deal with daily input by each subcontractor in construction fields. However, this way has some limitations; the identification of proper human-input and productivity, preventive activities or efforts for minimizing schedule delay. The reason why these limitations are that few systematic efforts through a coordinated field administration with the construction schedule planning and human resources. Therefore, on the basis of the construction schedule planning, human resource management of subcontractors is necessary to make for an improvement in construction schedule control. Daily Scheduling Check System(DSCS), as the linked human resources on an existed CPM scheduling software, was developed and this paper then verified validity and effectiveness of using the DSCS for the framework of some actual apartment construction projects
Keywords
Framework; Network; Schedule delay; Daily Scheduling Check System(DSCS);
Citations & Related Records
연도 인용수 순위
  • Reference
1 Peer, S. and Selinger, 'Parameters Affecting Construction Time in Housing Projects', Proceedings of 곧 Second International Symposium on Lower-Cost Housing Problems, University of Missouri, Rolla, Apr., 1972 pp 217-220
2 L.A.Digman, 'PERT/LOB Life Cycle Technique', Journal of Industrial Engineering, February, 1967, pp 154-158
3 김한수, 건설산업 및 건설생산성과정의 효율성과 생산성 향상을 위한 체크 리스트, 한국건설관리학회, 2003. 6., pp39-40
4 박상곤, 건설현장에서의 E-Construction 구축 및 활용사례 연구, 한국건설관리학회, 2003. 6. pp 34-36
5 문정문외 1인, 건설공정 낭비 제거를 통한 생산성 향상연구, 한국건설관리학회, 2002. 12
6 권태중, 원자력 발전소 설계 공정관리 사례연구, 한국건설관리학회, 2003. 9. pp15-18
7 윤유상외 5인, 작업구역의 합리적 분할에 의한 건축마감공사의 공정 운영 개선 연구, 한국건설관리학회, 3003. 6.,pp59-65
8 조영석, 원자력 발전소의 효율적인 시공관리를 통한 생산성 향상 연구, 한국건설관리학회, 2002. 6., pp9-13
9 James J. O'Brien, M. ASCE, 'VPM Scheduling for High-Rise Buildings', Journal of the Construction Division, Proceeding of the ASCE, Vol. 101, No. CO4, December, 1975, pp895-905